Entry  Thursday, May 17, 2012, 13:24, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, , Problems/Solutions, Solid residues found on EE SiC#27_after_teststand.pdfSiC#27_clean_EE.pdf
 Thursday, May 17, 2012, 13:15
After the test-stand, the EE was removed for inspection.  It was discovered that there were some solid residues coated on the extraction electrode
and the common plate, but the ionizer tube was clean (see attachment#1).  Some samples were collected and will try to do some analysis.  This
Entry  Tuesday, June 26, 2012, 18:30, Anders Mjos, , , , , , , Problems/Solutions, Crack in source tray insulator Cracked_insulator.pdf
 A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment.
Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.
Entry  Wednesday, July 04, 2012, 09:22, Friedhelm Ames, , , , , , , Problems/Solutions, turbo pumps stopped 
turbo pumps stopped to prepare for venting for anode short investigation.
    Reply  Wednesday, July 04, 2012, 13:07, Anders Mjos, , , , , , , Problems/Solutions, water lines purged 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps stopped to prepare for venting for anode short investigation.
    Reply  Wednesday, July 04, 2012, 15:33, Anders Mjos, , , , , , , Problems/Solutions, short in anode photo_1.JPGphoto_3.JPG


    
        
            Friedhelm Ames wrote:
        
        
            
            A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater
Entry  Thursday, July 05, 2012, 10:59, Friedhelm Ames, , , , , , , Problems/Solutions, water tripping in front of HV power supplies 
Found some water tripping in front of the high voltage power supplies rack from the water lines at the ceiling. Plastic sheets have been put on top of
the racks and MCR has been informed.
Entry  Thursday, July 05, 2012, 18:02, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current TMSMB1_2012_07_05.PNG
The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall probe read back and in the beam
current at Fc6.
    Reply  Thursday, July 05, 2012, 18:10, Friedhelm Ames, , , , , , , Problems/Solutions, fluctuations in magnet current 


    
        
            Friedhelm Ames wrote:
        
        
            
            The current at the magnet power supply TMS:MB1 shows fluctuations every 1-2 minutes. The same can be seen in the Hall
Entry  Tuesday, July 10, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Turbo replaced - cleaning chamber recommended 
A new turbo has been installed. Eddie said the other one had       crashed but not catastrophically. He recommends the test stand
be       wiped clean before pumping because there is a fine layer of       Aluminum dust on the chamber base.
 
Entry  Wednesday, July 11, 2012, 15:30, Anders Mjos, , , , , , , Problems/Solutions, Restarting turbos after power bump 
Wednesday, July 11, 2012, 15:27: Started TSGTP1A and 1B
Wednesday, July 11, 2012, 15:31: Started TSMTP2 and 6
Wednesday, July 11, 2012, 15:33: TMS tubos at speed. Vacuum 4.8E-7
Entry  Thursday, July 12, 2012, 09:05, Anders Mjos, , , , , , , Problems/Solutions, Shut down TSGTP1A - bearing noise 
Shut down TSGTP1A due to noise (possibly from bearings) after consulting Edi.
Entry  Thursday, July 12, 2012, 13:49, Anders Mjos, , , , , , , Problems/Solutions, Aluminum oxide found inside TSHSV1 
Aluminum oxide found inside TSHSV1 and the copper line to TSHUHV1.
SV1 replaced and copper line cleaned.
Entry  Tuesday, July 17, 2012, 10:10, Anders Mjos, , , , , , , Problems/Solutions, Gas lines leak checked - air supply leak on manifold 
Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No
response to He.
Leak rate around low E-8 with regulation valve open.
    Reply  Wednesday, July 18, 2012, 14:08, Anders Mjos, , , , , , , Problems/Solutions, Air supply leak on manifold fixed 


    
        
            Anders Mjos wrote:
        
        
            
            Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece.
Entry  Thursday, July 19, 2012, 08:42, Anders Mjos, , , , , , , Problems/Solutions, Leak checking source chamber - leak found on front door 
Due to high vacuum a leak check will be done on the system.
Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec
Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.
    Reply  Thursday, July 19, 2012, 11:31, Anders Mjos, , , , , , , Problems/Solutions, Wiped o-rings and sealing faces 


    
        
            Anders Mjos wrote:
        
        
            
            Due to high vacuum a leak check will be done on the system.
Entry  Thursday, July 19, 2012, 12:59, Anders Mjos, , , , , , , Problems/Solutions, Leak checking doors - no response 
Thursday, July 19, 2012, 12:57: Doors leak checked. No response. Base rate 1.6E-8 atm-cc/sec. TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. TSG:CG1A
0.014 Torr.
Entry  Friday, August 10, 2012, 13:48, Anders Mjos, , , , , , , Problems/Solutions, He line leak checked - leak fixed 
A major leak was found on the connection to the regulation valve on the He bottle. Ferrule replaced. System leak checked.
After He bottle: base 5E-6, no response to He spray
AfterSV1: base 5E-7, no response
Entry  Monday, August 13, 2012, 08:39, Anders Mjos, , , , , , , Problems/Solutions, Started Archivers 
Archivers not running this morning. Started both ISACT and SOURCES