  460   Saturday, August 29, 2015, 14:33 Anders Mjos      Problems/SolutionsRestarted IOC after power outage Saturday, August 29, 2015, 15:50:
Turbos started
  
  461   Wednesday, September 09, 2015, 08:54 Anders Mjos      In progressVenting Wednesday, September 09, 2015, 08:53:
Turbos stopped

Friday, September 11, 2015:
  
  463   Monday, September 14, 2015, 08:38 Anders Mjos      Problems/SolutionsRP2 increased pressure e-fault submitted and vacuum group
(Edi) notified.
Monday, September 14, 2015, 09:33:
  
  464   Thursday, September 17, 2015, 14:05 Anders MjosTest TargetLP-SIS    In progressNew centre block test 

    
        
  
  465   Friday, September 18, 2015, 11:35 Anders Mjos      Problems/SolutionsTMS:TP6 nor workingfound in fault state this morning. Edi
consulted and fault report submitted.
  
  466   Wednesday, September 30, 2015, 16:28 Anders MjosTest Target wrapped with heat shieldsLP-SIS    In progressNew centre block test 

    
        
  
  467   Friday, October 02, 2015, 08:35 Anders Mjos      Problems/SolutionsVenting beam line for TP exchange Friday, October 02, 2015, 08:35:
Turbo stopped
  
  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed outContacted Graham W. (controls) to have
a look. It turned out to be a limit switch
problem. Removed and reinstalled limit switch
  
  472   Wednesday, October 14, 2015, 16:13 Anders Mjos      Problems/SolutionsTMS:RP2 replaced by vacuum group. The pump was making
more noise than usual.
  
  473   Thursday, October 15, 2015, 11:19 Anders Mjos      Problems/SolutionsRight side TGHT connector block removedThe keensert has been worn out and will
be replaced.
The keensert was re-tapped and the
 Photo_2015-10-16_11_57_45_AM.jpgPhoto_2015-10-16_11_57_51_AM.jpg 
  474   Friday, October 16, 2015, 12:26 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06:
Started turbos.
 2015-10-22_TS_Leak.docx 
  475   Monday, October 19, 2015, 09:45 Anders Mjos      Problems/SolutionsIG1 filament deadWill went chamber to replace the filament.
See e-fault 8501 
Monday, October 19, 2015, 09:43:
  
  476   Monday, October 19, 2015, 15:39 Anders Mjos      Problems/SolutionsExhaust came off the new RP2

    

       
            
  
  477   Monday, November 02, 2015, 12:47 Anders Mjos      Problems/SolutionsRemoved Swagelok T from rioght TGHT water linesMico replaced the T's with copper tube
and leak checked.
Monday, November 02, 2015, 12:46:
  
  478   Tuesday, November 03, 2015, 09:00 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14Tuesday, November 03, 2015, 08:59: Starting
TGHT ramping to 580 A at 1 A/min

Thursday, November 05, 2015,
  
  479   Monday, November 16, 2015, 14:52 Anders Mjos      In progressCurrent measurementInstalled Cu-shunts on TGHT and TBHT terminals.
HS water looped.
 Monday, November 16, 2015,
 2015-11-17_High_Current_Test.png2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx 
  480   Tuesday, November 17, 2015, 11:27 Anders Mjos      Problems/SolutionsRan RP2 with gas ballast for 15 minTo recover performance  2015-11-17_RP2_performance.png 
  481   Wednesday, December 02, 2015, 14:50 Anders Mjos      Problems/SolutionsNitrogen supply for venting temporarely from bottleNo supply of N through the piping due to
work on the N tanks. Confirmed with Geoff
Hodgson. ISIS supply is shut off. Using a
  
  482   Wednesday, December 02, 2015, 15:30 Anders Mjos LP-SIS     New centre block testNew 2x 9-pin connector grounding tool with
gripper installed.
Wednesday, December 02, 2015, 15:30:
  
  483   Friday, December 18, 2015, 11:44 Anders Mjos      Problems/SolutionsIG6 not reading correctlyThe new controller (XGS-600) installed
for IG6 use a different voltage to pressure
conversion than the previous models. This
  