313
|
Tuesday, June 11, 2013, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TPS:Q2, TPSQ4 and TMS:MB1 found off |
Anders Mjos wrote: |
Anders Mjos wrote: |
Anders Mjos wrote: |
Friday, June 07, 2013, 08:42: Restarted Q2, Q4 and MB1
|
Monday, June 10, 2013, 08:16: Restarted Q2 and Q4
|
Monday, June 10, 2013, 16:44: Restarted Q2 and Q4. A dip in coil current and voltage was seen at the same time.
|
Tuesday, June 11, 2013, 08:41: Restarted Q1, Q2 and Q4
Tuesday, June 11, 2013, 10:36: Restarted Q2 and Q4. No sign of sparks
Tuesday, June 11, 2013, 11:06: Restarted Q1, Q2, Q4 and CBC. No sign of sparks
Tuesday, June 11, 2013, 11:52: Restarted Q1, Q2 and Q4
Tuesday, June 11, 2013, 14:40: Restarted Q1, Q2, Q4 and CBC. |
Attachment 1: DipVacuum.png
|
|
|
314
|
Wednesday, June 12, 2013, 20:38 |
Friedhelm Ames | | | | | | | Problems/Solutions | target heater power supply removed | The target heater power supply at the teststand has been removed to replace one in ITE. |
|
315
|
Thursday, June 13, 2013, 10:19 |
Anders Mjos | | | | | | | Done | Pumping down empty chamber | Thursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos started
Thursday, June 13, 2013, 11:00 : Both turbos at speed.
Thursday, June 13, 2013, 11:02 : Vacuum at 7.5E-6 Torr
|
|
316
|
Thursday, June 13, 2013, 11:04 |
Anders Mjos | | | | | | | Problems/Solutions | Viton seals on vacuum chamber doors replaced | See PO# TR193650 |
|
318
|
Thursday, July 11, 2013, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | Bias & EL P/S cleaned | The power supplies were "de-dusted" yesterday by Ray Dube and team. |
|
319
|
Friday, July 12, 2013, 15:52 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:MB1 fuse latched after mass scan | A flash and "thumb" was observed at the end of the mass scan.
Friday, July 12, 2013, 15:51: Ray Dube had a look inside. After the fuse was reset, the Power Supply could operate again.
A power bump was experienced at about the same time as the MB1 fuse latched.
https://web.accel.triumf.ca/isac_elog/Elog_show_result.pl?inid=172266&style=entry#172266
|
|
320
|
Tuesday, July 16, 2013, 15:39 |
Anders Mjos | | | | | | | | Empty | Tuesday, July 16, 2013, 15:39: Roughing
Tuesday, July 16, 2013, 16:01: Starting turbos.
Tuesday, July 16, 2013, 16:10: Turbos at speed.
Tuesday, July 16, 2013, 16:11: Vacuum at 6.9E-6 T |
|
321
|
Tuesday, July 16, 2013, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD coil connector insulator fracture | The right side of the insulator cracked/fractured either as the bolt was tightened or loosened. |
Attachment 1: Photo_2013-07-16_3_36_45_PM.jpg
|
|
|
322
|
Wednesday, July 17, 2013, 12:55 |
Anders Mjos | | | | | | | Problems/Solutions | Controls are removing dust/cleaning their devices | Thursday, July 18, 2013, 08:41: Restarting archivers |
|
324
|
Monday, July 22, 2013, 14:08 |
Anders Mjos | | | | | | | Problems/Solutions | 20V 60A COIL PS installed for FEBIAD Coil Test | By Ray. Note that controls have not been updated yet. |
|
326
|
Tuesday, August 20, 2013, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | TP1B noise - TP1B replacement | TP1B high frequency noise is coming and going. Power is 22W , current 1.1A (other pumps are 11W and 14W, 0.7A)
Edi from vacuum group notified. He will replace the pump today.
Tuesday, August 20, 2013, 08:40: Turbos off. Vacuum 1.4E-7 T
Tuesday, August 20, 2013, 10:01: Started venting.
Turbo has been replaced by Edi.
Tuesday, August 20, 2013, 16:28: Roughing
Tuesday, August 20, 2013, 16:51: Turbos started.
TP1A timed out. Could not open BV1A and restart due to too high backing pressure at CG1A
Wednesday, August 21, 2013, 08:17: Turbos started. Vacuum 0.043 T
Wednesday, August 21, 2013, 08:25: Turbos at speed. TP1B: 1.2A 28W 30 deg C.
Wednesday, August 21, 2013, 08:27: Vacuum at 5.6 E-6 T
|
|
327
|
Friday, August 23, 2013, 11:16 |
Anders Mjos | | | | | | | Problems/Solutions | Possible leak between BV1A, BV1B and PV1 | CG1A is climbing from 0.016 to 0.130 in 30 seconds when isolated.
The leak was confirmed to be between BV1A and PV1 in the bellows. The bellows has been replaced and backing pressure is back to normal values. |
|
328
|
Monday, August 26, 2013, 13:49 |
Anders Mjos | | | | | | | Problems/Solutions | TP1A time out/fault sometime this weekend | Monday, August 26, 2013, 14:07: The turbo could be restarted, but it does not sound happy (Dimo was consulted earlier today). The pump is drawing around 4 A. The current draw is fluctuating between 3.5 and 4.2 A at the same time as backing pressure is spiking from 0.015 to 0.045 T
Monday, August 26, 2013, 15:32:: The turbo failed again. Dimo had a quick look. It will have to be replaced. See e-fault: 6953
Wednesday, August 28, 2013, 08:48: Stopping TP1B. Vacuum at 4.8 E-7 T
Wednesday, August 28, 2013, 10:59: Venting
Anthony has replaced the pump. There was no screen on the existing pump. A screen has been installed in front of the turbo.
Wednesday, August 28, 2013, 14:03: started roughing
Wednesday, August 28, 2013, 14:31: Starting turbos
Wednesday, August 28, 2013, 14:41Turbos at speed
Wednesday, August 28, 2013, 14:43: Vacuum at 2.0 E-5 T |
|
329
|
Wednesday, August 28, 2013, 11:28 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe controller for MB1 removed | Jens Lassen provided a new controller for the Hall prove. With the help from Graham from controls it was reconfigured and is operational again. The magnet must likely be calibrated again. |
|
331
|
Monday, September 09, 2013, 09:12 |
Anders Mjos | | | | | | | Problems/Solutions | Coil power supply back | Ray D. installed the "standard" 6V 200A FEBIAD COIL P/S on Friday morning.It has not yet been tested as water supply was on. |
|
332
|
Monday, September 09, 2013, 09:14 |
Anders Mjos | | | | | | | Problems/Solutions | Ground Electrode cleaned | Monday, September 16, 2013, 17:04: Cleaned GE. Copper shavings were removed from below the guide pins for the Heat Shield. The shavings were sitting on top of the aluminum support. |
Attachment 1: Dirty_GE.pdf
|
|
|
334
|
Tuesday, September 17, 2013, 10:06 |
Anders Mjos | | | | | | | Problems/Solutions | TGHT insulator cracked | The coil insulator has been observed to have cracked earlier. |
Attachment 1: Photo_2013-09-16_3_53_19_PM.jpg
|
|
|
335
|
Wednesday, September 18, 2013, 14:54 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe calibration | New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.
CONST11 = -16.3929
CONST22 = 0.12481
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232
Data and results from Gnuplot
"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO
f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;
Final set of parameters Asymptotic Standard Error
======================= ==========================
a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)
correlation matrix of the fit parameters:
a b
a 1.000
b 0.952 1.000 |
Attachment 1: 2013-09-18_NiOcalibration.png
|
|
|
338
|
Monday, September 30, 2013, 15:19 |
Anders Mjos | | | | | | | Problems/Solutions | New purging valves installed on Heat Shield water circuit | The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.
All paddle wheels have been rotated to allow trapped air to escape the system more easily. |
|
339
|
Thursday, October 03, 2013, 08:43 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 tripped off - controller replaced. | This morning the turbo was found tripped off.
The controller was replaced by Edi on Friday.
Monday, October 07, 2013, 08:28: Starting Turbo
Monday, October 07, 2013, 08:29: Turbo at speed. Vacuum at 4.4E-7 T |
|