206
|
Thursday, September 20, 2012, 14:24 |
Anders Mjos | | | | | | | In progress | Venting - installation of FEBIAD test target for operator training | Thursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20: |
|
|
209
|
Friday, September 21, 2012, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A/B fluctuating | Backing pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01. |
|
|
210
|
Monday, September 24, 2012, 10:31 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS whiteout | Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it. |
|
|
211
|
Monday, September 24, 2012, 13:52 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse | See e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will |
|
|
212
|
Monday, September 24, 2012, 15:25 |
Anders Mjos | | | | | | | Done | TMS RP and TP started | |
|
|
213
|
Tuesday, September 25, 2012, 13:05 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse |
|
|
|
214
|
Tuesday, September 25, 2012, 13:25 |
Anders Mjos | | | | | | | Done | Started turbos after replaced roughing pump | |
|
|
215
|
Tuesday, September 25, 2012, 16:10 |
Aurelia Laxdal | | | | | | | | Conditioning - SiC-HP-FEBIAD for operator training | Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A |
|
|
216
|
Thursday, September 27, 2012, 12:27 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training | The source was used yesterday for operator
training.
Today, I found the source off: the |
|
|
217
|
Friday, September 28, 2012, 09:59 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training - Source Off | Checked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week. |
|
|
220
|
Wednesday, October 10, 2012, 10:47 |
Friedhelm Ames | | | | | | | Failed | found teststand tripped off | turbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown. |
|
|
221
|
Wednesday, October 10, 2012, 17:35 |
Aurelia Laxdal | | | | | | | Failed | found teststand tripped off |
|
|
|
235
|
Thursday, November 29, 2012, 14:15 |
Anders Mjos | | | | | | | In progress | Venting in preparation for RFQ work | Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57: |
|
|
236
|
Thursday, November 29, 2012, 16:21 |
Anders Mjos | | | | | | | | Pumping down | Thursday, November 29, 2012, 16:21: Roughing |
|
|
237
|
Friday, November 30, 2012, 10:42 |
Anders Mjos | | | | | | | | Venting | |
|
|
238
|
Friday, November 30, 2012, 12:04 |
Anders Mjos | | | | | | | In progress | 9-pin connector installation work in progress | in preparation for RFQ testing. By Sebastian
and Anders
An insulated 9-pin D-sub connector |
|
|
239
|
Monday, December 03, 2012, 15:33 |
Anders Mjos | | | | | | | In progress | Leak check of 9-pin feed through | Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through. |
|
|
240
|
Tuesday, December 04, 2012, 11:05 |
Anders Mjos | | | | | | | | Vented | In preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04: |
|
|
241
|
Tuesday, December 04, 2012, 17:27 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | The RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: |
|
|
242
|
Wednesday, December 05, 2012, 11:18 |
Anders Mjos | | | | | | | In progress | Leak checking 9-pin feed through | Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background. |
|