  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator training

Thursday, September 20, 2012, 14:24: Turbos off

Thursday, September 20, 2012, 15:20: Venting

  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuating

Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01.

  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout

 Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.

Update  13:51:

Controls have reestablished contact with the PLC.

  211   Monday, September 24, 2012, 13:52 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

See e-fault 6329

Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.

  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

Anders Mjos wrote:

See e-fault 6329

Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.

 Pump replaced by vacuum group

  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator training

Did the HV conditioning up to 30kV.

Started the heaters conditioning:

for TSH:TGHT up to 580A

for TSH:TBHT up to 230A

  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training

The source was used yesterday for operator training.

Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.

  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source Off

Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.

  220   Wednesday, October 10, 2012, 10:47 Friedhelm Ames      Failedfound teststand tripped off

turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.

  221   Wednesday, October 10, 2012, 17:35 Aurelia Laxdal      Failedfound teststand tripped off

Friedhelm Ames wrote:

turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.

 Checked the Archiver and the striptool: TSG:TP1A & TP1B tripped on Oct. 10, at 7:53am. Both pumps showed timeout, but the AC breakers were not tripped. Also, checked with MCR: they were no power bumps or cooling water problems around that time. 

Discussed it with Kazuya Negishi from Controls: there were no PLC problems. Kazuya and I would monitor the trips. 

  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work

 Thursday, November 29, 2012, 14:15: Stopping turbos

Thursday, November 29, 2012, 15:57: Venting

  236   Thursday, November 29, 2012, 16:21 Anders Mjos       Pumping down

Thursday, November 29, 2012, 16:21: Roughing

  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progress

in preparation for RFQ testing. By Sebastian and Anders

An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.

Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).

Friday, November 30, 2012, 15:16: Turbos on

Friday, November 30, 2012, 15:25 : Turbos at speed

Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T

  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed through

Base leak rate 6 - 7 E-9 mbar-l/s

A leak was found around the 9-pin feed through.

  240   Tuesday, December 04, 2012, 11:05 Anders Mjos       Vented

In preparation for RFQ target and leak troubleshooting.

Tuesday, December 04, 2012, 11:04: Turbos off (vacuum at 3.8E-7 T)

Water lines purged.

Tuesday, December 04, 2012, 15:03: Venting

Tuesday, December 04, 2012, 15:32 : Vented

  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping down

The RFQ heating test target was installed by Sebastian and Anders.

Tuesday, December 04, 2012, 17:26: roughing

Tuesday, December 04, 2012, 17:45: starting turbos

Tuesday, December 04, 2012, 17:55 : turbos at speed

Tuesday, December 04, 2012, 17:55 : vacuum at 3.3E-5 T

  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed through

Vacuum at 4.4E-7T

Base leak rate 2 - 3 E-9 mbar-l/sec

No response above background.