170
|
Thursday, August 16, 2012, 10:41 |
Pierre Bricault | | | | | | | In progress | Test FEBIAD | Ray is finishing the electrical modifications
for the FEBIAD with the biased cathode.
We found the source of the sparks. |
|
|
171
|
Thursday, August 16, 2012, 15:30 |
Anders Mjos | | | | | | | Problems/Solutions | Venting to investigate short between anode - cathode | Thursday, August 16, 2012, 15:29: Turbos
off
Thursday, August 16, 2012, 15:50 |
|
|
172
|
Thursday, August 16, 2012, 16:54 |
Anders Mjos | | | | | | | Problems/Solutions | Short between gas line and heat shield | There was a short between the gas line
and the heat shield - as the gas line insulator
was not tied to the heat shield. A Ta-wire |
|
|
173
|
Thursday, August 16, 2012, 16:56 |
Anders Mjos | | | | | | | Problems/Solutions | Target heater PS disconnected from controls. | As per Ray Dube for the FEBIAD anode bias
test. The PS will need to be reconnected
before a target is run. |
|
|
174
|
Thursday, August 16, 2012, 16:56 |
Anders Mjos | | | | | | | In progress | Pumping down after troubleshooting | Thursday, August 16, 2012, 17:04 : Starting
turbos
Thursday, August 16, 2012, 17:09 |
|
|
175
|
Friday, August 17, 2012, 08:30 |
Pierre Bricault | | | | | | | In progress | FEBIAD test with cathode biased | Yesterday Ray Dube has changed the configuration
in order to run the FEBIAD with the cathode
on negative bias. |
|
|
176
|
Friday, August 17, 2012, 10:09 |
Pierre Bricault | | | | | | | In progress | FEBIAD test cathode bias | Backing pressure on the bender section
is quite large. TMSIG6 reads 5.09E-7 T and
TMS:CG2B reads 0.249 T! |
|
|
177
|
Friday, August 17, 2012, 12:53 |
Pierre Bricault | | | | | | | Done | | Test completed.
exel file on My Documents in folder
FEBIAD Test Aout2012/TestFEBIAD |
|
|
178
|
Thursday, August 23, 2012, 10:11 |
Anders Mjos | | | | | | | In progress | Venting - installation of NiO#1 | Thursday, August 23, 2012, 10:10: Vacuum
2.1E-7
Thursday, August 23, 2012, 10:10: |
|
|
179
|
Thursday, August 23, 2012, 10:40 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 | Thursday, August 23, 2012, 10:40: Replacing
TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49: |
|
|
181
|
Thursday, August 23, 2012, 11:59 |
Anders Mjos | | | | | | | Problems/Solutions | Roughing blows the fuse for both roughing pumps. | The fuse for both roughing pumps blows
when roughing the chamber. With the help
from Edi: disconnect the exhaust port on |
|
|
184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working | When turned ON it was not going higher
than 3.6A (EPICS/front panel). Kazuya checked
the connections at the back and also the |
|
|
189
|
Friday, August 31, 2012, 10:19 |
Anders Mjos | | | | | | | Problems/Solutions | Replaced TMSRP2 (again) |
|
|
|
194
|
Thursday, September 06, 2012, 09:23 |
Friedhelm Ames | NB#7 | | | | | | | | start high voltage and heaters |
|
|
196
|
Friday, September 07, 2012, 13:10 |
Friedhelm Ames | Nb#7 | | | | | | Done | mass scan finished | mass scan is finished saved as
Normal
0
|
|
|
205
|
Friday, September 14, 2012, 16:33 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57:
Starting turbos |
|
|
206
|
Thursday, September 20, 2012, 14:24 |
Anders Mjos | | | | | | | In progress | Venting - installation of FEBIAD test target for operator training | Thursday, September 20, 2012, 14:24: Turbos
off
Thursday, September 20, 2012, 15:20: |
|
|
209
|
Friday, September 21, 2012, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A/B fluctuating | Backing pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01. |
|
|
210
|
Monday, September 24, 2012, 10:31 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS whiteout | Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it. |
|
|
211
|
Monday, September 24, 2012, 13:52 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse | See e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will |
|