Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 25 of 53  Not logged in ELOG logo
Entry  Thursday, December 13, 2012, 14:38, Anders Mjos, , , , , , , , Pumping down empty chamber 
Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56 : Starting turbos
Thursday, December 13, 2012, 15:05 : turbos at speed
Entry  Friday, January 18, 2013, 15:34, Anders Mjos, empty, , , , , , , Pumping down empty chamber 
Started roughing
Friday, January 18, 2013, 15:25: Started turbos
Friday, January 18, 2013, 15:33: Turbos at speed
Entry  Thursday, March 28, 2013, 13:55, Anders Mjos, Empty, , , , , , In progress, Pumping down empty chamber 
Thursday, March 28, 2013, 13:55: Roughing
Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)
Thursday, March 28, 2013, 14:44: Both turbos at speed
Entry  Thursday, June 13, 2013, 10:19, Anders Mjos, , , , , , , Done, Pumping down empty chamber 
Thursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos started
Thursday, June 13, 2013, 11:00 : Both turbos at speed.
Entry  Friday, March 21, 2014, 13:55, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Roughing
Friday, March 21, 2014, 13:59: Starting turbos
Friday, March 21, 2014, 14:08: Turbos at speed
Entry  Friday, June 20, 2014, 11:44, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Friday, June 20, 2014, 11:44: Roughing
Friday, June 20, 2014, 13:00: Strarting turbos 
Friday, June 20, 2014, 13:09: Turbos at speed.
Entry  Tuesday, October 07, 2014, 09:32, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Tuesday, October 07, 2014, 09:30: Roughing
Tuesday, October 07, 2014, 10:24: Starting turbos
Tuesday, October 07, 2014, 10:32 : Turbos at speed. Vacuum at 3.3E-5 T
Entry  Tuesday, February 17, 2015, 14:41, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Tuesday, February 17, 2015, 14:35: Roughing. Doors were difficult to get to seal.
Tuesday, February 17, 2015, 15:11: Started turbos
Tuesday, February 17, 2015, 15:34: Turbos at speed. Vacuum at 6.7E-6 T
Entry  Monday, July 06, 2015, 14:26, Anders Mjos, , , , , , , , Pumping down empty chamber 
Monday, July 06, 2015, 14:26: Roughing

Wednesday, July 08, 2015, 09:26: Venting

Thursday, July 09, 2015, 11:42: Roughing
Entry  Thursday, August 16, 2012, 16:56, Anders Mjos, , , , , , , In progress, Pumping down after troubleshooting 
Thursday, August 16, 2012, 17:04 : Starting turbos
Thursday, August 16, 2012, 17:09 : TP1B at speed
Thursday, August 16, 2012, 17:13 : TP1A at speed (after 1 time out)
Entry  Wednesday, July 11, 2012, 11:16, Anders Mjos, , , , , , , In progress, Pumping down - with new turbo pump 
 
Entry  Wednesday, September 12, 2012, 17:04, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Pumping down - w/replaced insulators 
Replaced swollen insulator and added Ta heat shield on insulator.
 
Wednesday, September 12, 2012, 17:03: Roughing
Entry  Wednesday, July 04, 2012, 15:37, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Pumping down  photo_8.jpg
Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.
NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit.
(see attachment)
Entry  Monday, July 16, 2012, 15:46, Anders Mjos, , , , , , , In progress, Pumping down 
Monday, July 16, 2012, 15:11: Roughing.
Monday, July 16, 2012, 15:38: Turbos started.
Monday, July 16, 2012, 15:46: TSGTP1B at speed TSGTP1A timeout.
Entry  Thursday, July 19, 2012, 11:32, Anders Mjos, , , , , , , Done, Pumping down 
Thursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting turbos
Thursday, July 19, 2012, 11:54: TP1B at speed
Entry  Thursday, October 25, 2012, 13:02, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , In progress, Pumping down 
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Entry  Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down 
Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58: Started turbos
Monday, November 05, 2012, 15:06 : Turbos at speed
Entry  Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down 
Thursday, November 29, 2012, 16:21: Roughing
Entry  Tuesday, December 04, 2012, 17:27, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down 
The RFQ heating test target was installed by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: roughing
Tuesday, December 04, 2012, 17:45: starting turbos
Entry  Friday, January 04, 2013, 15:07, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down 
Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24: Starting turbos
Friday, January 04, 2013, 15:33 : Turbos at speed
ELOG V2.9.2-2455