ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  147   Monday, July 16, 2012, 15:46 Anders Mjos      In progressPumping downMonday, July 16, 2012, 15:11: Roughing.
Monday, July 16, 2012, 15:38: Turbos
started.
  
  148   Tuesday, July 17, 2012, 10:10 Anders Mjos      Problems/SolutionsGas lines leak checked - air supply leak on manifoldLeak found on the Ne supply line. 1E-4
- 1E-5 range. Replaced fittings. Had to use
one brass piece. Leak rate 6E-9 (probably
  
  149   Wednesday, July 18, 2012, 14:08 Anders Mjos      Problems/SolutionsAir supply leak on manifold fixed

    

       
            
  
  150   Thursday, July 19, 2012, 08:42 Anders Mjos      Problems/SolutionsLeak checking source chamber - leak found on front doorDue to high vacuum a leak check will be
done on the system.
Thursday, July 19, 2012, 09:00 :
  
  151   Thursday, July 19, 2012, 09:35 Anders Mjos      DoneVenting to investigate leak on front doorThursday, July 19, 2012, 09:35: Switched
off both turbos.
Thursday, July 19, 2012, 10:23: Venting
  
  152   Thursday, July 19, 2012, 11:31 Anders Mjos      Problems/SolutionsWiped o-rings and sealing faces

    

       
            
  
  153   Thursday, July 19, 2012, 11:32 Anders Mjos      DonePumping downThursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting
turbos
  
  154   Thursday, July 19, 2012, 12:59 Anders Mjos      Problems/SolutionsLeak checking doors - no responseThursday, July 19, 2012, 12:57: Doors leak
checked. No response. Base rate 1.6E-8 atm-cc/sec.
TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr.
  
  155   Thursday, August 09, 2012, 13:08 Pierre Bricault       Test FEBIADWaiting Rick for the fitting on the vacuum
pump.
  
  156   Friday, August 10, 2012, 11:29 Pierre BricaultNA   N ANAIn progressTest FEBIADThe helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out
  
  158   Friday, August 10, 2012, 13:48 Anders Mjos      Problems/SolutionsHe line leak checked - leak fixedA major leak was found on the connection
to the regulation valve on the He bottle.
Ferrule replaced. System leak checked.
  
  159   Friday, August 10, 2012, 14:08 Rick Maharaj       Gas line pumpGas line vacuum pump reinstalled after
fitting was modified to receive a standard
swagelok connector. The vacuum line was plumbed
  
  161   Friday, August 10, 2012, 15:57 Pierre Bricault        Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok
  
  163   Saturday, August 11, 2012, 16:18 Pierre Bricault       Test FEBIAD anode biased at 120 VThe ramp up finished.
I have 3.35E-6 Amp out of the source
on FC0.
  
  164   Sunday, August 12, 2012, 21:50 Pierre Bricault      In progressTest FEBIADLost communication with EPICS. Came in
reset the ...
So far no luck.
  
  165   Sunday, August 12, 2012, 22:07 Pierre Bricault      In progressFBIAD testThe reset restored the control.
But magnet supply does not put any
amperage out.
  
  166   Monday, August 13, 2012, 08:39 Anders Mjos      Problems/SolutionsStarted ArchiversArchivers not running this morning. Started
both ISACT and SOURCES
  
  167   Monday, August 13, 2012, 10:59 Pierre Bricault      Problems/SolutionsTest FEBIADThis morning I try to contact PS group
no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel
  
  168   Monday, August 13, 2012, 14:26 Pierre Bricault      In progressFEBIAD testI am done with the FEBIAD test (anode biased)
We will swap the bias now to the
cathode and change the polarity to negative.
  
  169   Monday, August 13, 2012, 14:56 Pierre Bricault      In progressFEBIAD testOne thing that seems to be strange regarding
this FEBIAD is the best results are without
any current in the coil.
  