Monday, July 16, 2012, 15:46, Anders Mjos, , , , , , , In progress, Pumping down
|
Monday, July 16, 2012, 15:11: Roughing.
Monday, July 16, 2012, 15:38: Turbos started.
Monday, July 16, 2012, 15:46: TSGTP1B at speed TSGTP1A timeout. |
Tuesday, July 17, 2012, 10:10, Anders Mjos, , , , , , , Problems/Solutions, Gas lines leak checked - air supply leak on manifold
|
Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No
response to He.
Leak rate around low E-8 with regulation valve open. |
Wednesday, July 18, 2012, 14:08, Anders Mjos, , , , , , , Problems/Solutions, Air supply leak on manifold fixed
|
Anders Mjos wrote:
Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. |
Thursday, July 19, 2012, 08:42, Anders Mjos, , , , , , , Problems/Solutions, Leak checking source chamber - leak found on front door
|
Due to high vacuum a leak check will be done on the system.
Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec
Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range. |
Thursday, July 19, 2012, 09:35, Anders Mjos, , , , , , , Done, Venting to investigate leak on front door
|
Thursday, July 19, 2012, 09:35: Switched off both turbos.
Thursday, July 19, 2012, 10:23: Venting
|
Thursday, July 19, 2012, 11:31, Anders Mjos, , , , , , , Problems/Solutions, Wiped o-rings and sealing faces
|
Anders Mjos wrote:
Due to high vacuum a leak check will be done on the system. |
Thursday, July 19, 2012, 11:32, Anders Mjos, , , , , , , Done, Pumping down
|
Thursday, July 19, 2012, 11:29: roughing
Thursday, July 19, 2012, 11:49: starting turbos
Thursday, July 19, 2012, 11:54: TP1B at speed |
Thursday, July 19, 2012, 12:59, Anders Mjos, , , , , , , Problems/Solutions, Leak checking doors - no response
|
Thursday, July 19, 2012, 12:57: Doors leak checked. No response. Base rate 1.6E-8 atm-cc/sec. TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. TSG:CG1A
0.014 Torr. |
Thursday, August 09, 2012, 13:08, Pierre Bricault, , , , , , , , Test FEBIAD
|
Waiting Rick for the fitting on the vacuum pump. |
Friday, August 10, 2012, 11:29, Pierre Bricault, NA, , , , N A, NA, In progress, Test FEBIAD
|
The helium bottle was found empty.
Rick will refill it and hook the leak detector on the system to find out
if we have a leak on the line. |
Friday, August 10, 2012, 13:48, Anders Mjos, , , , , , , Problems/Solutions, He line leak checked - leak fixed
|
A major leak was found on the connection to the regulation valve on the He bottle. Ferrule replaced. System leak checked.
After He bottle: base 5E-6, no response to He spray
AfterSV1: base 5E-7, no response |
Friday, August 10, 2012, 14:08, Rick Maharaj, , , , , , , , Gas line pump
|
Gas line vacuum pump reinstalled after fitting was modified to receive a standard swagelok connector. The vacuum line was plumbed using 1/4" copper
tube (not Stainless) for the the ability to flex and manipulate the line for pump removal and and insertion. |
Friday, August 10, 2012, 15:57, Pierre Bricault, , , , , , , ,
|
Test high voltage to 30 kV ok
Test gas valve open at 6.1 V
Test Ne leak ok |
Saturday, August 11, 2012, 16:18, Pierre Bricault, , , , , , , , Test FEBIAD anode biased at 120 V
|
The ramp up finished.
I have 3.35E-6 Amp out of the source on FC0.
Vacuum 4.3 E-7 T increase Coil current to 40 A. No effect on vac. |
Sunday, August 12, 2012, 21:50, Pierre Bricault, , , , , , , In progress, Test FEBIAD
|
Lost communication with EPICS. Came in reset the ...
So far no luck.
|
Sunday, August 12, 2012, 22:07, Pierre Bricault, , , , , , , In progress, FBIAD test
|
The reset restored the control.
But magnet supply does not put any amperage out.
Try turning it off and on. No chance. |
Monday, August 13, 2012, 08:39, Anders Mjos, , , , , , , Problems/Solutions, Started Archivers
|
Archivers not running this morning. Started both ISACT and SOURCES |
Monday, August 13, 2012, 10:59, Pierre Bricault, , , , , , , Problems/Solutions, Test FEBIAD
|
This morning I try to contact PS group no one answer. Dan Louie is in vacation.
I went into the can diagnostics panel and reconfigure MB1 power supply.
This worked. |
Monday, August 13, 2012, 14:26, Pierre Bricault, , , , , , , In progress, FEBIAD test
|
I am done with the FEBIAD test (anode biased)
We will swap the bias now to the cathode and change the polarity to negative. |
Monday, August 13, 2012, 14:56, Pierre Bricault, , , , , , , In progress, FEBIAD test
|
One thing that seems to be strange regarding this FEBIAD is the best results are without any current in the coil.
Normally for the neon ionization the on-line source wanted to be at around 50 to 80 Amp. Not this one.
Is there anything special about this coil? |
|