  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuatingBacking pressures TSG:CG1A/B are fluctuating
between 0.02 and 0.05 since Sept 17th at
~17h. Expected values <0.01.
  
  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout Test stand was off this morning and
EPICS controls in "white-out".
Controls is looking into it.
  
  211   Monday, September 24, 2012, 13:52 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuseSee e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will
  
  212   Monday, September 24, 2012, 15:25 Anders Mjos      DoneTMS RP and TP started    
  213   Tuesday, September 25, 2012, 13:05 Anders Mjos      Problems/SolutionsTSG:RP1 will not start without blowing the fuse

    

       
            
  
  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump    
  215   Tuesday, September 25, 2012, 16:10 Aurelia Laxdal       Conditioning - SiC-HP-FEBIAD for operator trainingDid the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
  
  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator trainingThe source was used yesterday for operator
training.
Today, I found the source off: the
  
  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source OffChecked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week.
  
  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON Turned the source back ON. Heaters are
ramping up.
  
  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updatesOn Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday
  
  220   Wednesday, October 10, 2012, 10:47 Friedhelm Ames      Failedfound teststand tripped offturbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown.
  
  221   Wednesday, October 10, 2012, 17:35 Aurelia Laxdal      Failedfound teststand tripped off

    

       
            
  
  222   Thursday, October 25, 2012, 11:13 Anders MjosTestHP-FEBIAD    In progressVenting chamber for installation of TiC#3Thursday, October 25, 2012, 11:11: Vacuum
at 1.3E-7 T
Thursday, October 25, 2012, 11:12:
  
  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping downThursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19
: Turbos on
  
  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

    

       
            
  
  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS StartupDid the HV conditioning for the TiC#3 up
to 30kV.
Heaters ramp up in progress.
  
  226   Thursday, November 01, 2012, 14:57 Aurelia LaxdalTiC#3LP-SISITWTM1   TSH:TGHT readback stopped at 264.5A (for a higher setpoint)The TSH:TGHT stopped at 263.7A, but the
setpoint is still ramping (now  at 421A).
The voltage is set correctly: have 6.238V
  
  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Normal
0




false
false
false
  
  228   Friday, November 02, 2012, 15:40 Aurelia Laxdal LP-SISITWTM1  DoneSiC#3 cooldown startedStarted the cooldown for SiC#3.   