Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down
|
Thursday, November 29, 2012, 16:21: Roughing |
Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting
|
|
Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress
|
in preparation for RFQ testing. By Sebastian and Anders
An insulated 9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.
Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).
Friday, November 30, 2012, 15:16: Turbos on
Friday, November 30, 2012, 15:25 : Turbos at speed
Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T |
Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through
|
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through. |
Tuesday, December 04, 2012, 11:05, Anders Mjos, , , , , , , , Vented
|
In preparation for RFQ target and leak troubleshooting.
Tuesday, December 04, 2012, 11:04: Turbos off (vacuum at 3.8E-7 T)
Water lines purged.
Tuesday, December 04, 2012, 15:03: Venting
Tuesday, December 04, 2012, 15:32 : Vented |
Tuesday, December 04, 2012, 17:27, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down
|
The RFQ heating test target was installed by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: roughing
Tuesday, December 04, 2012, 17:45: starting turbos
Tuesday, December 04, 2012, 17:55 : turbos at speed
Tuesday, December 04, 2012, 17:55 : vacuum at 3.3E-5 T |
Wednesday, December 05, 2012, 11:18, Anders Mjos, , , , , , , In progress, Leak checking 9-pin feed through
|
Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background. |
Thursday, December 06, 2012, 08:41, Anders Mjos, , , , , , , , Opened cooling water
|
Vacuum stable at 2.8E-7 T |
Thursday, December 13, 2012, 08:40, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Thursday, December 13, 2012, 08:38: TBHT and TGHT off
Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T
Thursday, December 13, 2012, 08:38 : Turbos off
Thursday, December 13, 2012, 11:19: Venting
Thursday, December 13, 2012, 11:30: Water lines purged
Thursday, December 13, 2012, 11:41: Target removed for inspection. |
Thursday, December 13, 2012, 14:38, Anders Mjos, , , , , , , , Pumping down empty chamber
|
Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56 : Starting turbos
Thursday, December 13, 2012, 15:05 : turbos at speed
Thursday, December 13, 2012, 15:06 : vacuum at 2.3E-5 T
|
Friday, December 14, 2012, 15:28, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Sebastian Raeder wrote: |
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target
|
Friday, December 14, 2012, 15:27 : Venting |
Wednesday, December 19, 2012, 11:24, Anders Mjos, , , , , , , Problems/Solutions, Restarted turbos in TMS section after power bump
|
Sources arch restared |
Thursday, December 20, 2012, 14:19, Anders Mjos, , , , , , , , Power down for holidays
|
|
Thursday, January 03, 2013, 08:33, Anders Mjos, , , , , , , Problems/Solutions, Started archivers after holiday shut down
|
Started archivers. Controls whited out. |
Thursday, January 03, 2013, 11:39, Anders Mjos, , , , , , , Problems/Solutions, Starting pumps after holiday shut down - TMSRP2 replaced
|
Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.
Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516
Thursday, January 03, 2013, 11:29: TSGRP1 Started
Thursday, January 03, 2013, 11:29: TSGTP1A and 1B started
Thursday, January 03, 2013, 11:38 : TSGTP1A and B at speed
Thursday, January 03, 2013, 11:38 : Vacuum at 1.3E-5 T
TMSRP2 replaced
Thursday, January 03, 2013, 15:03: TMSTP2 and 6 started
Thursday, January 03, 2013, 15:07: TMSTP2 and 6 at speed
Thursday, January 03, 2013, 15:08: Vacuum at 5 E-5 T |
Friday, January 04, 2013, 10:52, Anders Mjos, , , , , , , In progress, Preparing for venting
|
Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: Turbos stopped
Friday, January 04, 2013, 13:50: Venting |
Friday, January 04, 2013, 15:07, Anders Mjos, RFQ empty, , , , , , In progress, Pumping down
|
Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24: Starting turbos
Friday, January 04, 2013, 15:33 : Turbos at speed
Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T |
Wednesday, January 09, 2013, 10:39, Anders Mjos, RFQ empty, , , , , , In progress, Venting
|
Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 : Venting with nitgogen
Wednesday, January 09, 2013, 14:12: Target removed |
Wednesday, January 09, 2013, 14:13, Anders Mjos, Empty, , , , , , , Rouging
|
Wednesday, January 09, 2013, 14:12: Roughing empty chamber |
Friday, January 11, 2013, 08:37, Anders Mjos, Empty, , , , , , In progress, Venting
|
Friday, January 11, 2013, 08:36: Venting for installation of RFQ test target later today |
|