    Reply  Friday, August 31, 2012, 10:19, Anders Mjos, , , , , , , Problems/Solutions, Replaced TMSRP2 (again) 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.
Entry  Friday, August 31, 2012, 11:12, Aurelia Laxdal, , HP-FEBIAD, ITE, TM4, , , Done, Finished testing NiO#1 
Turned off the HV and the optics in the first section. Couldn't turn off the optics in the second section: left a message for Evgeniy.
Also TMS:RP2 is very noisy. Talked to Edi D. from vacuum group. He would work on it this afternoon. E-Fault#6282
Entry  Friday, August 31, 2012, 11:39, Anders Mjos, NiO#1, HP-FEBIAD, ITE, TM4, , , Done, Venting vacuum chamber - source change 
Friday, August 31, 2012, 11:39: Stopped turbos.
Friday, August 31, 2012, 13:06: Venting.
Friday, August 31, 2012, 13:23: Water lines purged.
Entry  Friday, August 31, 2012, 13:59, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Nb#7 installed 
Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 : starting turbos
Friday, August 31, 2012, 15:44 : TP1B at speed
    Reply  Tuesday, September 04, 2012, 08:11, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Nb#7 installed 


    
        
            Anders Mjos wrote:
        
        
            
            Friday, August 31, 2012, 15:19: roughing
Entry  Thursday, September 06, 2012, 09:23, Friedhelm Ames, NB#7, , , , , , ,  
start high voltage and heaters
Entry  Friday, September 07, 2012, 12:11, Friedhelm Ames, NB#7, LP-SIS, , , , , In progress, mass scan started 
mass scan has been started after optimization on 23Na
Entry  Friday, September 07, 2012, 13:10, Friedhelm Ames, Nb#7, , , , , , Done, mass scan finished 
mass scan is finished saved as 
 
  Normal
  0
  
  

 
  
  false
  false

 false
  
  EN-US
  X-NONE
Entry  Friday, September 07, 2012, 14:34, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Problems/Solutions, Insulator ITD0342 overheated - swelling Nb#7_swelling_insulator.pdf
 See attached photo
Entry  Tuesday, September 11, 2012, 13:13, Friedhelm Ames, Nb#7, LP-SIS, , , , , In progress, start cool down 
start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.
Entry  Tuesday, September 11, 2012, 19:48, Friedhelm Ames, NB#7, HP-SIS, , , , , Done, cool down finished, all source power supplies off. 
 
Entry  Wednesday, September 12, 2012, 08:02, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Venting 
Wednesday, September 12, 2012, 08:01: Turbos off
Wednesday, September 12, 2012, 13:35: Venting, water off and purged.
Wednesday, September 12, 2012, 13:55: Vented
Entry  Wednesday, September 12, 2012, 17:04, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Pumping down - w/replaced insulators 
Replaced swollen insulator and added Ta heat shield on insulator.
 
Wednesday, September 12, 2012, 17:03: Roughing
Entry  Thursday, September 13, 2012, 08:24, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , In progress, Water on 
Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response
on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations.
Entry  Thursday, September 13, 2012, 13:05, Friedhelm Ames, Nb#7, LP-SIS, , , , , , heater ramping up started 
 
Entry  Friday, September 14, 2012, 15:27, Anders Mjos, Nb#7, LP-SIS, ITW, TM1, , , Done, Venting 
Target cooled down. Power supplies off.
Friday, September 14, 2012, 15:27: Turbos off.
Friday, September 14, 2012, 15:32: Water purged.
Entry  Friday, September 14, 2012, 16:33, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57: Starting turbos
Friday, September 14, 2012, 17:05 : Turbos at speed
Entry  Thursday, September 20, 2012, 14:24, Anders Mjos, , , , , , , In progress, Venting - installation of FEBIAD test target for operator training 
Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting
Entry  Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training 
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
    Reply  Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, September 20, 2012, 15:50: Roughing