Friday, September 14, 2012, 16:33, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57: Starting turbos
Friday, September 14, 2012, 17:05 : Turbos at speed
Friday, September 14, 2012, 17:07: Vacuum at 8.7E-6
|
Thursday, September 20, 2012, 14:24, Anders Mjos, , , , , , , In progress, Venting - installation of FEBIAD test target for operator training
|
Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting |
Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Anders Mjos wrote: |
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr. |
Friday, September 21, 2012, 08:27, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A/B fluctuating
|
Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01. |
Monday, September 24, 2012, 10:31, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout
|
Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.
Update 13:51:
Controls have reestablished contact with the PLC. |
Monday, September 24, 2012, 13:52, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse
|
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow. |
Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started
|
|
Tuesday, September 25, 2012, 13:05, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse
|
Anders Mjos wrote: |
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.
|
Pump replaced by vacuum group |
Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump
|
|
Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3
|
Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T
Thursday, October 25, 2012, 11:12: Turbos off
Thursday, October 25, 2012, 11:50: Venting |
Thursday, October 25, 2012, 13:02, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , In progress, Pumping down
|
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T |
Friday, October 26, 2012, 08:29, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target ready for conditioning
|
Anders Mjos wrote: |
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T
|
Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T |
Monday, November 05, 2012, 14:41, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target Removed
|
Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.
The torque required to loosen the bolts were measured (from left to right):
Target legs: 48 and 30 in lbs
Tube htr: 25, 30 and 25 in lbs |
Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down
|
Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58: Started turbos
Monday, November 05, 2012, 15:06 : Turbos at speed
Monday, November 05, 2012, 15:068: Vacuum at 2.2E-5 T
Wednesday, November 07, 2012, 08:26: Cooling water open. Vacuum stable at 1.8E-7 T |
Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work
|
Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting |
Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down
|
Thursday, November 29, 2012, 16:21: Roughing |
Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting
|
|
Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress
|
in preparation for RFQ testing. By Sebastian and Anders
An insulated 9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.
Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).
Friday, November 30, 2012, 15:16: Turbos on
Friday, November 30, 2012, 15:25 : Turbos at speed
Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T |
Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through
|
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through. |
|