Entry  Friday, September 14, 2012, 16:33, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Friday, September 14, 2012, 16:33: Roughing
Friday, September 14, 2012, 16:57: Starting turbos
Friday, September 14, 2012, 17:05 : Turbos at speed
Entry  Thursday, September 20, 2012, 14:24, Anders Mjos, , , , , , , In progress, Venting - installation of FEBIAD test target for operator training 
Thursday, September 20, 2012, 14:24: Turbos off
Thursday, September 20, 2012, 15:20: Venting
Entry  Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training 
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
    Reply  Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, September 20, 2012, 15:50: Roughing
Entry  Friday, September 21, 2012, 08:27, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A/B fluctuating 
Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01.
Entry  Monday, September 24, 2012, 10:31, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout 
 Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.
Update  13:51:
Controls have reestablished contact with the PLC.
Entry  Monday, September 24, 2012, 13:52, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.
Entry  Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started 
 
    Reply  Tuesday, September 25, 2012, 13:05, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 


    
        
            Anders Mjos wrote:
        
        
            
            See e-fault 6329
Entry  Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump 
 
Entry  Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3 
Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T
Thursday, October 25, 2012, 11:12: Turbos off
Thursday, October 25, 2012, 11:50: Venting
Entry  Thursday, October 25, 2012, 13:02, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , In progress, Pumping down 
Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19 : Turbos on
Thursday, October 25, 2012, 13:28 : Turbos at speed
    Reply  Friday, October 26, 2012, 08:29, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target ready for conditioning 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, October 25, 2012, 13:00: Roughing
Entry  Monday, November 05, 2012, 14:41, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target Removed 
Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.
The torque required to loosen the bolts were measured (from left to right):
Target legs: 48 and 30 in lbs
Entry  Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down 
Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58: Started turbos
Monday, November 05, 2012, 15:06 : Turbos at speed
Entry  Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work 
 Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting
Entry  Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down 
Thursday, November 29, 2012, 16:21: Roughing
Entry  Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting 
 
Entry  Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress 
in preparation for RFQ testing. By Sebastian and Anders
An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target
assembly was placed in the upper slot on the source tray.
Entry  Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through 
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through.