  1036   Thursday, December 05, 2024, 11:08 Aaron Schmidt      Problems/SolutionsSwap RP1 & Inspection (ITS Pumps) Thursday, December 05, 2024, 11:04:
RP1 was struggling to pump down. RP SN: MY20055A02
removed. Tip seal replacement likely req'd.
 Media.jpgMedia_(2).jpgMedia_(1).jpgMedia_(3).jpgMedia_(4).jpg 
  358   Thursday, January 30, 2014, 15:38 Anders Mjos      Problems/SolutionsStarting turbos after CuLCW shut off

    

       
            
  
  620   Tuesday, January 02, 2018, 09:18 Anders Mjos      Problems/SolutionsStarting systemTuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
  
  259   Thursday, January 03, 2013, 11:39 Anders Mjos      Problems/SolutionsStarting pumps after holiday shut down - TMSRP2 replacedThursday,
January 03, 2013, 11:28: TMSRP2 is noisy.
Stopped.
  
  214   Tuesday, September 25, 2012, 13:25 Anders Mjos      DoneStarted turbos after replaced roughing pump    
  34   Friday, February 17, 2012, 10:27 Aurelia Laxdal      DoneStarted the ArchiversStarted both ISACT and SOURCES Archivers.   
  7   Monday, September 19, 2011, 09:11 Aurelia LaxdalTaC#1LP-SISITETM138634-636833-6In progressStarted target and tube heaters. Heaters conditioning went fine: 580A and
230A.
Did a mass scan:
  
  258   Thursday, January 03, 2013, 08:33 Anders Mjos      Problems/SolutionsStarted archivers after holiday shut downStarted archivers. Controls whited out.   
  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiverThe archiver was not running   
  166   Monday, August 13, 2012, 08:39 Anders Mjos      Problems/SolutionsStarted ArchiversArchivers not running this morning. Started
both ISACT and SOURCES
  
  269   Tuesday, January 15, 2013, 15:12 Sebastian RaederRFQ empty      Start coolingStart cooling of Target RFQ empty   
  974   Thursday, July 13, 2023, 18:29 Aurelia Laxdal LP-SIS    In progressSpectrometer tests Pumping down: TS loaded with a LP-SIS
container for spectrometer test. 
Started heating up the target container:
  
  585   Wednesday, May 17, 2017, 10:17 Anders Mjos HP-FEBIAD-CTL    Problems/SolutionsSparking between new coil line and ground electrodeWednesday, May 17, 2017, 10:17: Sparking
around 20 kV. Will need to vent to increase
gap between water lines.
  
  732   Thursday, June 13, 2019, 14:05 Aaron Schmidt      DoneSpare TGHT PS installed.Thursday, June 13, 2019, 14:04: Spare TGHT
PS installed /  tested. The old one
is to be sent out for repair.
  
  347   Monday, December 02, 2013, 08:36 Anders Mjos      Problems/SolutionsSources archiver started    
  948   Monday, December 05, 2022, 15:41 Aaron Schmidt       Source tray insulator replacement Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced. 
Torqued @ 75 in-lbs. (Reference image
 7x 
  668   Tuesday, June 12, 2018, 11:38 Aaron Schmidt      In progressSource Tray re-installationRe-installation of the ISAC Test Stand
Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect
 TS_Source_Tray_re-installed_2018_-_(Leak_found).docx 
  436   Wednesday, April 22, 2015, 13:17 Anders Mjos       Source Tray Removed by Mico, Dan and Anders   
  987   Tuesday, December 12, 2023, 12:41 Aaron Schmidt      DoneSource Tray / TS inspectionTuesday, December 12, 2023, 12:39: Visual
inspection.
Source tray: OK. Minor cracks on
  
  98   Thursday, May 17, 2012, 13:24 John WongSiC#27HP-SISITETM438817-3 Problems/SolutionsSolid residues found on EE Thursday, May 17, 2012, 13:15
After the test-stand, the EE was
removed for inspection.  It was discovered
 SiC#27_after_teststand.pdfSiC#27_clean_EE.pdf 