  Test-Stand, Page 20 of 53  Not logged in ELOG logo
Entry  Tuesday, August 03, 2021, 11:55, Fernando Maldonado, , , , , , , Problems/Solutions, Swapped emmittance meter voltage cables. 
After not being able to get beam through the emittance meter. I diagnosed that the plates was not biased (reason yet unknow).
I swapped the cables from the plates such that it looks like the picture below. With this, I was able to take an emittance scan with the previous
parameters.
Entry  Thursday, December 05, 2024, 11:08, Aaron Schmidt, , , , , , , Problems/Solutions, Swap RP1 & Inspection (ITS Pumps) Media.jpgMedia_(2).jpgMedia_(1).jpgMedia_(3).jpgMedia_(4).jpg
 Thursday, December 05, 2024, 11:04: RP1 was struggling to pump down. RP SN: MY20055A02 removed. Tip seal replacement likely req'd.
Swapped with a new roughing pump SN: MY2340SA06 (Voltage set to 115V. Shipping locks loosened prior to install)
Ballast filter installed.
    Reply  Thursday, January 30, 2014, 15:38, Anders Mjos, , , , , , , Problems/Solutions, Starting turbos after CuLCW shut off 


    
        
            Anders Mjos wrote:
        
        
            
            CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are
Entry  Tuesday, January 02, 2018, 09:18, Anders Mjos, , , , , , , Problems/Solutions, Starting system 
Tuesday, January 02, 2018
Cycled power for TCSIOC and PLCIOC
TP2 and TP6 started
Entry  Thursday, January 03, 2013, 11:39, Anders Mjos, , , , , , , Problems/Solutions, Starting pumps after holiday shut down - TMSRP2 replaced 
Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.
Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516
Thursday, January 03, 2013, 11:29: TSGRP1 Started
Entry  Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump 
 
Entry  Friday, February 17, 2012, 10:27, Aurelia Laxdal, , , , , , , Done, Started the Archivers 
Started both ISACT and SOURCES Archivers.
Entry  Monday, September 19, 2011, 09:11, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, In progress, Started target and tube heaters.  
Heaters conditioning went fine: 580A and 230A.
Did a mass scan:
Plotdump-local-clean.txt Sept19 11 12-45-22.txt
Entry  Thursday, January 03, 2013, 08:33, Anders Mjos, , , , , , , Problems/Solutions, Started archivers after holiday shut down 
Started archivers. Controls whited out.
Entry  Wednesday, April 23, 2014, 09:37, Anders Mjos, , , , , , , Problems/Solutions, Started Sources archiver 
The archiver was not running
Entry  Monday, August 13, 2012, 08:39, Anders Mjos, , , , , , , Problems/Solutions, Started Archivers 
Archivers not running this morning. Started both ISACT and SOURCES
Entry  Tuesday, January 15, 2013, 15:12, Sebastian Raeder, RFQ empty, , , , , , , Start cooling 
Start cooling of Target RFQ empty
Entry  Thursday, July 13, 2023, 18:29, Aurelia Laxdal, , LP-SIS, , , , , In progress, Spectrometer tests 
 Pumping down: TS loaded with a LP-SIS container for spectrometer test. 
Started heating up the target container: up to 300A.
Last week: the LP container was heated up to TGHT 580A and TBHT 230A, and cooled down before the weekend. 
Entry  Wednesday, May 17, 2017, 10:17, Anders Mjos, , HP-FEBIAD-CTL, , , , , Problems/Solutions, Sparking between new coil line and ground electrode 
Wednesday, May 17, 2017, 10:17: Sparking around 20 kV. Will need to vent to increase gap between water lines.
Turbos stopped.
Wednesday, May 17, 2017, 10:50: Reset IV4.
Entry  Thursday, June 13, 2019, 14:05, Aaron Schmidt, , , , , , , Done, Spare TGHT PS installed. 
Thursday, June 13, 2019, 14:04: Spare TGHT PS installed /  tested. The old one is to be sent out for repair.
 
Entry  Monday, December 02, 2013, 08:36, Anders Mjos, , , , , , , Problems/Solutions, Sources archiver started 
 
Entry  Monday, December 05, 2022, 15:41, Aaron Schmidt, , , , , , , , Source tray insulator replacement 7x
 Monday, December 05, 2022, 15:38: Source Tray TGHT & TBHT insulators replaced. 
Torqued @ 75 in-lbs. (Reference image attached)
 
Entry  Tuesday, June 12, 2018, 11:38, Aaron Schmidt, , , , , , , In progress, Source Tray re-installation TS_Source_Tray_re-installed_2018_-_(Leak_found).docx
Re-installation of the ISAC Test Stand Source tray. The TM2 ST was removed.
Tuesday, June 12, 2018, 10:15: Disconnect Optics Tray. Set blocks.
-Continue with removal of TM2 Tray
Entry  Wednesday, April 22, 2015, 13:17, Anders Mjos, , , , , , , , Source Tray Removed 
 by Mico, Dan and Anders
Entry  Tuesday, December 12, 2023, 12:41, Aaron Schmidt, , , , , , , Done, Source Tray / TS inspection 
Tuesday, December 12, 2023, 12:39: Visual inspection.
Source tray: OK. Minor cracks on insulator near the coil conductor. Small chip in the upper TBHT insulator as well.
Water blocks: No leaks.