10
|
Friday, September 23, 2011, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray | Friday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD |
|
12
|
Monday, September 26, 2011, 14:56 |
John Wong | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray |
|
|
13
|
Monday, September 26, 2011, 16:14 |
Anders Mjos | | | | | | | Problems/Solutions | Fixed leak on water line for HS, added Kapton insulation |
While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see |
|
23
|
Thursday, October 13, 2011, 15:42 |
Anders Mjos | Training | HP-FEBIAD | | | | | Problems/Solutions | Target ready to be heated |
|
|
24
|
Monday, October 17, 2011, 10:22 |
Anders Mjos | FEBIAD | | | | | | Problems/Solutions | Variable leak valve replaced | Variable leak valve with serial number
F3-592 has been replaced by F3-649 due
to regulating problems described previously |
|
25
|
Monday, November 14, 2011, 15:40 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
|
|
28
|
Tuesday, December 20, 2011, 16:09 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
|
|
33
|
Thursday, February 16, 2012, 15:59 |
Anders Mjos | | | | | | | Problems/Solutions | He and Ne installed and gas lines leak checked | New supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed. |
|
49
|
Friday, March 02, 2012, 08:53 |
Anders Mjos | FEBIAD test | | | | | | Problems/Solutions | Tube heater insulator glowing | The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage. |
|
64
|
Thursday, March 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Problems/Solutions | TPS:Q2 amd TMS:MB1 failed | TPS:Q2 and TMS:MB1 failed during the scan.
-> restarted. |
|
74
|
Wednesday, April 18, 2012, 12:19 |
Anders Mjos | | | | | | | Problems/Solutions | Noise from roughing pump TSGRP1 | Wednesday, April 18, 2012, 12:15: Blanked
off cooling lines. Chamber ready to be pumped
down. |
|
75
|
Wednesday, April 18, 2012, 13:09 |
Anders Mjos | | | | | | | Problems/Solutions | Noise from roughing pump TSGRP1 |
|
|
77
|
Friday, April 20, 2012, 08:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | Problems/Solutions | Insulator stand-off failure | When the target was removed from
the test stand it was discovered that the
custom designed insulator stand-off (ITD0400 |
|
79
|
Wednesday, May 09, 2012, 08:56 |
Anders Mjos | | | | | | | Problems/Solutions | TSGIG1 not working | TSGIG1 has timed out. As seen on
the attached screen shot, the IG has been
out since 17h May 1st. |
|
80
|
Wednesday, May 09, 2012, 09:16 |
Anders Mjos | | | | | | | Problems/Solutions | TSGIG1 not working |
|
|
81
|
Thursday, May 10, 2012, 08:13 |
Anders Mjos | | | | | | | Problems/Solutions | Venting for TSGIG1 repair |
|
|
82
|
Thursday, May 10, 2012, 09:48 |
Anders Mjos | | | | | | | Problems/Solutions | Ion Gauge filament replaced |
|
|
93
|
Wednesday, May 16, 2012, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Loose chip of insulator material detected | A chip of insulator material was
detected below the lower target insulator
stand-off (attachment - left picture). The |
|
95
|
Wednesday, May 16, 2012, 19:55 |
Friedhelm Ames | | | | | | | Problems/Solutions | Hall probe reading wrong | During the mass scan today it was discovered,
that the mass calibration was off. Further
investigation showed, that the Hall probe |
|
97
|
Thursday, May 17, 2012, 12:19 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Problems/Solutions | Loose chip of insulator material detected |
|
|