Entry  Wednesday, July 04, 2012, 15:37, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Pumping down  photo_8.jpg

Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.

NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)

Wednesday, July 04, 2012, 15:33: Started roughing.

Wednesday, July 04, 2012, 15:57 : Started turbos

Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5

    Reply  Thursday, July 05, 2012, 08:41, Anders Mjos, FEBIAD anode end cap test, , , , , , In progress, Water opened - reduced flow heat shield 

Anders Mjos wrote:

Replaced grid containing ring (target side) with new ring. No contact between target and anode measured in lab.

NOTE: While closing up the VCR fittings the tube rotated causing the tube to flatten in a bend. This may reduce water flow on the heat shield circuit. (see attachment)

Wednesday, July 04, 2012, 15:33: Started roughing.

Wednesday, July 04, 2012, 15:57 : Started turbos

Wednesday, July 04, 2012, 16:03: Turbos at speed. Vacuum at 3E-5

 Thursday, July 05, 2012, 08:39: Water supply open. Vacuum stable at 5.9E-7. Due to the kink in the heat shield cooling line, flow in the heat shield line is lower than other lines (visually inspecting speed of paddle wheels).

Entry  Monday, July 09, 2012, 12:57, Anders Mjos, , , , , , , Done, Vented 
 
Entry  Tuesday, July 10, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Turbo replaced - cleaning chamber recommended 

A new turbo has been installed. Eddie said the other one had crashed but not catastrophically. He recommends the test stand be wiped clean before pumping because there is a fine layer of Aluminum dust on the chamber base.

 

Entry  Wednesday, July 11, 2012, 11:16, Anders Mjos, , , , , , , In progress, Pumping down - with new turbo pump 
 
Entry  Wednesday, July 11, 2012, 15:30, Anders Mjos, , , , , , , Problems/Solutions, Restarting turbos after power bump 

Wednesday, July 11, 2012, 15:27: Started TSGTP1A and 1B

Wednesday, July 11, 2012, 15:31: Started TSMTP2 and 6

Wednesday, July 11, 2012, 15:33: TMS tubos at speed. Vacuum 4.8E-7

Wednesday, July 11, 2012, 15:34: TSG turbos at speed. Vacuum 9.5E-6

Entry  Thursday, July 12, 2012, 09:05, Anders Mjos, , , , , , , Problems/Solutions, Shut down TSGTP1A - bearing noise 

Shut down TSGTP1A due to noise (possibly from bearings) after consulting Edi.

Entry  Thursday, July 12, 2012, 09:44, Anders Mjos, , , , , , , In progress, Venting 

System will be vented and gas lines purged with air, then nitrogen.

Thursday, July 12, 2012, 09:43: Shut down TSGTP1B.

Entry  Thursday, July 12, 2012, 12:23, Anders Mjos, , , , , , , Done, TSH:SV5 bypass on 

Thursday, July 12, 2012, 15:48: bypass removed

Entry  Thursday, July 12, 2012, 13:41, Anders Mjos, , , , , , , Done, purging gas lines with air 
  • gas lines purged with air for 60 min (through TSHUHV1 and TSHSV4).
  • gas line allowed to fill with nitrogen to 300 torr and evacuated. repeated 3 times.
Entry  Thursday, July 12, 2012, 13:49, Anders Mjos, , , , , , , Problems/Solutions, Aluminum oxide found inside TSHSV1 

Aluminum oxide found inside TSHSV1 and the copper line to TSHUHV1.

SV1 replaced and copper line cleaned.

Entry  Thursday, July 12, 2012, 15:49, Anders Mjos, , , , , , , , test stand vented for TP1A replacement 

see e-fault 6142

Entry  Monday, July 16, 2012, 15:46, Anders Mjos, , , , , , , In progress, Pumping down 

Monday, July 16, 2012, 15:11: Roughing.

Monday, July 16, 2012, 15:38: Turbos started.

Monday, July 16, 2012, 15:46: TSGTP1B at speed TSGTP1A timeout.

Monday, July 16, 2012, 15:54: Both turbos at speed. Vacuum 3.6E-5.

 

Entry  Tuesday, July 17, 2012, 10:10, Anders Mjos, , , , , , , Problems/Solutions, Gas lines leak checked - air supply leak on manifold 

Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No response to He.

Leak rate around low E-8 with regulation valve open.

When closing the HV rack, an air supply leak developed on the manifold for the valves. Shut off air supply. Valves still operational, but requires opening up air supply to actuate.

 

    Reply  Wednesday, July 18, 2012, 14:08, Anders Mjos, , , , , , , Problems/Solutions, Air supply leak on manifold fixed 

Anders Mjos wrote:

Leak found on the Ne supply line. 1E-4 - 1E-5 range. Replaced fittings. Had to use one brass piece. Leak rate 6E-9 (probably due to Ne response). No response to He.

Leak rate around low E-8 with regulation valve open.

When closing the HV rack, an air supply leak developed on the manifold for the valves. Shut off air supply. Valves still operational, but requires opening up air supply to actuate.

 

 With the help of Rick, the leak was fixed.

The vacuum pump for the gas lines was removed for repairing the leaking hose.

Entry  Thursday, July 19, 2012, 08:42, Anders Mjos, , , , , , , Problems/Solutions, Leak checking source chamber - leak found on front door 

Due to high vacuum a leak check will be done on the system.

Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec

Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.

Thursday, July 19, 2012, 09:08: Leak detected on front door. Mid 1E-6 range. Main leak left or bottom side.

Thursday, July 19, 2012, 09:20: Leak on side door could not be reproduced. Previous response possibly due to  "cross-talk" with front door.

Entry  Thursday, July 19, 2012, 09:35, Anders Mjos, , , , , , , Done, Venting to investigate leak on front door 

Thursday, July 19, 2012, 09:35: Switched off both turbos.

Thursday, July 19, 2012, 10:23: Venting

 

    Reply  Thursday, July 19, 2012, 11:31, Anders Mjos, , , , , , , Problems/Solutions, Wiped o-rings and sealing faces 

Anders Mjos wrote:

Due to high vacuum a leak check will be done on the system.

Thursday, July 19, 2012, 09:00 : Base leak rate 4E-9 atm-cc/sec

Thursday, July 19, 2012, 09:07: Leak detected on side door. Mid 1E-8 range.

Thursday, July 19, 2012, 09:08: Leak detected on front door. Mid 1E-6 range. Main leak left or bottom side.

Thursday, July 19, 2012, 09:20: Leak on side door could not be reproduced. Previous response possibly due to  "cross-talk" with front door.

 Thursday, July 19, 2012, 11:29: Wiped both o-rings, grooves and sealing faces with kimwipes. Removed black and brown residues.

Entry  Thursday, July 19, 2012, 11:32, Anders Mjos, , , , , , , Done, Pumping down 

Thursday, July 19, 2012, 11:29: roughing

Thursday, July 19, 2012, 11:49: starting turbos

Thursday, July 19, 2012, 11:54: TP1B at speed

Thursday, July 19, 2012, 11:58: TP1A timed out

Thursday, July 19, 2012, 11:58 TP1A restarted. at speed.

Thursday, July 19, 2012, 11:59: both turbos at speed. Vacuum. 2E-5

 

 

 

Entry  Thursday, July 19, 2012, 12:59, Anders Mjos, , , , , , , Problems/Solutions, Leak checking doors - no response 

Thursday, July 19, 2012, 12:57: Doors leak checked. No response. Base rate 1.6E-8 atm-cc/sec. TP pressuer 0.0E-4 Torr . TSGIG1 4.2E-6 Torr. TSG:CG1A 0.014 Torr.