Entry  Monday, June 04, 2012, 11:40, Anders Mjos, , , , , , , In progress, Empty chamber 
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos. 
    Reply  Tuesday, June 26, 2012, 16:06, Anders Mjos, , , , , , , Done, Vented 


    
        
            Anders Mjos wrote:
        
        
            
            HS water lines blanked.
Entry  Tuesday, June 26, 2012, 18:30, Anders Mjos, , , , , , , Problems/Solutions, Crack in source tray insulator Cracked_insulator.pdf
 A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment.
Entry  Thursday, June 28, 2012, 11:04, Pierre Bricault, Test FEBIAD, LP-FEBIAD, , , , , In progress, Ready to bias the high voltage. 
 
Entry  Thursday, June 28, 2012, 11:13, Pierre Bricault, , LP-FEBIAD, , , , , , ISAC test stand ready for cathode heating 
The ISAC test stand is ready for cathode heating.
Bias voltage: 30000 V
Bias current: 37 microAmp
Entry  Thursday, June 28, 2012, 11:19, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode ramping to 230 A in progress 
 
Entry  Thursday, June 28, 2012, 11:27, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heating in progress, pressure 8.3e-7 T 
 
Entry  Thursday, June 28, 2012, 11:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Lost all cnntrol interface, complete whiteout of the epics system. 
 
Entry  Thursday, June 28, 2012, 15:14, Aurelia Laxdal, , LP-FEBIAD, , , , , , Quick check 
Just a quick check at the Test Stand:
1. The system operational (  white out not present ) with TSH:TBHT heating in progress.
2. Started the Archivers: for Source and Optics.
Entry  Thursday, June 28, 2012, 17:00, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heater reached its value of 230 A and stoped. good test. 
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
 
Entry  Thursday, June 28, 2012, 17:18, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Leave the cathode heater at 275 A overninght. 
 
Entry  Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating 
 This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A.
Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 
start mass scan to do new mass calibration
Entry  Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished mass_spectrum_2012_06_29.PNG
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt


Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 
    Reply  Friday, June 29, 2012, 16:39, Friedhelm Ames, , , , , , , , mass scan finished 


    
        
            Friedhelm Ames wrote:
        
        
            
            mass spectrum saved as
Entry  Tuesday, July 03, 2012, 09:23, Friedhelm Ames, , , , , , , In progress, start up again 
purged Ne line and started cathode heater ramp up to 295 A
Entry  Tuesday, July 03, 2012, 19:05, Friedhelm Ames, , , , , , , Problems/Solutions, short in anode 
A short in the anode has developed during the heater ramp up. Increasing the current limit did not cure it. Start heater ramp down to investigate.
Entry  Wednesday, July 04, 2012, 09:22, Friedhelm Ames, , , , , , , Problems/Solutions, turbo pumps stopped 
turbo pumps stopped to prepare for venting for anode short investigation.
    Reply  Wednesday, July 04, 2012, 13:07, Anders Mjos, , , , , , , Problems/Solutions, water lines purged 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps stopped to prepare for venting for anode short investigation.