Entry  Monday, September 24, 2012, 13:52, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 
See e-fault 6329
Tried to start the pump from another power outlet with Edi. No luck. Pump will be replaced tomorrow.
Entry  Monday, September 24, 2012, 15:25, Anders Mjos, , , , , , , Done, TMS RP and TP started 
 
    Reply  Tuesday, September 25, 2012, 13:05, Anders Mjos, , , , , , , Problems/Solutions, TSG:RP1 will not start without blowing the fuse 


    
        
            Anders Mjos wrote:
        
        
            
            See e-fault 6329
Entry  Tuesday, September 25, 2012, 13:25, Anders Mjos, , , , , , , Done, Started turbos after replaced roughing pump 
 
Entry  Tuesday, September 25, 2012, 16:10, Aurelia Laxdal, , , , , , , , Conditioning - SiC-HP-FEBIAD for operator training 
Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A
Entry  Thursday, September 27, 2012, 12:27, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training 
The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.
Entry  Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off 
Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.
Entry  Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON  
Turned the source back ON. Heaters are ramping up.
Entry  Wednesday, October 03, 2012, 13:50, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, Training updates 
On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being
the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and
also over the week-end.
Entry  Wednesday, October 10, 2012, 10:47, Friedhelm Ames, , , , , , , Failed, found teststand tripped off 
turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
    Reply  Wednesday, October 10, 2012, 17:35, Aurelia Laxdal, , , , , , , Failed, found teststand tripped off 


    
        
            Friedhelm Ames wrote:
        
        
            
            turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.
Entry  Thursday, October 25, 2012, 11:13, Anders Mjos, Test, HP-FEBIAD, , , , , In progress, Venting chamber for installation of TiC#3 
Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T
Thursday, October 25, 2012, 11:12: Turbos off
Thursday, October 25, 2012, 11:50: Venting
Entry  Monday, November 05, 2012, 14:42, Anders Mjos, Test SiC, HP-FEBIAD, , , , , Done, Pumping down 
Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58: Started turbos
Monday, November 05, 2012, 15:06 : Turbos at speed
Entry  Monday, November 19, 2012, 10:20, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , Preparations for E-Fault#6389 investigations 
Prepared the Test Stand for Controls to investigate E-Fault#6389.

Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.
Entry  Thursday, November 22, 2012, 12:52, Aurelia Laxdal, Test-SiC, HP-FEBIAD, , , , , , E-Fault#6389 re-directed to PS 
Evgeniy and Kazuya investigated the problem with TSH:TGHT readbacks and they came to the conclusion that the PS is faulty, and the PLC reads correctly
the signal sent by the PS.  Kazuya is redirecting the E-Fault from Controls to PS.
Ray Dube estimated few weeks (4-6) to send the PS offsite for repairs. This needs to be scheduled. For the time being, one can use the Test Stand
Entry  Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work 
 Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting
Entry  Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down 
Thursday, November 29, 2012, 16:21: Roughing
Entry  Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting 
 
Entry  Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress 
in preparation for RFQ testing. By Sebastian and Anders
An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target
assembly was placed in the upper slot on the source tray.
Entry  Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through 
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through.