  56   Tuesday, March 06, 2012, 15:51 Friedhelm Ames       turbopumps in mass separator section started    
  58   Wednesday, March 07, 2012, 10:36 Paul Mocock       HV conditioning begins.HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1.
  
  64   Thursday, March 08, 2012, 17:39 Friedhelm Ames      Problems/SolutionsTPS:Q2 amd TMS:MB1 failedTPS:Q2 and TMS:MB1 failed during the scan.
-> restarted.
  
  65   Thursday, March 08, 2012, 18:32 Friedhelm Ames       mass scan crashed due to a network errormass scan crashed due to a network error
will be restarted tomorrow
  
  69   Friday, March 09, 2012, 17:25 Friedhelm Ames       heaters and HV power supplies offheaters and HV power supplies have been
switched off
IG1 5.1e-9 T.
  
  70   Wednesday, April 11, 2012, 09:30 Friedhelm Ames      FailedTSGRP1 poor vacuumThe backing pressure at TSGRP1 does not
go below 578 mT. Fault report to vacuum.
  
  71   Wednesday, April 11, 2012, 09:34 Friedhelm Ames       turbopumps in mass separator section startedturbopumps in mass separator section started
after power outages
  
  74   Wednesday, April 18, 2012, 12:19 Anders Mjos      Problems/SolutionsNoise from roughing pump TSGRP1Wednesday, April 18, 2012, 12:15: Blanked
off cooling lines. Chamber ready to be pumped
down.
  
  75   Wednesday, April 18, 2012, 13:09 Anders Mjos      Problems/SolutionsNoise from roughing pump TSGRP1

    

       
            
  
  78   Thursday, April 26, 2012, 09:14 Anders Mjos       removed Al(CH3)3

    

       
            
  
  79   Wednesday, May 09, 2012, 08:56 Anders Mjos      Problems/SolutionsTSGIG1 not working TSGIG1 has timed out. As seen on
the attached screen shot, the IG has been
out since 17h May 1st.
 TestStand-IG.PNG 
  80   Wednesday, May 09, 2012, 09:16 Anders Mjos      Problems/SolutionsTSGIG1 not working

    

       
            
  
  81   Thursday, May 10, 2012, 08:13 Anders Mjos      Problems/SolutionsVenting for TSGIG1 repair

    

       
            
  
  82   Thursday, May 10, 2012, 09:48 Anders Mjos      Problems/SolutionsIon Gauge filament replaced

    

       
            
  
  83   Monday, May 14, 2012, 15:36 Aurelia Laxdal       Test Stand - IOC rebootDid a local IOC reboot to cure to white-out.
The test stand is now operational.
  
  84   Monday, May 14, 2012, 16:57 Aurelia Laxdal  ITETM4   SiC#27-HP-SIS installed in the Test StandRick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down.
  
  87   Tuesday, May 15, 2012, 08:15 Rick Maharaj       Test Stand chamber venting    
  88   Tuesday, May 15, 2012, 08:16 Rick Maharaj       Water circuits flushed    
  89   Tuesday, May 15, 2012, 08:42 Rick Maharaj       target removed    
  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started    