81
|
Thursday, May 10, 2012, 08:13 |
Anders Mjos | | | | | | | Problems/Solutions | Venting for TSGIG1 repair |
Anders Mjos wrote: |
Anders Mjos wrote: |
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
|
Wednesday, May 09, 2012, 09:15: ISAC Fault Report submitted
|
Thursday, May 10, 2012, 08:12: Venting vacuum chamber for Edi - to repair the Ion Gauge.
Thursday, May 10, 2012, 08:45: Vented. |
|
82
|
Thursday, May 10, 2012, 09:48 |
Anders Mjos | | | | | | | Problems/Solutions | Ion Gauge filament replaced |
Anders Mjos wrote: |
Anders Mjos wrote: |
Anders Mjos wrote: |
TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.
|
Wednesday, May 09, 2012, 09:15: ISAC Fault Report submitted
|
Thursday, May 10, 2012, 08:12: Venting vacuum chamber for Edi - to repair the Ion Gauge.
Thursday, May 10, 2012, 08:45: Vented.
|
Thursday, May 10, 2012, 09:38: Ion Gauge filament replaced by Edi.
Thursday, May 10, 2012, 09:48 : Pumping down.
Thursday, May 10, 2012, 10:17: Ion Gauge reading vacuum at 1.3 E-5 torr. |
|
83
|
Monday, May 14, 2012, 15:36 |
Aurelia Laxdal | | | | | | | | Test Stand - IOC reboot | Did a local IOC reboot to cure to white-out. The test stand is now operational. |
|
84
|
Monday, May 14, 2012, 16:57 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27-HP-SIS installed in the Test Stand | Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down. |
|
85
|
Tuesday, May 15, 2012, 07:39 |
Rick Maharaj | Sic #27 | HP-SIS | ITE | TM4 | | | In progress | Water on at test stand | The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure. |
|
86
|
Tuesday, May 15, 2012, 08:08 |
Rick Maharaj | sic#27 | | | | | | | Turbos off | Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed. |
|
87
|
Tuesday, May 15, 2012, 08:15 |
Rick Maharaj | | | | | | | | Test Stand chamber venting | |
|
88
|
Tuesday, May 15, 2012, 08:16 |
Rick Maharaj | | | | | | | | Water circuits flushed | |
|
89
|
Tuesday, May 15, 2012, 08:42 |
Rick Maharaj | | | | | | | | target removed | |
|
90
|
Tuesday, May 15, 2012, 09:46 |
Rick Maharaj | | | | | | | | target reinstalled pumping started | |
|
91
|
Tuesday, May 15, 2012, 10:14 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | target ready to be heated and biased | Tuesday, May 15, 2012, 10:13: Turbo pumps at speed. Vacuum at 1.4E-5.
Tuesday, May 15, 2012, 12:03: Cooling lines opened. Vacuum stable at 1.6E-6
Tuesday, May 15, 2012, 12:17: Target ready to be heated and biased. |
|
92
|
Tuesday, May 15, 2012, 16:18 |
Aurelia Laxdal | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | Target/Ion source conditioning | Did the HV conditioning up to 30kV and started to ramp up the heaters to 580A and 230A. |
|
93
|
Wednesday, May 16, 2012, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Loose chip of insulator material detected | A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed. |
Attachment 1: Ceramic_Chip.pdf
|
|
|
94
|
Wednesday, May 16, 2012, 18:10 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27 cooling down | Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem: under investigations.
Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575
Started the cool down. |
|
95
|
Wednesday, May 16, 2012, 19:55 |
Friedhelm Ames | | | | | | | Problems/Solutions | Hall probe reading wrong | During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls. |
|
96
|
Thursday, May 17, 2012, 08:36 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Done | Target removed | Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging cooling lines.
Thursday, May 17, 2012, 08:55: Venting.
Thursday, May 17, 2012, 09:21: Target removed |
|
97
|
Thursday, May 17, 2012, 12:19 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Problems/Solutions | Loose chip of insulator material detected |
Anders Mjos wrote: |
A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.
|
The chip came from the lower insulator stand-off on the target assembly (see attachment). After investigating the chipped insulator, it was decided (Pierre, Friedhelm, Anders) not to replace it - as the risk involved may be less than the risk involved in replacing. |
Attachment 1: Chipped_insulator_stand-off.pdf
|
|
|
99
|
Thursday, May 17, 2012, 15:14 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting turbos.
Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5. |
|
100
|
Thursday, May 31, 2012, 14:46 |
Anders Mjos | | | | | | | | Venting in preparation for Ta#38 | Thursday, May 31, 2012, 14:46: Switching off turbos
Thursday, May 31, 2012, 15:05: Venting |
|
101
|
Thursday, May 31, 2012, 15:43 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | Target ready to be heated | Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting turbos
Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5
Friday, June 01, 2012, 08:08: Cooling water opened. Vacuum stable at 5.7E-7. Target ready to be heated and biased. |
|