  83   Monday, May 14, 2012, 15:36 Aurelia Laxdal       Test Stand - IOC reboot

Did a local IOC reboot to cure to white-out. The test stand is now operational.

  84   Monday, May 14, 2012, 16:57 Aurelia Laxdal  ITETM4   SiC#27-HP-SIS installed in the Test Stand

Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down.

  85   Tuesday, May 15, 2012, 07:39 Rick MaharajSic #27HP-SISITETM4  In progressWater on at test stand

The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure.

  86   Tuesday, May 15, 2012, 08:08 Rick Maharajsic#27      Turbos off

Target needs to be removed form teststand to remove heatshielding around target oven. The chamber will be vented, water circuits flushed and target removed.

  87   Tuesday, May 15, 2012, 08:15 Rick Maharaj       Test Stand chamber venting
  88   Tuesday, May 15, 2012, 08:16 Rick Maharaj       Water circuits flushed
  89   Tuesday, May 15, 2012, 08:42 Rick Maharaj       target removed
  90   Tuesday, May 15, 2012, 09:46 Rick Maharaj       target reinstalled pumping started
  91   Tuesday, May 15, 2012, 10:14 Anders MjosSiC#27HP-SISITETM4  In progresstarget ready to be heated and biased

 Tuesday, May 15, 2012, 10:13: Turbo pumps at speed. Vacuum at 1.4E-5.

Tuesday, May 15, 2012, 12:03: Cooling lines opened. Vacuum stable at 1.6E-6

Tuesday, May 15, 2012, 12:17: Target ready to be heated and biased.

  92   Tuesday, May 15, 2012, 16:18 Aurelia LaxdalSiC#27HP-SISITETM4  In progressTarget/Ion source conditioning

Did the HV conditioning up to 30kV and started to ramp up the heaters to 580A and 230A.

  93   Wednesday, May 16, 2012, 16:01 Anders Mjos      Problems/SolutionsLoose chip of insulator material detected

 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.

Attachment 1: Ceramic_Chip.pdf
Ceramic_Chip.pdf
  94   Wednesday, May 16, 2012, 18:10 Aurelia Laxdal  ITETM4   SiC#27 cooling down

Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem:  under investigations.

Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575

Started the cool down.

  95   Wednesday, May 16, 2012, 19:55 Friedhelm Ames      Problems/SolutionsHall probe reading wrong

During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor of 1.31 lower than during previous measurements. A fault report has been issued to controls.

  96   Thursday, May 17, 2012, 08:36 Anders MjosSiC#27HP-SISITETM4  DoneTarget removed

Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.

Thursday, May 17, 2012, 08:51: Purging cooling lines.

Thursday, May 17, 2012, 08:55: Venting.

Thursday, May 17, 2012, 09:21: Target removed

  97   Thursday, May 17, 2012, 12:19 Anders MjosSiC#27HP-SISITETM4  Problems/SolutionsLoose chip of insulator material detected

Anders Mjos wrote:

 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.

 The chip came from the lower insulator stand-off on the target assembly (see attachment). After investigating the chipped insulator, it was decided (Pierre, Friedhelm, Anders) not to replace it - as the risk involved may be less than the risk involved in replacing.

Attachment 1: Chipped_insulator_stand-off.pdf
Chipped_insulator_stand-off.pdf
  99   Thursday, May 17, 2012, 15:14 Anders Mjos       Pumping down empty chamber

Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.

Thursday, May 17, 2012, 16:52: Starting turbos.

Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5.

  100   Thursday, May 31, 2012, 14:46 Anders Mjos       Venting in preparation for Ta#38

Thursday, May 31, 2012, 14:46: Switching off turbos

Thursday, May 31, 2012, 15:05: Venting

  101   Thursday, May 31, 2012, 15:43 Anders MjosTa#38LP-SISITWTM1  In progressTarget ready to be heated

Thursday, May 31, 2012, 15:42: Roughing

Thursday, May 31, 2012, 16:01 : Starting turbos

Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5

Friday, June 01, 2012, 08:08: Cooling water opened. Vacuum stable at 5.7E-7. Target ready to be heated and biased.

  102   Friday, June 01, 2012, 12:23 Aurelia LaxdalTa#38LP-SISITWTM1  In progressHV & Heaters conditioning.

Did the HV conditioning.

Heaters conditioning in progress.

The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.

Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.

Started cool-down.

  103   Monday, June 04, 2012, 10:51 Anders MjosTa#38LP-SISITWTM1  DoneVenting chamber

Aurelia Laxdal wrote:

Did the HV conditioning.

Heaters conditioning in progress.

The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.

Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.

Started cool-down.

 Monday, June 04, 2012, 10:51: Turbos switched off

Monday, June 04, 2012, 11:06: Purging water. Venting.

Monday, June 04, 2012, 11:36: Target removed