Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 17 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject
  175   Friday, August 17, 2012, 08:30 Pierre Bricault      In progressFEBIAD test with cathode biased

Yesterday Ray Dube has changed the configuration in order to run the FEBIAD with the cathode on negative bias.

There were a short between the gas line and the common. The box has been opened and the short removed.

This morning I am turning on the cathode heater to 290 A.

  176   Friday, August 17, 2012, 10:09 Pierre Bricault      In progressFEBIAD test cathode bias

Backing pressure on the bender section is quite large. TMSIG6 reads 5.09E-7 T and TMS:CG2B reads 0.249 T!

  177   Friday, August 17, 2012, 12:53 Pierre Bricault      Done 

Test completed.

exel file on My Documents in folder FEBIAD Test Aout2012/TestFEBIAD

 Edited by Anders 2012-09-19, file attached.

Attachment 1: TestFEBIAD.xlsx
  178   Thursday, August 23, 2012, 10:11 Anders Mjos      In progressVenting - installation of NiO#1

Thursday, August 23, 2012, 10:10: Vacuum 2.1E-7

Thursday, August 23, 2012, 10:10: Stopped both turbos.

Thursday, August 23, 2012, 10:20: Water purged.

Thursday, August 23, 2012, 10:53: Venting

  179   Thursday, August 23, 2012, 10:40 Anders Mjos      Problems/SolutionsReplaced TMSRP2

Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.

Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started.

  181   Thursday, August 23, 2012, 11:59 Anders Mjos      Problems/SolutionsRoughing blows the fuse for both roughing pumps.

The fuse for both roughing pumps blows when roughing the chamber. With the help from Edi: disconnect the exhaust port on the roughing pump for the first few hundred torrs of roughing. Reconnect and continue.

Seems the roughing pump RP1  pushes air towards the exhaust of RP2 which blows the fuse

  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working

When turned ON it was not going higher than 3.6A (EPICS/front panel). Kazuya checked the connections at the back and also the EPICS/PLC/PS input/output signals. He compared these values with the similar once of the TSH:TBHT PS (which is also a Xantrex PS 10-600). E-Fault 6275

It turned out to be the connections on the top of the ion source box: the target heater was not connected and the power supply was not seeing the load. Tomorrow we'll check all the top connections, with the corresponding power supplies.

  189   Friday, August 31, 2012, 10:19 Anders Mjos      Problems/SolutionsReplaced TMSRP2 (again)

Anders Mjos wrote:

Thursday, August 23, 2012, 10:40: Replacing TMSRP2 with Edi. E-fault 6261.

Thursday, August 23, 2012, 10:49: TMSRP2 replaced and started.

Edi will replace TMSRP2 again as it became noisy since yesterday morning. Vacuum should not be affected by the work.

  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       

start high voltage and heaters

  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan started

mass scan has been started after optimization on 23Na

  196   Friday, September 07, 2012, 13:10 Friedhelm AmesNb#7     Donemass scan finished

mass scan is finished saved as

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/plotdump-local-clean.txt_Sep7_12_13-01-51.txt

  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool down

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

  199   Tuesday, September 11, 2012, 19:48 Friedhelm AmesNB#7HP-SIS    Donecool down finished, all source power supplies off.
  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started
  205   Friday, September 14, 2012, 16:33 Anders Mjos      In progressPumping down empty chamber

Friday, September 14, 2012, 16:33: Roughing

Friday, September 14, 2012, 16:57: Starting turbos

Friday, September 14, 2012, 17:05 : Turbos at speed

Friday, September 14, 2012, 17:07: Vacuum at 8.7E-6

 

  206   Thursday, September 20, 2012, 14:24 Anders Mjos      In progressVenting - installation of FEBIAD test target for operator training

Thursday, September 20, 2012, 14:24: Turbos off

Thursday, September 20, 2012, 15:20: Venting

  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Anders Mjos wrote:

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

 Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr.

  209   Friday, September 21, 2012, 08:27 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A/B fluctuating

Backing pressures TSG:CG1A/B are fluctuating between 0.02 and 0.05 since Sept 17th at ~17h. Expected values <0.01.

  210   Monday, September 24, 2012, 10:31 Anders Mjos      Problems/SolutionsEPICS whiteout

 Test stand was off this morning and EPICS controls in "white-out". Controls is looking into it.

Update  13:51:

Controls have reestablished contact with the PLC.

ELOG V2.9.2-2455