Entry  Wednesday, May 16, 2012, 16:01, Anders Mjos, , , , , , , Problems/Solutions, Loose chip of insulator material detected Ceramic_Chip.pdf
 A chip of insulator material was detected below the lower target insulator stand-off (attachment - left picture). The chip may come from the tube
heater insulator above (attachment - right picture). The chip will be further investigated when the target is removed.
Entry  Wednesday, May 16, 2012, 19:55, Friedhelm Ames, , , , , , , Problems/Solutions, Hall probe reading wrong 
During the mass scan today it was discovered, that the mass calibration was off. Further investigation showed, that the Hall probe readings are a factor
of 1.31 lower than during previous measurements. A fault report has been issued to controls.
Entry  Thursday, May 17, 2012, 15:14, Anders Mjos, , , , , , , , Pumping down empty chamber 
Thursday, May 17, 2012, 15:14: Started roughing. Cooling lines blanked off.
Thursday, May 17, 2012, 16:52: Starting turbos.
Thursday, May 17, 2012, 17:00: Turbos at speed. Vacuum at 1.5E-5.
Entry  Thursday, May 31, 2012, 14:46, Anders Mjos, , , , , , , , Venting in preparation for Ta#38 
Thursday, May 31, 2012, 14:46: Switching off turbos
Thursday, May 31, 2012, 15:05: Venting
Entry  Monday, June 04, 2012, 11:40, Anders Mjos, , , , , , , In progress, Empty chamber 
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos. 
    Reply  Tuesday, June 26, 2012, 16:06, Anders Mjos, , , , , , , Done, Vented 


    
        
            Anders Mjos wrote:
        
        
            
            HS water lines blanked.
Entry  Tuesday, June 26, 2012, 18:04, Anders Mjos, FEBIAD anode end cap test, , , , Tube only, 38307-9, In progress, FEBIAD anode end cap test - ready 
Testing FEBIAD anode end cap as per dwg ITD0304 REV C
Target with TUBE ONLY. Do not use target heater.

Tuesday, June 26, 2012, 18:03: Roughing
Entry  Tuesday, June 26, 2012, 18:30, Anders Mjos, , , , , , , Problems/Solutions, Crack in source tray insulator Cracked_insulator.pdf
 A crack in the insulator ITD0054 was observed while mounting the target assembly. See attachment.
Entry  Thursday, June 28, 2012, 11:04, Pierre Bricault, Test FEBIAD, LP-FEBIAD, , , , , In progress, Ready to bias the high voltage. 
 
Entry  Thursday, June 28, 2012, 11:13, Pierre Bricault, , LP-FEBIAD, , , , , , ISAC test stand ready for cathode heating 
The ISAC test stand is ready for cathode heating.
Bias voltage: 30000 V
Bias current: 37 microAmp
Entry  Thursday, June 28, 2012, 11:19, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode ramping to 230 A in progress 
 
Entry  Thursday, June 28, 2012, 11:27, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heating in progress, pressure 8.3e-7 T 
 
Entry  Thursday, June 28, 2012, 11:29, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Lost all cnntrol interface, complete whiteout of the epics system. 
 
Entry  Thursday, June 28, 2012, 15:14, Aurelia Laxdal, , LP-FEBIAD, , , , , , Quick check 
Just a quick check at the Test Stand:
1. The system operational (  white out not present ) with TSH:TBHT heating in progress.
2. Started the Archivers: for Source and Optics.
Entry  Thursday, June 28, 2012, 17:00, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Cathode heater reached its value of 230 A and stoped. good test. 
Now ramp cathode current up to 290 A. The total current out is 1.e-7 A.
 
Entry  Thursday, June 28, 2012, 17:18, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Leave the cathode heater at 275 A overninght. 
 
Entry  Friday, June 29, 2012, 08:57, Pierre Bricault, , LP-FEBIAD, , , , , In progress, Continue cathode heating 
 This morning the pressure was 3.5E-7 T. Current at 275 A is 30nA.
Continue cathode heating to 290 A during meeting.
Start seeing some electron current from the cathode around 275 A.
Entry  Friday, June 29, 2012, 13:39, Friedhelm Ames, , , , , , , , start mass scan 
start mass scan to do new mass calibration
Entry  Friday, June 29, 2012, 15:02, Friedhelm Ames, , , , , , , , mass scan finished mass_spectrum_2012_06_29.PNG
mass spectrum saved as
plotdump-local-clean.txt_Jun29_12_14-55-43.txt


Entry  Friday, June 29, 2012, 15:03, Friedhelm Ames, , , , , , , , start ramping down heater 
 