819
|
Friday, November 06, 2020, 12:53 |
Aaron Schmidt | Nb#9 | LP-SIS | ITW | TM2 | 44508-2 | 43515-4 | In progress | Conditioning Nb#9 w/ P/S Target & Bracket | Attached end plate parasitic / symbiotic
target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24: |
7x |
649
|
Friday, March 16, 2018, 08:15 |
Aaron Schmidt | Nb#8 | HP-SIS | ITW | TM2 | 38817-2 | 42738-12 | In progress | Conditioning Nb#08 | Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo
pumps started. |
6x |
192
|
Friday, August 31, 2012, 13:59 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Nb#7 installed | Friday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos |
|
193
|
Tuesday, September 04, 2012, 08:11 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Nb#7 installed |
|
|
196
|
Friday, September 07, 2012, 13:10 |
Friedhelm Ames | Nb#7 | | | | | | Done | mass scan finished | mass scan is finished saved as
Normal
0
|
|
197
|
Friday, September 07, 2012, 14:34 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Problems/Solutions | Insulator ITD0342 overheated - swelling | See attached photo |
|
198
|
Tuesday, September 11, 2012, 13:13 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | In progress | start cool down | start cooldown. Found computer at teststand
off. Somebody tried to login with username
ARIEL. |
|
200
|
Wednesday, September 12, 2012, 08:02 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Venting | Wednesday, September 12, 2012, 08:01: Turbos
off
Wednesday, September 12, 2012, 13:35: |
|
201
|
Wednesday, September 12, 2012, 17:04 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Pumping down - w/replaced insulators | Replaced swollen insulator and added Ta
heat shield on insulator.
|
|
202
|
Thursday, September 13, 2012, 08:24 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | In progress | Water on | Thursday, September 13, 2012, 08:16: Opened
up cooling water. Vacuum (IG1) increased
from 5.9E-7 to 6.2E-7 before returning to |
|
203
|
Thursday, September 13, 2012, 13:05 |
Friedhelm Ames | Nb#7 | LP-SIS | | | | | | heater ramping up started | |
|
204
|
Friday, September 14, 2012, 15:27 |
Anders Mjos | Nb#7 | LP-SIS | ITW | TM1 | | | Done | Venting | Target cooled down. Power supplies off.
Friday, September 14, 2012, 15:27:
Turbos off. |
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T |
|
59
|
Wednesday, March 07, 2012, 13:48 |
Friedhelm Ames | Nb#6 | | | | | | | high voltage conditioning | High voltage conditioning has been started
by ISAC ops. Einzel lens is unstable below
5 kV., o.k. above this. |
|
60
|
Wednesday, March 07, 2012, 17:44 |
Friedhelm Ames | Nb#6 | | | | | | | ramping up heaters | ramping up heaters has been started by
ISAC ops. |
|
61
|
Thursday, March 08, 2012, 09:14 |
Friedhelm Ames | Nb#6 | | | | | | | continue target heating | continue target heating up to 580 A. Strip
tool for the heating up to 300A from yesyerday
see below |
|
62
|
Thursday, March 08, 2012, 14:08 |
Friedhelm Ames | Nb#6 | | | | | | | heater ramped up | heaters have reached final values TGHT
580 A, TBHT 230 A, some sparking during ramp
up. see strip tool image attached |
|
63
|
Thursday, March 08, 2012, 17:16 |
Friedhelm Ames | Nb#6 | | | | | | | mass scan started | |
|
66
|
Friday, March 09, 2012, 08:53 |
Friedhelm Ames | Nb#6 | | | | | | In progress | mass scan started | mass scan started again. Total current
3.2e-8 A |
|
67
|
Friday, March 09, 2012, 10:56 |
Friedhelm Ames | Nb#6 | | | | | | | scan finished | mass scan is finished and saved see attached. |
|