Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 12 of 53  Not logged in ELOG logo
ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  819   Friday, November 06, 2020, 12:53 Aaron SchmidtNb#9LP-SISITWTM244508-243515-4In progressConditioning Nb#9 w/ P/S Target & Bracket

Attached end plate parasitic / symbiotic target & PEEK assembly bracket.

Friday, November 06, 2020, 12:24: Roughing.

Friday, November 06, 2020, 12:53: TP1B on.

Friday, November 06, 2020, 13:05: TP1A on. 

Friday, November 06, 2020, 13:16: IG1 on.


Monday, November 09, 2020, 06:26: Vacuum @ 1.25e-06T.

Monday, November 09, 2020, 06:28: HS waterline opened. Vacuum ok @ 1.25e-06T.

Monday, November 09, 2020, 06:36: Power/sources on.

Monday, November 09, 2020, 06:39: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 23.96 5.15
 TBHT 23.78

8.02

 COIL + EE 23.67 2.39
 TGHT 23.77 6.19

Monday, November 09, 2020, 06:4: Optics on.

Monday, November 09, 2020, 08:10: IV4 open.

Monday, November 09, 2020, 08:15: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, November 09, 2020, 08:19: Wire & Mass scans @ 350 / 150 A. Ok.

Monday, November 09, 2020, 08:27: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Monday, November 09, 2020, 11:40: Mass & wire scans complete.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.27 7.12
 TBHT 24.88

9.73

 COIL + EE 24.65 3.26
 TGHT 24.88 7.05

Monday, November 09, 2020, 13:46: E-rig PS off.


Tuesday, November 10, 2020, 04:47: Auto-cooling @ 2A per min. 

Tuesday, November 10, 2020, 06:21: HV @ 0 V. 

Tuesday, November 10, 2020, 06:58: TBHT @ 0 A. TGHT @ 317 A. Auto-cooling @ 3A per min. 

Tuesday, November 10, 2020, 09:06: IV4 Close. Sources off.

Tuesday, November 10, 2020, 09:07: IG1, power, & Turbo pumps off.

Tuesday, November 10, 2020, 10:15: Waterline purged. Venting.

  649   Friday, March 16, 2018, 08:15 Aaron SchmidtNb#8HP-SISITWTM238817-242738-12In progressConditioning Nb#08

Friday, March 16, 2018, 08:42: Roughing.

Friday, March 16, 2018, 10:34: Turbo pumps started.

Friday, March 16, 2018, 10:40: Ion gauge on.

Friday, March 16, 2018, 10:45: RGA on.

Friday, March 16, 2018, 13:10: Check. Vacuum @ 7.37e-7T


Monday, March 19, 2018, 06:44: Waterlines opened: Vacuum stable @ 2.16e-07T

Monday, March 19, 2018, 06:46: Power/sources on.

Monday, March 19, 2018, 06:49: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 21.6 3.68
 TBHT 22.2 2.97
 COIL + EE 21.4 4.73
 TGHT  21.5 5.39

Monday, March 19, 2018, 06:51: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Monday, March 19, 2018, 06:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Monday, March 19, 2018, 07:02: Optics on & reset.

Monday, March 19, 2018, 10:53: Drops in BIAS voltage from 30kV to below 22.5 kV and spikes to the BIAS current (282 uA) observed. Unstable.

Monday, March 19, 2018, 12:56: Communications issue noted with the mass separator magnet. Increase in Amp achieves no change in Gauss. Kyle L notified.

TMS:HALLMB1:RDFIELD Communication error. 

Monday, March 19, 2018, 14:00: MB1 Communication error fixed. However the negative voltage on Q2 & Q5 in unavailable. 

Monday, March 19, 2018, 15:07: Auto cooling TGHT / TBHT to 500 / 150 A @ 6A/4A per min.

Monday, March 19, 2018, 15:17: Auto cooling halted. TGHT / TBHT @ 501 / 152 A. Manually put to 500 / 150 A.


Controller for TMS:Q5 & TMS:Q2 off for repair.

Tuesday, March 20, 2018, 09:09: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, March 20, 2018, 12:58: The controller was fixed. Nb#08 conditioning continues with tests.


Wednesday, March 21, 2018, 06:24: Auto-cooling @ 2A per min.

Wednesday, March 21, 2018, 11:23: Sources at 0. Off.

Wednesday, March 21, 2018, 11:29: Power off. Waterlines purged.

Wednesday, March 21, 2018, 11:32: RGA off. IV4 closed/reset.

Wednesday, March 21, 2018, 11:33: Ion gauge off. Turbos off.

Wednesday, March 21, 2018, 13:15: Venting.

  192   Friday, August 31, 2012, 13:59 Anders MjosNb#7LP-SISITWTM1  In progressNb#7 installed

Friday, August 31, 2012, 15:19: roughing

Friday, August 31, 2012, 15:39 : starting turbos

Friday, August 31, 2012, 15:44 : TP1B at speed

Friday, August 31, 2012, 15:48 : TP1A timed out

Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.

Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5

  193   Tuesday, September 04, 2012, 08:11 Anders MjosNb#7LP-SISITWTM1  DoneNb#7 installed

Anders Mjos wrote:

Friday, August 31, 2012, 15:19: roughing

Friday, August 31, 2012, 15:39 : starting turbos

Friday, August 31, 2012, 15:44 : TP1B at speed

Friday, August 31, 2012, 15:48 : TP1A timed out

Friday, August 31, 2012, 15:48 : TP1A restarted. at speed.

Friday, August 31, 2012, 15:49 : both turbos at speed. Vacuum @2.7E-5

 Tuesday, September 04, 2012, 08:10: Opened cooling water. Vacuum stable @ 2.2E-7

  196   Friday, September 07, 2012, 13:10 Friedhelm AmesNb#7     Donemass scan finished

mass scan is finished saved as

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/plotdump-local-clean.txt_Sep7_12_13-01-51.txt

  197   Friday, September 07, 2012, 14:34 Anders MjosNb#7LP-SISITWTM1  Problems/SolutionsInsulator ITD0342 overheated - swelling

 See attached photo

  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool down

start cooldown. Found computer at teststand off. Somebody tried to login with username ARIEL.

  200   Wednesday, September 12, 2012, 08:02 Anders MjosNb#7LP-SISITWTM1  In progressVenting

Wednesday, September 12, 2012, 08:01: Turbos off

Wednesday, September 12, 2012, 13:35: Venting, water off and purged.

Wednesday, September 12, 2012, 13:55: Vented

  201   Wednesday, September 12, 2012, 17:04 Anders MjosNb#7LP-SISITWTM1  In progressPumping down - w/replaced insulators

Replaced swollen insulator and added Ta heat shield on insulator.

 

Wednesday, September 12, 2012, 17:03: Roughing

Wednesday, September 12, 2012, 17:23 : Starting turbos

Wednesday, September 12, 2012, 17:32 : Turbos at speed

Wednesday, September 12, 2012, 17:33 : Vacuum at 3.2E-5

  202   Thursday, September 13, 2012, 08:24 Anders MjosNb#7LP-SISITWTM1  In progressWater on

Thursday, September 13, 2012, 08:16: Opened up cooling water. Vacuum (IG1) increased from 5.9E-7 to 6.2E-7 before returning to 5.9E-7. Similar response on IG6 (valve closed). Response is however similar to previous (short time ~5 min) vacuum fluctuations.

  203   Thursday, September 13, 2012, 13:05 Friedhelm AmesNb#7LP-SIS     heater ramping up started
  204   Friday, September 14, 2012, 15:27 Anders MjosNb#7LP-SISITWTM1  DoneVenting

Target cooled down. Power supplies off.

Friday, September 14, 2012, 15:27: Turbos off.

Friday, September 14, 2012, 15:32: Water purged.

 Friday, September 14, 2012, 16:00: Venting

Friday, September 14, 2012, 16:26: Vented

  57   Wednesday, March 07, 2012, 09:27 Friedhelm AmesNb#6     Donewater cooling started

water cooling line valves opened. No response on vacuum TSG:IG1 3.5e-7 T

  59   Wednesday, March 07, 2012, 13:48 Friedhelm AmesNb#6      high voltage conditioning

High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this.

  60   Wednesday, March 07, 2012, 17:44 Friedhelm AmesNb#6      ramping up heaters

ramping up heaters has been started by ISAC ops.

  61   Thursday, March 08, 2012, 09:14 Friedhelm AmesNb#6      continue target heating

continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below

  62   Thursday, March 08, 2012, 14:08 Friedhelm AmesNb#6      heater ramped up

heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached

  63   Thursday, March 08, 2012, 17:16 Friedhelm AmesNb#6      mass scan started
  66   Friday, March 09, 2012, 08:53 Friedhelm AmesNb#6     In progressmass scan started

mass scan started again. Total current 3.2e-8 A

  67   Friday, March 09, 2012, 10:56 Friedhelm AmesNb#6      scan finished

mass scan is finished and saved see attached.

ELOG V2.9.2-2455