  324   Monday, July 22, 2013, 14:08 Anders Mjos      Problems/Solutions20V 60A COIL PS installed for FEBIAD Coil TestBy Ray. Note that controls have not been
updated yet.
  
  323   Friday, July 19, 2013, 14:14 Anders Mjos    Tube only38307-9In progressFEBIAD Coil TestFriday, July 19, 2013, 14:14 : Stopping
Turbos. Vacuum at 1.3E-7 T 
Friday, July 19, 2013, 15:14: 
  
  322   Wednesday, July 17, 2013, 12:55 Anders Mjos      Problems/SolutionsControls are removing dust/cleaning their devicesThursday, July 18, 2013, 08:41: Restarting
archivers
  
  321   Tuesday, July 16, 2013, 16:01 Anders Mjos      Problems/SolutionsFEBIAD coil connector insulator fractureThe right side of the insulator cracked/fractured
either as the bolt was tightened or loosened. 
 Photo_2013-07-16_3_36_45_PM.jpg 
  320   Tuesday, July 16, 2013, 15:39 Anders Mjos       EmptyTuesday, July 16, 2013, 15:39: Roughing
Tuesday, July 16, 2013, 16:01: Starting
turbos.
  
  319   Friday, July 12, 2013, 15:52 Anders Mjos      Problems/SolutionsTMS:MB1 fuse latched after mass scanA flash and "thumb" was observed
at the end of the mass scan.
Friday, July 12, 2013, 15:51: Ray
  
  318   Thursday, July 11, 2013, 08:38 Anders Mjos      Problems/SolutionsBias & EL P/S cleanedThe power supplies were "de-dusted"
yesterday by Ray Dube and team. 
  
  317   Wednesday, July 10, 2013, 10:21 Anders MjosSiC#29HP-FEBIAD-CTLITETM438481-639956-4DoneTesting SiC#29 CTL TargetWednesday, July 10, 2013, 10:20 : Turbos
off. Vacuum at 1.3 E-7 T
Wednesday, July 10, 2013, 11:23:
  
  316   Thursday, June 13, 2013, 11:04 Anders Mjos      Problems/SolutionsViton seals on vacuum chamber doors replacedSee PO# TR193650    
  315   Thursday, June 13, 2013, 10:19 Anders Mjos      DonePumping down empty chamberThursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos
started
  
  314   Wednesday, June 12, 2013, 20:38 Friedhelm Ames      Problems/Solutionstarget heater power supply removedThe target heater power supply at the teststand
has been removed to replace one in ITE.
  
  313   Tuesday, June 11, 2013, 08:41 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off 

    
 DipVacuum.png 
  312   Monday, June 10, 2013, 16:46 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off 

    
 DipCOIL.png 
  311   Monday, June 10, 2013, 08:16 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

    

       
            
  
  310   Friday, June 07, 2013, 08:47 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found offFriday, June 07, 2013, 08:42: Restarted
Q2, Q4 and MB1
  
  309   Monday, June 03, 2013, 15:00 Anders Mjos      Problems/SolutionsSOURCES ARCH RestartedSOURCES ARCH was found not running   
  308   Wednesday, May 29, 2013, 12:10 Anders MjosCTL FEBIADHP-FEBIAD  38481-5 DoneCTL TestWednesday, May 29, 2013, 12:09: Debiased
to insert temp logger
Wednesday, May 29, 2013, 14:40: Temp
 Photo_2013-06-13_10_33_42_AM.jpg 
  307   Tuesday, May 28, 2013, 09:53 Anders Mjos      Problems/SolutionsTPS:Q4 and TPS:Q2 restarted    
  306   Tuesday, May 28, 2013, 09:51 Anders Mjos      Problems/SolutionsArchivers restartedCOIL and ANODE data added to ISACT Data
Archiver
  
  305   Friday, May 24, 2013, 15:13 Aurelia LaxdalCLT FEBIAD      CLT FEBIAD conditioning startedPurged the gas lines, turned on the HV
and started the heaters for CLT FEBIAD: TGHT
up to 580A and TBHT up to 230A.
  