  328   Monday, August 26, 2013, 13:49 Anders Mjos      Problems/SolutionsTP1A time out/fault sometime this weekendMonday, August 26, 2013, 14:07: The turbo
could be restarted, but it does not sound
happy (Dimo was consulted earlier today).
  
  327   Friday, August 23, 2013, 11:16 Anders Mjos      Problems/SolutionsPossible leak between BV1A, BV1B and PV1CG1A is climbing from 0.016 to 0.130 in
30 seconds when isolated.
The leak was confirmed to be between
  
  326   Tuesday, August 20, 2013, 08:27 Anders Mjos      Problems/SolutionsTP1B noise - TP1B replacementTP1B high frequency noise is coming and
going. Power is 22W , current 1.1A (other
pumps are 11W and 14W, 0.7A)
  
  325   Tuesday, August 20, 2013, 08:24 Anders Mjos    Tube only38307-9In progressFEBIAD Coil TestTuesday, August 20, 2013, 08:13: Roughing
gas lines
Tuesday, August 20, 2013, 08:22:
  
  324   Monday, July 22, 2013, 14:08 Anders Mjos      Problems/Solutions20V 60A COIL PS installed for FEBIAD Coil TestBy Ray. Note that controls have not been
updated yet.
  
  323   Friday, July 19, 2013, 14:14 Anders Mjos    Tube only38307-9In progressFEBIAD Coil TestFriday, July 19, 2013, 14:14 : Stopping
Turbos. Vacuum at 1.3E-7 T 
Friday, July 19, 2013, 15:14: 
  
  322   Wednesday, July 17, 2013, 12:55 Anders Mjos      Problems/SolutionsControls are removing dust/cleaning their devicesThursday, July 18, 2013, 08:41: Restarting
archivers
  
  321   Tuesday, July 16, 2013, 16:01 Anders Mjos      Problems/SolutionsFEBIAD coil connector insulator fractureThe right side of the insulator cracked/fractured
either as the bolt was tightened or loosened. 
 Photo_2013-07-16_3_36_45_PM.jpg 
  320   Tuesday, July 16, 2013, 15:39 Anders Mjos       EmptyTuesday, July 16, 2013, 15:39: Roughing
Tuesday, July 16, 2013, 16:01: Starting
turbos.
  
  319   Friday, July 12, 2013, 15:52 Anders Mjos      Problems/SolutionsTMS:MB1 fuse latched after mass scanA flash and "thumb" was observed
at the end of the mass scan.
Friday, July 12, 2013, 15:51: Ray
  
  318   Thursday, July 11, 2013, 08:38 Anders Mjos      Problems/SolutionsBias & EL P/S cleanedThe power supplies were "de-dusted"
yesterday by Ray Dube and team. 
  
  317   Wednesday, July 10, 2013, 10:21 Anders MjosSiC#29HP-FEBIAD-CTLITETM438481-639956-4DoneTesting SiC#29 CTL TargetWednesday, July 10, 2013, 10:20 : Turbos
off. Vacuum at 1.3 E-7 T
Wednesday, July 10, 2013, 11:23:
  
  316   Thursday, June 13, 2013, 11:04 Anders Mjos      Problems/SolutionsViton seals on vacuum chamber doors replacedSee PO# TR193650    
  315   Thursday, June 13, 2013, 10:19 Anders Mjos      DonePumping down empty chamberThursday, June 13, 2013, 10:17: Roughing.
Thursday, June 13, 2013, 10:52: Turbos
started
  
  314   Wednesday, June 12, 2013, 20:38 Friedhelm Ames      Problems/Solutionstarget heater power supply removedThe target heater power supply at the teststand
has been removed to replace one in ITE.
  
  313   Tuesday, June 11, 2013, 08:41 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off 

    
 DipVacuum.png 
  312   Monday, June 10, 2013, 16:46 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off 

    
 DipCOIL.png 
  311   Monday, June 10, 2013, 08:16 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found off

    

       
            
  
  310   Friday, June 07, 2013, 08:47 Anders Mjos      Problems/SolutionsTPS:Q2, TPSQ4 and TMS:MB1 found offFriday, June 07, 2013, 08:42: Restarted
Q2, Q4 and MB1
  
  309   Monday, June 03, 2013, 15:00 Anders Mjos      Problems/SolutionsSOURCES ARCH RestartedSOURCES ARCH was found not running   