Message ID: 928     Entry time: Wednesday, May 25, 2022, 15:48
Author: Aaron Schmidt 
Target/No.#: SiC#42 
Source: HP-FEBIAD 
Station: ITW 
Module: TM2 
Target Oven W.O#: 44692-9 
Heat Shield W.O#: 44378-5 
Status: In progress 
Subject: Conditioning SiC#42 

Wednesday, May 25, 2022, 15:46: Roughing.

Wednesday, May 25, 2022, 16:21: TP1B on.

Wednesday, May 25, 2022, 16:38: TP1A on.

Wednesday, May 25, 2022, 16:46: IG1 on.


Thursday, May 26, 2022, 09:20: FS#5 Waterline opened. Vacuum ok @ 5.27e-06T.


HV preset: BIAS / EE / EZL @ 30 / -1.0 / 15 kV

Friday, May 27, 2022, 05:11: Coil to 40 A. Anode t0 300 V.

Friday, May 27, 2022, 05:16: TGHT on. Auto-ramping TGHT / TBHT to 580 / 290 @ 2 A per min. 

Friday, May 27, 2022, 07:14: Optics set & IV4 opened. TGHT / TBHT @ 242 A (Ramping ongoing)

FM

Friday, May 27, 2022, 17:17 : IG1 @ 5.19e-6 T. TBHT @ 290 A. TGHT @ 540 A since 16:27.

Friday, May 27, 2022, 17:18: The assembly has been outgassing and the good vacuum limit was reached, preventing reaching the operational point.

Friday, May 27, 2022, 17:19: Auto-ramp up aborted. We'll heat up again Monday morning.

Friday, May 27, 2022, 17:20: Auto-cooling to 0 A @ 2A/min 


Sunday, May 29, 2022, 21:35: Auto-ramping TGHT/ TBHT to 350 / 150 A @ 2 A per min - AS.

Sunday, May 29, 2022, 21:40: Vacuum @ 1.43e-06T. 


Monday, May 30, 2022, 04:53: Vacuum @ 1.49e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min - AS 

Monday, May 30, 2022, 08:06: Initial wire & mass scans ok. Increase EE to -1.5 kV.

Monday, May 30, 2022, 08:30: EE back to -1.0 kV.

Monday, May 30, 2022, 10:31: BIAS / EE / EZL / Anode @ 0 kV. Lock over. Open back/top cage.

FM
Monday, May 30, 2022, 11:21: Mass set to 40Ar+. The gas on/off now shows an effect on the signal 

Monday, May 30, 2022, 11:24: Running a small scan to test the web-app 

Monday, May 30, 2022, 14:00: Spark towards TBHT, TPS:Q1 charged up. 

Monday, May 30, 2022, 14:30: Spark to anode. 

Monday, May 30, 2022, 16:16: Issue preventing FEBIAD-scan solve.

Monday, May 30, 2022, 16:16 : FEBIAD scan on 40Ar+.  

Monday, May 30, 2022, 17:00:   TMS :VCB1 died in the middle of the scan. Scan aborted save id 1085. Starting a new scan

 Monday, May 30, 2022, 18:24: measured_id = 1086

Moving to H2O

Monday, May 30, 2022, 18:30: Scan started for H2O. 

Monday, May 30, 2022, 19:53: Scan finished. measure_id = 1087

Monday, May 30, 2022, 19:58: Gas off. Scan for H2O ready to go. 

Monday, May 30, 2022, 19:59: Scan started 

Monday, May 30, 2022, 21:21: Scan finished. measured_id = 1089 

 

Monday, May 30, 2022, 21:32: Auto-cooling to 0 A @ 2A/min


AS

Tuesday, May 31, 2022, 05:10: All HV & Sources off.

Tuesday, May 31, 2022, 05:11: IV4 closed. IG1 & turbo pumps off. 

Tuesday, May 31, 2022, 07:02: IV4 reset. Venting.

Tuesday, May 31, 2022, 07:08: FS#5 purged. Power locked up.

Attachment 1: ER-580-290-30kV-m28.txt  3 kB  Uploaded Thursday, June 23, 2022, 15:14  | Show | Show all
Attachment 2: SiC#42.docx  781 kB  Uploaded Thursday, June 23, 2022, 15:14
Attachment 3: SiC#42_Conditioning_-_R.docx  200 kB  Uploaded Thursday, October 20, 2022, 11:55