Message ID: 906     Entry time: Friday, November 12, 2021, 13:01
Author: Aaron Schmidt 
Target/No.#: Ta#63 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 44691-11 
Heat Shield W.O#: 44378-12 
Status: In progress 
Subject: Conditioning Ta#63 

Friday, November 12, 2021, 13:01: BV1B open. Roughing.

Friday, November 12, 2021, 13:05: BV1A open.

Friday, November 12, 2021, 13:34: TP1B on.

Friday, November 12, 2021, 13:42: TP1A on.

Friday, November 12, 2021, 13:50 : IG1 on. TMS:TP2 trip. Fast reset. OK. Vacuum @ 3.54e-05T. Waterline FS#5 open.

Friday, November 12, 2021, 13:53: Vacuum @ 2.12e-05T. Ok

Friday, November 12, 2021, 13:54: Power / sources on.


Monday, November 15, 2021, 09:00: Auto-ramping TGHT / TBHT to 350 / 150 @ 3 A per min. IV4 open. TMS:VCB1 not functioning. Controls group notified.

Monday, November 15, 2021, 09:40: Optics set minus TMS:VCB1 

Monday, November 15, 2021, 11:16: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.

Monday, November 15, 2021, 11:34: TMS:VCB1 fixed. Optics set ok.

Monday, November 15, 2021, 11:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, November 15, 2021, 15:44: Mass & wire scans complete. OK. HV to 0 kV. IV4 closed.


Tuesday, November 16, 2021, 06:16: Auto-cooling TGHT / TBHT @ 2A per min.

Tuesday, November 16, 2021, 11:13: Power / sources off.

Tuesday, November 16, 2021, 11:14: IG1. Turbo pumps off.

Tuesday, November 16, 2021, 12:12: Venting.

Attachment 1: Ta#63.docx  1.188 MB  Uploaded Tuesday, November 16, 2021, 12:12
Attachment 2: ER-580-230-30kV-m7.txt  3 kB  Uploaded Tuesday, November 16, 2021, 12:12  | Show | Show all
Attachment 3: ER-580-230-30kV-m23.txt  3 kB  Uploaded Tuesday, November 16, 2021, 12:12  | Show | Show all
Attachment 4: ER-580-230-30kV-m131.txt  3 kB  Uploaded Tuesday, November 16, 2021, 12:12  | Show | Show all