Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 596     Entry time: Monday, July 10, 2017, 13:27
Author: Aaron Schmidt 
Target/No.#: Ta#53 
Source: HP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 42218-6 
Heat Shield W.O#: 41751-6 
Status: In progress 
Subject: Conditioning Ta#53 

Monday, July 10, 2017, 14:03: Roughing.

Monday, July 10, 2017, 14:27: Turbo pumps started.

Monday, July 10, 2017, 14:33: Ion gauge on.

Monday, July 10, 2017, 14:36: RGA on. 


Tuesday, July 11, 2017, 06:52: Waterlines opened. No response on RGA. Vacuum ok @ 2.18e-07T

Tuesday, July 11, 2017, 06:56: Power/sources on.

Tuesday, July 11, 2017, 07:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Tuesday, July 11, 2017, 07:04: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.1 3.78
 TBHT 27.0 2.95
 COIL + EE 26.9 4.87
 TGHT  27.1 5.48

Tuesday, July 11, 2017, 07:10: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Tuesday, July 11, 2017, 10:10: RGA error (Spark?). Restarted.

Tuesday, July 11, 2017, 15:08: Anode brought up to 5, 10 15, and 50 V using FEBIAD controls. No Current detected.


Wednesday, July 12, 2017, 08:23:

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.2 3.85
 TBHT 27.5 2.98
 COIL + EE 27.2 4.87
 TGHT  29.5 5.48

Wednesday, July 12, 2017, 14:42: Auto-cooling.


Friday, July 14, 2017, 12:13: Sources off. IV4 Closed (Reset)


Monday, July 17, 2017, 07:55: Power off.

Monday, July 17, 2017, 07:57: Waterlines purged.

Monday, July 17, 2017, 07:59: RGA off. Ion gauge & Turbos off.

Monday, July 17, 2017, 09:43: Venting.

Attachment 1: ER-580-200-30kV-m7.txt  3 kB  Uploaded Monday, July 17, 2017, 09:00  | Show | Show all
Attachment 2: ER-580-200-30kV-m129.txt  3 kB  Uploaded Monday, July 17, 2017, 09:00  | Show | Show all
Attachment 3: TS-2017-07-10-14-35.rga  581 kB  Uploaded Monday, July 17, 2017, 09:00
Attachment 4: TS-2017-07-11-10-10.rga  4.303 MB  Uploaded Monday, July 17, 2017, 09:00
Attachment 5: Ta#53.docx  1.733 MB  Uploaded Tuesday, July 18, 2017, 09:26
Attachment 6: OMEGA_OM-DAQPRO-5300_18-Jul-17_08.11.44.dlp  1.389 MB  Uploaded Tuesday, July 18, 2017, 09:26
Attachment 7: ITW-TM2-Ta#53-HP-SIS_Test_Stand.docx  676 kB  Uploaded Wednesday, July 19, 2017, 09:24
ELOG V2.9.2-2455