Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 592     Entry time: Friday, June 09, 2017, 13:28
Author: Aaron Schmidt 
Target/No.#: Ta#52 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 42218-14 
Heat Shield W.O#: 41751-8 
Status: In progress 
Subject: Conditioning Ta#52 

Friday, June 09, 2017, 13:27: Roughing.

Friday, June 09, 2017, 14:09: Turbo pumps on.

Friday, June 09, 2017, 14:16: Ion gauge on.


Monday, June 12, 2017, 07:20: Waterlines opened. No response on RGA. Vacuum @1.52e-07T.

Monday, June 12, 2017, 07:23: Power/Sources on.

Monday, June 12, 2017, 08:15: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .

Monday, June 12, 2017, 08:16: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.0 3.78
 TBHT 27.3 3.03
 COIL + EE 25.8 4.91
 TGHT  26.0 5.46

Monday, June 12, 2017, 08:18: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Monday, June 12, 2017, 11:33: Spark around 10:30 tripped RGA. Restarting RGA.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 35.9 3.78
 TBHT 26.6 2.95
 COIL + EE 26.1 4.89
 TGHT  28.4 5.46

 


Tuesday, June 13, 2017, 14:50: Auto-cooling @ 2A  per min


Wednesday, June 14, 2017, 07:41: Sources/power off. IV4 closed


Friday, June 16, 2017, 07:16: RGA off

Friday, June 16, 2017, 07:18: Ion gauge & turbo pumps off.

Friday, June 16, 2017, 07:20: Water lines purged.


Monday, June 19, 2017, 13:35: While writing report, it was noticed a step was skipped on the mass correlations. The MassCorr data was not saved. - AS

Attachment 1: ER-580-200-30kV-m7.txt  3 kB  Uploaded Monday, June 19, 2017, 12:13  | Show | Show all
Attachment 2: ER-580-200-30kV-m23.txt  3 kB  Uploaded Monday, June 19, 2017, 12:13  | Show | Show all
Attachment 3: ER-580-200-30kV-m39.txt  3 kB  Uploaded Monday, June 19, 2017, 12:13  | Show | Show all
Attachment 4: OMEGA_OM-DAQPRO-5300_19-Jun-17_10.29.48.dlp  2.292 MB  Uploaded Monday, June 19, 2017, 12:13
Attachment 5: Ta#52.docx  3.042 MB  Uploaded Monday, June 19, 2017, 12:13
Attachment 6: TS-2017-06-09-14-20.rga  2.089 MB  Uploaded Monday, June 19, 2017, 12:13
Attachment 7: TS-2017-06-12-11-34.rga  2.789 MB  Uploaded Monday, June 19, 2017, 12:13
Attachment 8: ITE-TM4-Ta#52-LP-SIS_Test_Stand.docx  801 kB  Uploaded Monday, June 19, 2017, 14:50
ELOG V2.9.2-2455