Message ID: 535     Entry time: Wednesday, August 24, 2016, 09:16
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#: 41882-4 
Heat Shield W.O#: 41751-6 
Status:  
Subject: HS Test OR Clean 

Heat Shield Test (OR only).

For all 6 tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.


HS# 41751-6 . OR only.

No insulators, bracket, or gripper arms. Blank/Plate (new one, old plate was too warped). No source cup.

Wednesday, August 24, 2016, 09:46 : 41751-3 removed from test stand. Exchange target & End plates to 41751-6

Wednesday, August 24, 2016, 10:08: 41751-6 placed into test stand. Door open for 22 minutes.

Wednesday, August 24, 2016, 10:10: Roughing.

Wednesday, August 24, 2016, 10:10: Doors sealed for roughing.

Wednesday, August 24, 2016, 10:18: BV1B OPEN. Opened @ 79T.

Wednesday, August 24, 2016, 10:41: Both Turbo pumps started.

Wednesday, August 24, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.

Wednesday, August 24, 2016, 10:49: TP1A @ speed 38 KRPM.

Wednesday, August 24, 2016, 11:45: RGA on. Vacuum @ 3.38E-6T.


Thursday, August 25, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.36E-7T

Thursday, August 25, 2016, 08:20: Power/sources on.

Thursday, August 25, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.36E-7T.

Thursday, August 25, 2016, 11:21: Screen shots and check made @ 340-344A.

Thursday, August 25, 2016, 13:20: TGHT @ 580A. Vacuum @3.70E-7T.


Friday, August 26, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.53E-7T

Friday, August 26, 2016, 13:20: Cooling Complete. Vacuum @ 1.97E-7T


Monday, August 29, 2016, 08:19: RGA off. Ion gauge and Turbos off.

Monday, August 29, 2016, 09:28: Venting.

Monday, August 29, 2016, 09:35: Power/sources off. Waterlines purged.

Attachment 1: HS_41751-6_TEST.docx  1.771 MB  Uploaded Monday, August 29, 2016, 09:19
Attachment 2: TS-2016-08-24-11-45.rga  3.539 MB  Uploaded Monday, August 29, 2016, 09:20
Attachment 3: OMEGA_OM-DAQPRO-5300_29-Aug-16_09.47.01.dlp  2.687 MB  Uploaded Monday, August 29, 2016, 11:09
Attachment 4: 20160829_110707.jpg  1.972 MB  Uploaded Monday, August 29, 2016, 12:24  | Show | Hide all
Attachment 5: 20160829_110713.jpg  1.826 MB  Uploaded Monday, August 29, 2016, 12:24  | Show | Hide all
Attachment 6: 20160829_110716.jpg  1.647 MB  Uploaded Monday, August 29, 2016, 12:24  | Show | Hide all
Attachment 7: 20160829_110719.jpg  1.860 MB  Uploaded Monday, August 29, 2016, 12:24  | Hide | Hide all
20160829_110719.jpg
ELOG V2.9.2-2455