Monday, March 25, 2013, 16:50, Sebastian Raeder, , , , , , , Problems/Solutions, RFQ powersupplies removed - Anode PS still connected to ground
|
Friday, May 03, 2013, 14:32, Anders Mjos, , , , , , , Problems/Solutions, Cathode PS cable reconnected
|
|
Message ID: 297
Entry time: Friday, May 03, 2013, 14:32
In reply to: 288
|
Author: |
Anders Mjos |
Target/No.#: |
|
Source: |
|
Station: |
|
Module: |
|
Target Oven W.O#: |
|
Heat Shield W.O#: |
|
Status: |
Problems/Solutions |
Subject: |
Cathode PS cable reconnected |
|
|
Sebastian Raeder wrote: |
The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.
NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off
|
Friday, May 03, 2013
The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523
Tuesday, May 07, 2013
The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3
|
|
|