Entry  Monday, September 17, 2018, 11:39, John Wong, np-SiC#1, LP-SIS, , , 43044-1, , Ready, nano-SiC#1 Target description target_description.JPG

Monday, September 17, 2018, 11:32

See attachment for the target description.

Some notes about the target conditioning in Evap#2 (see elog ID#414):

TGHT at 500A, 8.4V, temp at 1600 C (4.2 kW)

TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)

TGHT at 450/7.31V, temp at 1500 C (3.28 kW)


 

Entry  Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description ZrC8.pngZrC_8_SEM.pdf

 

Tuesday, July 30, 2019, 15:50

See attachment for details


Thursday, August 01, 2019, 07:41

See attachment#2 for SEM - JW

 

 

 

Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  

Laura Lambert wrote:

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

 Monday, July 06, 2015, 12:10

This target did not pass the test-stand and will not be used for online (unless if it gets approved).  The target container is deformed.  An increase of voltage was observed during the test; perhaps it's a sign of the container being cracked?!  See Test-stand e-log#450 for more details.  

Another target is already prepared and being tested.  (Target Oven WO# 41177-2). 


 

Entry  Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx

Tuesday, July 07, 2015, 12:36 

Total no. discs = 422

Total packed length = 13.2 cm (measured after the sintering process) 

Note:  The theoretical length (ZrC + graphite foils) is 10.52cm    After the sintering process, the stack of discs expanded in length.  To avoid crushing the materials while inserting the endcaps, the discs are gentally packed to 13.2cm.

(see attachments for more details)


 

Entry  Monday, July 28, 2014, 15:57, John Wong, ZrC#6, LP-SIS, ITW, TM1, 40282-3, , Spent, ZrC target description  ZrC#6.JPG

 Monday, July 28, 2014, 15:52

See attachment#1 for ZrC target description. 

Target is currently undergoing the sintering process


 

Entry  Monday, February 20, 2012, 16:39, John Wong, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, , Spent, target ready for assembly 

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

    Reply  Wednesday, July 04, 2012, 11:32, Anders Mjos, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, 39069-3, Spent, target assembled UO2#3_Anode_End_Cap.xlsx

John Wong wrote:

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

Target assembled with new anode end cap.

See attachment for gap size and DocuShare for further information.

Entry  Friday, June 06, 2014, 14:09, John Wong, UCx#9, LP-SIS, , , 39165-9, , Ready, UCx#9 - Target description  UCx#9_target_description_1.JPG

 Friday, June 06, 2014, 14:08

See attachment for the target description


 

Entry  Wednesday, November 27, 2013, 17:56, John Wong, UCx#8, LP-IG-LIS, ITE, TM4, 39814-IV, , Spent, UCx#8 target description  UCx_8_specification.PNG

Wednesday, November 27, 2013, 17:49

UCx#8 target description - see attachment#1


 

Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG

Friday, August 30, 2013, 12:06

UCx#7 target specification, see attachment #1.

The target is assembled and going online soon.


Entry  Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description  UCx#6_specifications.PNG

 Thursday, May 30, 2013, 16:57

UCx#6 target specification, see attachment #1. 

The target is currently undergoing the final conditioning in the Evaporator#1.


 Wednesday, June 12, 2013, 17:10

Target is assembled and stored in the Ar glove box.

It's ready to go into the Hotcell.


 

Entry  Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description  UCx#5_specifications.PNG

Wednesday, August 29, 2012, 14:50

UCx#5 target description, see attachment#1

The target is currently undergoing the final conditioning in the Evaporator #1. 


 Wednesday, December 05, 2012, 15:46

This target was broken right before the end of the final run.  The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357

Looks like the protective layer (TaC coating) was worn out over the course of the run time. 

We need to improve the target coating so this can be prevented in the future.

More info about this later...


 

Entry  Tuesday, October 24, 2023, 11:30, Darwin Ortiz Rosales, UCx#44, LP-FEBIAD, , , 41790-7, , Ready, UCx#44_Description UCx#44_Description.png

Three Ta heatshields left installed on container.

Entry  Wednesday, July 26, 2023, 12:03, Darwin Ortiz Rosales, UCx#43, LP-SIS, , , 45447-11, , Ready, UCx#43_Description UCx#43_Description.png
 
Entry  Wednesday, July 26, 2023, 09:42, Darwin Ortiz Rosales, UCx#42, LP-SIS, , , 45220-1, , Ready, UCx#42_Description UCx#42_Description.png
 
Entry  Tuesday, November 15, 2022, 08:41, Darwin Ortiz Rosales, UCx#41, LP-SIS, , , 45220-13, , Ready,  UCx#41_Description.png
 
Entry  Tuesday, October 25, 2022, 13:10, Darwin Ortiz Rosales, UCx#40, LP-SIS, , , 45550-2, , Ready, UCx#40 Target Description UCx#40_Description.png

Tuesday, October 25, 2022, 13:10

Target in Glovebox

Entry  Friday, July 20, 2012, 11:39, John Wong, UCx#4, LP-SIS, ITW, TM1, 38634-9, 36833-4, Spent, UCx#4 target description UCx#4_specfications.PNG

Friday, July 20, 2012, 11:35

UCx#4 target description, see attachment#1

The target is assembled and stored in the Ar-glove box.  It will be transported to the South Hotcell on July 31, 2012.


 

Entry  Tuesday, August 09, 2022, 11:02, Darwin Ortiz Rosales, UCx#39, LP-IG-LIS, , , 42218-4, , Ready, UCx#39_Target_Description UCx#39_Description.png
 