ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
30
|
Tuesday, December 11, 2012, 15:44 |
Anders Mjos | SiC | HP-FEBIAD | ITW | TM4 | na | na (old style fittings) | Ready | Test target for the Conditioning Station |
The target has been used for operator training previously at the ISAC Test Stand.
- 9-pin connector was completed and grounded
- RH gripper arms added to the heat shield
Further documentation on DocuShare |
109
|
Monday, August 16, 2021, 11:02 |
John Wong | UCx#34 | LP-SIS | ITW | TM2 | 44691-5 | 44378-1 | Ready | Target description |
Monday, August 16, 2021, 11:01
See attachments for the target description and SEM images
|
Attachment 1: UCx#34_target_description.PNG
|
|
Attachment 2: UCx_34_SEM_Density_Measurements.pdf
|
|
104
|
Thursday, November 12, 2020, 11:32 |
Darwin Ortiz Rosales | UCx#31 | HP-SIS | ITE | TM4 | 44160 | 43822 | Ready | UCx#31-Target_description |
Target full name ITE-TM4-UC#31-P2N-SIS
|
Attachment 1: UCx31-target_description.png
|
|
89
|
Friday, May 31, 2019, 16:11 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | 42972-7 | Ready | Ta#58 Target desription |
Ta#58 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 14.16 g/cm3
Target length = 3.4 cm
Total Mass = 48.138 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 464 g
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
End caps installed (not yet expanded). No Ta heat shield added. |
Attachment 1: Ta#58_Loading_data.pdf
|
|
47
|
Thursday, September 25, 2014, 16:01 |
Laura Lambert | Ta#44 | HP-SIS | ITE | TM4 | 38817-9 | 40316-11 | Ready | Ta#44 target description |
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Target density = 16.69 g/cm3
Target length = 4.5cm
Total Mass (400 foils + Ta wire) = 47.49g
|
34
|
Wednesday, July 10, 2013, 18:41 |
John Wong | SiC#29 | HP-FEBIAD-CTL | ITE | TM4 | 38481-6 | 39956-4 | Spent | SiC#29 - Target description |
Wednesday, July 10, 2013, 18:32
SiC#29 HP-FEBIAD-CTL target description:
Total SiC foils = 510 discs
Total mass SiC + C_grv foils = 62 g (before sintering, expecting ~13% loss of organic mass after burnt off)
Average mass SiC/disc (without C_grv) = 0.0892 g
Average thickness SiC (without C_grv) = 0.21mm
No Rh foil and salt added for this run.
See attachment #1 for the density measurement.
Wednesday, July 10, 2013, 18:40
Target is currently in the Test-Stand. Once it's tested; it is ready to go online.
Happy Beaming!
|
Attachment 1: SiC#29_density_measurements_final.xlsx
|
40
|
Monday, March 31, 2014, 15:02 |
John Wong | TiC#4 | HP-SIS | | | 38817-8 | 39956-10 | Spent | Target Description |
Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils.
Total length = 11.7cm
Total green mass = 40.945g
(see attachment for more details)
|
Attachment 1: TiC#4_description.JPG
|
|
39
|
Monday, March 17, 2014, 16:15 |
John Wong | Ta#42 | LP-SIS | ITW | TM4 | 40282-1 | 39956-1 | Spent | Ta#42 Target description |
Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Target density = 16.69 g/cm3
Target length = 4.2cm
Total Mass (400 foils + Ta wire) = 45.899g
|
33
|
Thursday, May 30, 2013, 16:58 |
John Wong | UCx#6 | LP-SIS | | TM1 | 39165-6 | 39230-8 | Spent | UCx#6 - target description |
Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1.
The target is currently undergoing the final conditioning in the Evaporator#1.
Wednesday, June 12, 2013, 17:10
Target is assembled and stored in the Ar glove box.
It's ready to go into the Hotcell.
|
Attachment 1: UCx#6_specifications.PNG
|
|
35
|
Friday, August 30, 2013, 12:08 |
John Wong | UCx#7 | LP-SIS | ITW | TM1 | 38634-7 | 39230-4 | Spent | UCx#7 - target description |
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
|
Attachment 1: UCx#7_specifications.PNG
|
|
36
|
Friday, August 30, 2013, 14:45 |
John Wong | NiO#2 | HP-FEBIAD | | | 39530-6 | 39069-4 | Spent | NiO target description |
Friday, August 30, 2013, 14:38
NiO/Ni#2 Average
NiO+ Ni (g) 0.114
NiO - Ni foil (g) 0.066
NiO + Ni thickness (mm) 0.116
NiO - Ni thickness (mm) 0.104
Area (cm2) 2.212
NiO + Ni - organics (8.95%) (g) 0.104
NiO - Ni - organics (8.95%) (g) 0.060
NiO Density (g/cm3) 2.110
% Yield density 32%
# discs in target 530
Total target length (cm) 9.0
|
24
|
Wednesday, July 04, 2012, 11:32 |
Anders Mjos | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | 39069-3 | Spent | target assembled |
John Wong wrote: |
Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org).
Target finished the sintering process on Feb 20, 2011.
U(402 foils) mass = 35.689g
U(402 foils) thickness = 16.834 g/cm2
Target is stored in the Hotlab and ready for assembly.
|
Target assembled with new anode end cap.
See attachment for gap size and DocuShare for further information. |
Attachment 1: UO2#3_Anode_End_Cap.xlsx
|
21
|
Thursday, May 24, 2012, 11:04 |
John Wong | SiC#27 | HP-SIS | ITE | TM4 | 38817-3 | 39069-2 | Spent | HP-SIS SiC27 target description |
Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description:
Total SiC foils = 240 discs
Total SiC+ C-grv = 27.79g
Total length = 8.3cm
Average mass of SiC/disc (without C-grv) = 0.085g
Average thickness of SiC (without C-grv) = 0.24mm
No Rh foil added
Salt added = 10uL Li, 10uL Na
see attachment#1: SiC#27_density measurements
see link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8530
|
Attachment 1: SiC#27_specification.png
|
|
29
|
Thursday, October 11, 2012, 11:41 |
John Wong | NiO#1 | HP-FEBIAD | ITE | TM4 | 38481-7 | 39069-1/10(lid) | Spent | NiO target description |
(Should have posted this before my long vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
NiO/Ni #1 |
Average |
NiO + Ni (g) |
0.109 |
NiO - Ni foil (g) |
0.06 |
NiO + Ni thickness (mm) |
0.116 |
NiO - Ni Thickness (mm) |
0.091 |
Area (cm2) |
2.212 |
NiO + Ni - organics 8.95% (g) |
0.099 |
NiO - Ni - Organics (g) |
0.055 |
NiO Density (g/cm3) |
2.145 (32%) |
Target contains 500 NiO/Ni discs and is measured at 9.0 in length. |
13
|
Tuesday, August 09, 2011, 14:31 |
John Wong | UCx#2 | LP-SIS | ITW | TM1 | 38634-8 | 38633-5 | Spent | UCx#2 run is finished. |
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Total UC2/C foils = 245 discs
Total U/cm2 = 15.27g
Standard salts = 10uL Na, 10uL Li
Tuesday, August 09, 2011, 14:27:
Target came out from the glovebox and transported to the cold lab for assembly. During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead).
The target was leak checked and fine.
Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).
Tuesday, October 04, 2011, 10:21
UCx#2 run was finished last week.
Target was moved from ITW to south hot cell, and stored in a bucket under argon feed.
|
Attachment 1: broke_screwhead.jpg
|
|
Attachment 2: UCx#2.jpg
|
|
22
|
Friday, June 01, 2012, 11:43 |
John Wong | Ta#38 | LP-SIS | ITW | TM1 | 39165-2 | 38633-2 | Spent | Ta#38 target description |
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil thickness = 0.025mm
Target density = 16.69 g/cm3
Target area = 2.12cm2
Target length = 4.3cm
Total Mass (400 foils + Ta wire) = 42.8013g
See the link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8541
Friday, June 01, 2012, 11:36
The target is now in the test-stand, and by next week Tuesday, it should go in the Hotcell.
Monday, June 04, 2012, 16:56
The target was tested in the Test-stand. The EE was inspected and a small amount of deposit was discovered after the test (the same stuff was found on Ta#36), see attachment #1. The samples were collected and will be analyzed through SEM/EDX/XRD.
The EE and the common plate were cleaned with methanol and were assembled back.
The target is ready to go in the Hotcell tomorrow, June 05.
Monday, November 05, 2012, 16:42
The deposits on the EE and CC were analyzed using XRD
On the EE, it was mainly copper hydroxide nitrate, Cu2(OH)3(NO3). (see attachment #2)
On the CE, it was mainly tantalum, Ta. (see attachment #3)
|
Attachment 1: Ta_38_EE_deposit.JPG
|
|
Attachment 2: Ta#38_EE.PNG
|
|
Attachment 3: Ta#38_CE.PNG
|
|
4
|
Thursday, March 31, 2011, 15:38 |
John Wong | SiC#25 | HP-SIS | ITE | TM4 | 38481-1 | 38307-? | Spent | ITE-TM4-SiC#25-Hp-SIS |
Thu Mar 31 15:19:51 2011: SiC#25 was made sometime in December of 2010. It is now in the target module and ready to be conditioned.
Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand. However, there were enough 40Ca and 39K for tuning (See attachment#1 for the big mass scan). Once the P+ is back, the yields will be measured.
Fri Apr 29 15:30:26 2011: Low 27Al was ionized from the surface for some reason. However, after the green laser was shone into the extraction tube, more 27Al was produced. Then, the laser was turned off, the target continued to surface ionizing 27Al. There could be a blockage from the rhenium (Re) ionizer foil. Jens L. will investigate this further and do a test with the lasers and the rhenium foil.
|
Attachment 1: big_mass_scan.jpg
|
|
15
|
Friday, September 23, 2011, 17:03 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Spent | Run finished |
Friday, September 23, 2011, 16:54:
- Cu-gaskets used for leak checking target had a leak rate of about 10-8 10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
- The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.
- Target is now in the test stand and pumping down.
|
17
|
Monday, October 17, 2011, 14:45 |
John Wong | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Spent | Run finished |
Anders Mjos wrote: |
Friday, September 23, 2011, 16:54:
- Cu-gaskets used for leak checking target had a leak rate of about 10-8 10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
- The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.
- Target is now in the test stand and pumping down.
|
Monday, October 17, 2011, 14:41
After the test-stand, the extraction electrode showed some electric arcing mark, but no solid deposits were found. (see attachment#1: EE_after_teststand.jpg)
See attachment for the target specification. |
Attachment 1: EE_after_teststand.jpg
|
|
Attachment 2: SiC#26_specification.png
|
|
12
|
Wednesday, July 06, 2011, 14:32 |
John Wong | Ta#36 | LP-SIS | ITE | TM4 | 38634-2 | 38307-10 | Spent | Target ready, will go online on July 27 |
Ta-LP-SIS (w.o#38634-2)
Target consists of 400 Ta foils, 4.4 cm in length. Total mass + Ta wire = 40.87g.
Thursday, July 07, 2011, 15:43: Begin target assembly.
Friday, July 08, 2011, 14:24: assembly completed. Std stds added for test-stand: Li, Na, Rb, K, Cs.
Friday, July 15, 2011, 09:09: Target currently in test-stand. Will come out on Monday next week. Need to add std salts + Be.
Monday, July 18, 2011, 10:58: Target removed from test-stand. Std salts added (Li, Na, Rb, K, Cs) & Be (as requested by Jens). Maico D.V will do a final inspection on the target before it goes into the hotcell
|