Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 7  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject
  30   Tuesday, December 11, 2012, 15:44 Anders MjosSiCHP-FEBIADITWTM4nana (old style fittings)ReadyTest target for the Conditioning Station

 The target has been used for operator training previously at the ISAC Test Stand.

  • 9-pin connector was completed and grounded
  • RH gripper arms added to the heat shield

Further documentation on DocuShare

  109   Monday, August 16, 2021, 11:02 John WongUCx#34LP-SISITWTM244691-544378-1ReadyTarget description

Monday, August 16, 2021, 11:01

See attachments for the target description and SEM images


 

Attachment 1: UCx#34_target_description.PNG
UCx#34_target_description.PNG
Attachment 2: UCx_34_SEM_Density_Measurements.pdf
UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf UCx_34_SEM_Density_Measurements.pdf
  104   Thursday, November 12, 2020, 11:32 Darwin Ortiz RosalesUCx#31HP-SISITETM44416043822ReadyUCx#31-Target_description

 Target full name ITE-TM4-UC#31-P2N-SIS

 

 

Attachment 1: UCx31-target_description.png
UCx31-target_description.png
  89   Friday, May 31, 2019, 16:11 Aaron SchmidtTa#58LP-SISITETM243044-442972-7ReadyTa#58 Target desription

 Ta#58 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density =  14.16 g/cm3

Target length = 3.4 cm

Total Mass =  48.138 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven=  464 g

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

End caps installed (not yet expanded). No Ta heat shield added.

Attachment 1: Ta#58_Loading_data.pdf
Ta#58_Loading_data.pdf
  47   Thursday, September 25, 2014, 16:01 Laura LambertTa#44HP-SISITETM438817-940316-11ReadyTa#44 target description

Thursday, September 25, 2014, 15:59

Ta#44 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.5cm

Total Mass (400 foils + Ta wire) = 47.49g


 

  34   Wednesday, July 10, 2013, 18:41 John WongSiC#29HP-FEBIAD-CTLITETM438481-639956-4SpentSiC#29 - Target description

Wednesday, July 10, 2013, 18:32 

SiC#29 HP-FEBIAD-CTL target description: 

Total SiC foils = 510 discs 

Total mass SiC + C_grv foils = 62 g (before sintering, expecting ~13% loss of organic mass after burnt off) 

Average mass SiC/disc (without C_grv) = 0.0892 g

Average thickness SiC (without C_grv) = 0.21mm 

No Rh foil and salt added for this run. 

See attachment #1 for the density measurement.  


 Wednesday, July 10, 2013, 18:40

Target is currently in the Test-Stand.  Once it's tested; it is ready to go online.  

Happy Beaming! 


 

Attachment 1: SiC#29_density_measurements_final.xlsx
  40   Monday, March 31, 2014, 15:02 John WongTiC#4HP-SIS  38817-839956-10SpentTarget Description

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

Attachment 1: TiC#4_description.JPG
TiC#4_description.JPG
  39   Monday, March 17, 2014, 16:15 John WongTa#42LP-SISITWTM440282-139956-1SpentTa#42 Target description

Monday, March 17, 2014, 16:14

Ta#42 LP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.2cm

Total Mass (400 foils + Ta wire) = 45.899g


 

  33   Thursday, May 30, 2013, 16:58 John WongUCx#6LP-SIS TM139165-639230-8SpentUCx#6 - target description

 Thursday, May 30, 2013, 16:57

UCx#6 target specification, see attachment #1. 

The target is currently undergoing the final conditioning in the Evaporator#1.


 Wednesday, June 12, 2013, 17:10

Target is assembled and stored in the Ar glove box.

It's ready to go into the Hotcell.


 

Attachment 1: UCx#6_specifications.PNG
UCx#6_specifications.PNG
  35   Friday, August 30, 2013, 12:08 John WongUCx#7LP-SISITWTM138634-739230-4SpentUCx#7 - target description

Friday, August 30, 2013, 12:06

UCx#7 target specification, see attachment #1.

The target is assembled and going online soon.


Attachment 1: UCx#7_specifications.PNG
UCx#7_specifications.PNG
  36   Friday, August 30, 2013, 14:45 John WongNiO#2HP-FEBIAD  39530-639069-4SpentNiO target description

Friday, August 30, 2013, 14:38 

NiO/Ni#2                                             Average

NiO+ Ni (g)                                          0.114

NiO - Ni foil (g)                                    0.066

NiO + Ni thickness (mm)                  0.116

NiO - Ni thickness (mm)                   0.104

Area (cm2)                                           2.212

NiO + Ni - organics (8.95%) (g)       0.104

NiO - Ni - organics (8.95%) (g)        0.060

NiO Density (g/cm3)                          2.110

% Yield density                                   32%

# discs in target                                  530

Total target length (cm)                      9.0


 

  24   Wednesday, July 04, 2012, 11:32 Anders MjosUO2/Nb #1LP-FEBIADITETM438481-939069-3Spenttarget assembled

John Wong wrote:

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

Target assembled with new anode end cap.

See attachment for gap size and DocuShare for further information.

Attachment 1: UO2#3_Anode_End_Cap.xlsx
  21   Thursday, May 24, 2012, 11:04 John WongSiC#27HP-SISITETM438817-339069-2SpentHP-SIS SiC27 target description

 Thursday, May 24, 2012, 10:34

SiC#27- HPSIS target description: 

Total SiC foils = 240 discs

Total SiC+ C-grv = 27.79g

Total length = 8.3cm 

Average mass of SiC/disc (without C-grv) = 0.085g 

Average thickness of SiC (without C-grv) = 0.24mm  

No Rh foil added

Salt added = 10uL Li, 10uL Na 

see attachment#1: SiC#27_density measurements

see link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8530


 

Attachment 1: SiC#27_specification.png
SiC#27_specification.png
  29   Thursday, October 11, 2012, 11:41 John WongNiO#1HP-FEBIADITETM438481-739069-1/10(lid)SpentNiO target description

(Should have posted this before my long vacation... Anyway, it's for documentation)

Thursday, October 11, 2012, 11:38

 

NiO/Ni #1 Average
NiO +  Ni  (g) 0.109
NiO - Ni foil (g) 0.06
NiO + Ni  thickness (mm) 0.116
NiO - Ni Thickness (mm) 0.091
Area (cm2) 2.212
NiO + Ni - organics 8.95% (g) 0.099
NiO - Ni - Organics (g) 0.055
NiO Density (g/cm3) 2.145 (32%)

 

Target contains 500 NiO/Ni discs and is measured at 9.0 in length.

  13   Tuesday, August 09, 2011, 14:31 John WongUCx#2LP-SISITWTM138634-838633-5SpentUCx#2 run is finished.

UCx#2 Spec:

Target wrapped with 3 Ta-heat shields

Target length = 11.2cm

Total UC2/C foils = 245 discs

Total U/cm2 = 15.27g

Standard salts = 10uL Na, 10uL Li


Tuesday, August 09, 2011, 14:27: 

Target came out from the glovebox and transported to the cold lab for assembly.  During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead). 

The target was leak checked and fine. 

Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).


 Tuesday, October 04, 2011, 10:21

UCx#2 run was finished last week.  

Target was moved from ITW to south hot cell, and stored in a bucket under argon feed. 


 

Attachment 1: broke_screwhead.jpg
broke_screwhead.jpg
Attachment 2: UCx#2.jpg
UCx#2.jpg
  22   Friday, June 01, 2012, 11:43 John WongTa#38LP-SISITWTM139165-238633-2SpentTa#38 target description

Ta#38 LP-SIS target description:

Total Ta foils = 400

Foil thickness = 0.025mm

Target density = 16.69 g/cm3

Target area = 2.12cm2

Target length = 4.3cm

Total Mass (400 foils + Ta wire) = 42.8013g

See the link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8541


Friday, June 01, 2012, 11:36

The target is now in the test-stand, and by next week Tuesday, it should go in the Hotcell.

 


 Monday, June 04, 2012, 16:56

The target was tested in the Test-stand.  The EE was inspected and a small amount of deposit was discovered after the test (the same stuff was found on Ta#36),  see attachment #1.  The samples were collected and will be analyzed through SEM/EDX/XRD.

The EE and the common plate were cleaned with methanol and were assembled back.

The target is ready to go in the Hotcell tomorrow, June 05.


 Monday, November 05, 2012, 16:42

The deposits on the EE and CC were analyzed using XRD

On the EE, it was mainly copper hydroxide nitrate, Cu2(OH)3(NO3). (see attachment #2)

On the CE, it was mainly tantalum, Ta. (see attachment #3)


 

Attachment 1: Ta_38_EE_deposit.JPG
Ta_38_EE_deposit.JPG
Attachment 2: Ta#38_EE.PNG
Ta#38_EE.PNG
Attachment 3: Ta#38_CE.PNG
Ta#38_CE.PNG
  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS

Thu Mar 31 15:19:51 2011:  SiC#25 was made sometime in December of 2010.  It is now in the target module and ready to be conditioned. 

Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand.  However,  there were enough 40Ca and 39K  for tuning (See attachment#1 for the big mass scan).  Once the P+ is back, the yields will be measured.

Fri Apr 29 15:30:26 2011:  Low 27Al was ionized from the surface for some reason.  However, after the green laser was shone into the extraction tube, more 27Al was produced.  Then, the laser was turned off, the target continued to surface ionizing 27Al.  There could be a blockage from the rhenium (Re) ionizer foil.  Jens L. will investigate this further and do a test with the lasers and the rhenium foil.

 

 


Attachment 1: big_mass_scan.jpg
big_mass_scan.jpg
  15   Friday, September 23, 2011, 17:03 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

Friday, September 23, 2011, 16:54:

  • Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
  • The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.

 

  • Target is now in the test stand and pumping down.
  17   Monday, October 17, 2011, 14:45 John WongSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

Anders Mjos wrote:

Friday, September 23, 2011, 16:54:

  • Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
  • The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.

 

  • Target is now in the test stand and pumping down.

 Monday, October 17, 2011, 14:41

After the test-stand, the extraction electrode showed some electric arcing mark, but no solid deposits were found.  (see attachment#1: EE_after_teststand.jpg)

See attachment for the target specification.  

Attachment 1: EE_after_teststand.jpg
EE_after_teststand.jpg
Attachment 2: SiC#26_specification.png
SiC#26_specification.png
  12   Wednesday, July 06, 2011, 14:32 John WongTa#36LP-SISITETM438634-238307-10SpentTarget ready, will go online on July 27

Ta-LP-SIS (w.o#38634-2)

Target consists of 400 Ta foils, 4.4 cm in length.  Total mass + Ta wire = 40.87g.

Thursday, July 07, 2011, 15:43:  Begin target assembly. 

Friday, July 08, 2011, 14:24: assembly completed.  Std stds added for test-stand: Li, Na, Rb, K, Cs.

Friday, July 15, 2011, 09:09:  Target currently in test-stand.  Will come out on Monday next week.  Need to add std salts + Be. 

Monday, July 18, 2011, 10:58:  Target removed from test-stand.  Std salts added (Li, Na, Rb, K, Cs) & Be (as requested by Jens).  Maico D.V will do a final inspection on the target before it goes into the hotcell

 

ELOG V2.9.2-2455