Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 7  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  30   Tuesday, December 11, 2012, 15:44 Anders MjosSiCHP-FEBIADITWTM4nana (old style fittings)ReadyTest target for the Conditioning Station The target has been used for operator
training previously at the ISAC Test Stand.

    9-pin connector was completed
  
  109   Monday, August 16, 2021, 11:02 John WongUCx#34LP-SISITWTM244691-544378-1ReadyTarget description Monday, August 16, 2021, 11:01
See attachments for the target description
and SEM images
 UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf 
  104   Thursday, November 12, 2020, 11:32 Darwin Ortiz RosalesUCx#31HP-SISITETM44416043822ReadyUCx#31-Target_description Target full name ITE-TM4-UC#  UCx31-target_description.png 
  89   Friday, May 31, 2019, 16:11 Aaron SchmidtTa#58LP-SISITETM243044-442972-7ReadyTa#58 Target desription Ta#58 LP-SIS  Ta#58_Loading_data.pdf 
  47   Thursday, September 25, 2014, 16:01 Laura LambertTa#44HP-SISITETM438817-940316-11ReadyTa#44 target descriptionThursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
  
  34   Wednesday, July 10, 2013, 18:41 John WongSiC#29HP-FEBIAD-CTLITETM438481-639956-4SpentSiC#29 - Target descriptionWednesday, July 10, 2013, 18:32 
SiC#29 HP-FEBIAD-CTL target description: 
Total SiC foils = 510 discs 
 SiC#29_density_measurements_final.xlsx 
  40   Monday, March 31, 2014, 15:02 John WongTiC#4HP-SIS  38817-839956-10SpentTarget Description  Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC
+ graphite foils. 
 TiC#4_description.JPG 
  39   Monday, March 17, 2014, 16:15 John WongTa#42LP-SISITWTM440282-139956-1SpentTa#42 Target description Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
  
  33   Thursday, May 30, 2013, 16:58 John WongUCx#6LP-SIS TM139165-639230-8SpentUCx#6 - target description  Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment
#1. 
 UCx#6_specifications.PNG 
  35   Friday, August 30, 2013, 12:08 John WongUCx#7LP-SISITWTM138634-739230-4SpentUCx#7 - target descriptionFriday, August 30, 2013, 12:06
UCx#7 target specification, see attachment
#1.
 UCx#7_specifications.PNG 
  36   Friday, August 30, 2013, 14:45 John WongNiO#2HP-FEBIAD  39530-639069-4SpentNiO target descriptionFriday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
  
  24   Wednesday, July 04, 2012, 11:32 Anders MjosUO2/Nb #1LP-FEBIADITETM438481-939069-3Spenttarget assembled

    

       
            
 UO2#3_Anode_End_Cap.xlsx 
  21   Thursday, May 24, 2012, 11:04 John WongSiC#27HP-SISITETM438817-339069-2SpentHP-SIS SiC27 target description Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description: 
Total SiC foils = 240 discs
 SiC#27_specification.png 
  29   Thursday, October 11, 2012, 11:41 John WongNiO#1HP-FEBIADITETM438481-739069-1/10(lid)SpentNiO target description (Should have posted this before my long
vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
  
  13   Tuesday, August 09, 2011, 14:31 John WongUCx#2LP-SISITWTM138634-838633-5SpentUCx#2 run is finished.UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
 broke_screwhead.jpgUCx#2.jpg 
  22   Friday, June 01, 2012, 11:43 John WongTa#38LP-SISITWTM139165-238633-2SpentTa#38 target descriptionTa#38 LP-SIS target description: 
Total Ta foils = 400
Foil thickness = 0.025mm
 Ta_38_EE_deposit.JPGTa#38_EE.PNGTa#38_CE.PNG 
  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS Thu Mar 31 15:19:51 2011:  SiC#25
was made sometime in December of 2010. 
It is now in the target module and ready
 big_mass_scan.jpg 
  15   Friday, September 23, 2011, 17:03 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8SpentRun finishedFriday, September 23, 2011, 16:54:

    Cu-gaskets used for leak
checking target had a leak rate of about 
  
  17   Monday, October 17, 2011, 14:45 John WongSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

    

       
            
 EE_after_teststand.jpgSiC#26_specification.png 
  12   Wednesday, July 06, 2011, 14:32 John WongTa#36LP-SISITETM438634-238307-10SpentTarget ready, will go online on July 27Ta-LP-SIS (w.o#38634-2)
Target  consists of 400 Ta foils,
4.4 cm in length.  Total mass + Ta wire
  
ELOG V2.9.2-2455