Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 7  Not logged in ELOG logo
Entry  Tuesday, March 05, 2024, 10:15, Aaron Schmidt, Ta, LP-SIS, , , 45447-15, , Ready, Ta# (March stock) Target Description. 
Tuesday, March 05, 2024, 10:12: Ta#
(Stock - Loaded today) LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Tuesday, October 24, 2023, 11:30, Darwin Ortiz Rosales, UCx#44, LP-FEBIAD, , , 41790-7, , Ready, UCx#44_Description UCx#44_Description.png
Three Ta heatshields left installed on container.
Entry  Thursday, October 05, 2023, 12:48, Aaron Schmidt, Ta#67, LP-SIS, , , 45220-3, , , Ta#67 Target description. (Spare) 
Ta#67 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. 
Entry  Wednesday, September 20, 2023, 14:25, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, , In progress, Ta#66 Target description. Ta#66_Target_Loading_Data.pdf
Ta#66 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. 
Entry  Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description Nb#11_Target_Loading_Data.pdf
Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Wednesday, July 26, 2023, 12:03, Darwin Ortiz Rosales, UCx#43, LP-SIS, , , 45447-11, , Ready, UCx#43_Description UCx#43_Description.png
 
Entry  Wednesday, July 26, 2023, 09:42, Darwin Ortiz Rosales, UCx#42, LP-SIS, , , 45220-1, , Ready, UCx#42_Description UCx#42_Description.png
 
Entry  Friday, June 23, 2023, 09:02, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, , , Nb#10 target description. 
 Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Friday, May 26, 2023, 11:53, Darwin Ortiz Rosales, SiC#45, HP-SIS, , , 44692-3, , Ready,  SiC#45.png
 
Entry  Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description TiC_#6.png
 
Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf
 Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013"
Entry  Monday, March 06, 2023, 13:38, Aaron Schmidt, Ta#65, LP-SIS, , , 45220-7, , Ready, Ta#65 Target Description. 
 Monday, March 06, 2023, 13:38:
Ta#65 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Monday, February 06, 2023, 10:02, Darwin Ortiz Rosales, C#6, , , , 45220-6, , Ready, Target C#6 Description C#6_Description.png
 
Entry  Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, C#5, , , , 44691-13, , Ready, Target C#5 Description C#5_Description.png
Graphite target
Entry  Tuesday, November 15, 2022, 08:41, Darwin Ortiz Rosales, UCx#41, LP-SIS, , , 45220-13, , Ready,  UCx#41_Description.png
 
Entry  Tuesday, October 25, 2022, 13:10, Darwin Ortiz Rosales, UCx#40, LP-SIS, , , 45550-2, , Ready, UCx#40 Target Description UCx#40_Description.png
Tuesday, October 25, 2022, 13:10 
Target in Glovebox
Entry  Thursday, September 22, 2022, 13:18, Darwin Ortiz Rosales, C#4, LP-SIS, , , 44691-3, , Ready, Target C#4 Description C#4_Target_Description.png
Thursday, September 22, 2022, 13:17
Entry  Tuesday, August 16, 2022, 09:48, Darwin Ortiz Rosales, SiC#44, HP-FEBIAD, , , 37978-1, , Ready, Target SiC#44 Description 
Tuesday, August 16, 2022, 09:47 
Entry  Tuesday, August 09, 2022, 11:02, Darwin Ortiz Rosales, UCx#39, LP-IG-LIS, , , 42218-4, , Ready, UCx#39_Target_Description UCx#39_Description.png
 
ELOG V2.9.2-2455