Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  7   Friday, June 03, 2011, 09:16 John WongTa#37LP-SISITWTM138634-536833-7SpentTarget is done Fri Jun  3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk),
 EE.JPGEE-CuO.jpg 
  9   Friday, June 17, 2011, 11:58 John WongUCx (flakes)LP-SIS    Problems/SolutionsMaking UC2 flakes (stock# 2011_A & _B)Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization
(Stock# 2011_A):   
 8x 
  12   Wednesday, July 06, 2011, 14:32 John WongTa#36LP-SISITETM438634-238307-10SpentTarget ready, will go online on July 27Ta-LP-SIS (w.o#38634-2)
Target  consists of 400 Ta foils,
4.4 cm in length.  Total mass + Ta wire
  
  13   Tuesday, August 09, 2011, 14:31 John WongUCx#2LP-SISITWTM138634-838633-5SpentUCx#2 run is finished.UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
 broke_screwhead.jpgUCx#2.jpg 
  14   Tuesday, September 06, 2011, 13:19 John WongTaC#1LP-SISITETM138634-6 SpentTarget is doneTuesday, September 06, 2011, 13:14: 
Average mass = 0.206g
Average Thickness = 0.0189 cm
 TaC_density_measurements.xls 
  16   Tuesday, September 27, 2011, 10:36 Anders MjosTaC#1LP-SISITETM138634-636833-6Problems/SolutionsMaterial deposited on Extraction Electrode after Test Stand

    

       
            
 Deposited_material.pdf 
  18   Wednesday, November 16, 2011, 14:08 John WongUCx#3LP-SISITWTM138634-1036833-3SpentUCx#3 ready to go online Wednesday, November 16, 2011, 13:51
UCx#3 descriptions: 
Target oven wrapped with 3-Ta heat
 UCx#3_assembly.jpg 
  19   Monday, February 13, 2012, 16:00 John WongNb#6LP-SISITWTM138634-436833-1SpentNb#5 ready in the Conditioning Station 

Monday, February 13, 2012,
16:00 
  
  22   Friday, June 01, 2012, 11:43 John WongTa#38LP-SISITWTM139165-238633-2SpentTa#38 target descriptionTa#38 LP-SIS target description: 
Total Ta foils = 400
Foil thickness = 0.025mm
 Ta_38_EE_deposit.JPGTa#38_EE.PNGTa#38_CE.PNG 
  23   Monday, June 11, 2012, 13:46 John WongNb#6LP-SISITWTM138634-436833-1SpentNb#5 run finished

    

       
            
  
  25   Friday, July 20, 2012, 11:39 John WongUCx#4LP-SISITWTM138634-936833-4SpentUCx#4 target descriptionFriday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored
 UCx#4_specfications.PNG 
  27   Wednesday, August 29, 2012, 14:52 John WongUCx#5LP-SISITWTM439165-5 FailedUCx#5 target description Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing
 UCx#5_specifications.PNG 
  28   Wednesday, September 12, 2012, 01:53 John WongNb#7LP-SIS  39165-6 SpentNb#7 target description Wednesday, September 12, 2012, 02:10
Nb#7 target description: 
Total Nb foils = 400 discs
 Nb#7_target_description.jpg 
  31   Tuesday, March 19, 2013, 13:32 John WongSiC#28-RFQLP-SIS TM4LP-RFQ (NEW) SpentSiC#28-RFQ target description Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description: 
Total SiC foils = 325 discs
 SiC#28_RFQ_density_measurements.xlsx 
  32   Thursday, April 11, 2013, 14:30 John WongTa#39LP-SISITWTM139165-7 SpentTa#39 target descriptionTa#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
  
  33   Thursday, May 30, 2013, 16:58 John WongUCx#6LP-SIS TM139165-639230-8SpentUCx#6 - target description  Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment
#1. 
 UCx#6_specifications.PNG 
  35   Friday, August 30, 2013, 12:08 John WongUCx#7LP-SISITWTM138634-739230-4SpentUCx#7 - target descriptionFriday, August 30, 2013, 12:06
UCx#7 target specification, see attachment
#1.
 UCx#7_specifications.PNG 
  39   Monday, March 17, 2014, 16:15 John WongTa#42LP-SISITWTM440282-139956-1SpentTa#42 Target description Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
  
  42   Friday, June 06, 2014, 14:09 John WongUCx#9LP-SIS  39165-9 ReadyUCx#9 - Target description  Friday, June 06, 2014, 14:08
See attachment for the target description

 
 UCx#9_target_description_1.JPG 
  43   Tuesday, July 15, 2014, 10:54 Laura LambertTa # 43LP-SISITWTM140282-2 ReadyTa # 43 Target Description Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description:
  
ELOG V2.9.2-2455