|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
|
85
|
Monday, September 17, 2018, 11:39 |
John Wong | np-SiC#1 | LP-SIS | | | 43044-1 | | Ready | nano-SiC#1 Target description |
Monday, September 17, 2018, 11:32
See attachment for the target description.
Some notes about the target conditioning in Evap#2 (see elog ID#414):
TGHT at 500A, 8.4V, temp at 1600 C (4.2 kW)
TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)
TGHT at 450/7.31V, temp at 1500 C (3.28 kW)
|
Attachment 1: target_description.JPG
|
|
|
91
|
Tuesday, July 30, 2019, 15:52 |
Darwin Ortiz Rosales | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | | Ready | Target description |
Tuesday, July 30, 2019, 15:50
See attachment for details
Thursday, August 01, 2019, 07:41
See attachment#2 for SEM - JW
|
Attachment 1: ZrC8.png
|
|
Attachment 2: ZrC_8_SEM.pdf
|
|
|
52
|
Wednesday, June 03, 2015, 10:55 |
Laura Lambert | ZrC#7 | LP-SIS | ITW | TM2 | 41177-1 | | Ready | ZrC#7 target description |
Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
|
Attachment 1: target_production_elog_ZrC#7.JPG
|
|
Attachment 2: ZrC#7_final_density.xlsx
|
|
53
|
Monday, July 06, 2015, 12:18 |
John Wong | ZrC#7 | LP-SIS | ITW | TM2 | 41177-1 | | Failed | ZrC#7 target description |
Laura Lambert wrote: |
Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
|
Monday, July 06, 2015, 12:10
This target did not pass the test-stand and will not be used for online (unless if it gets approved). The target container is deformed. An increase of voltage was observed during the test; perhaps it's a sign of the container being cracked?! See Test-stand e-log#450 for more details.
Another target is already prepared and being tested. (Target Oven WO# 41177-2).
|
|
54
|
Tuesday, July 07, 2015, 13:00 |
John Wong | ZrC#7 | LP-SIS | ITW | TM2 | 41177-2 | | Ready | ZrC#7 (backup1) target description |
Tuesday, July 07, 2015, 12:36
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process)
Note: The theoretical length (ZrC + graphite foils) is 10.52cm After the sintering process, the stack of discs expanded in length. To avoid crushing the materials while inserting the endcaps, the discs are gentally packed to 13.2cm.
(see attachments for more details)
|
Attachment 1: ZrC#7_backup.PNG
|
|
Attachment 2: ZrC_specification_(backup#1_WO#41177-2).xlsx
|
|
45
|
Monday, July 28, 2014, 15:57 |
John Wong | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | | Spent | ZrC target description |
Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description.
Target is currently undergoing the sintering process
|
Attachment 1: ZrC#6.JPG
|
|
|
20
|
Monday, February 20, 2012, 16:39 |
John Wong | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | | Spent | target ready for assembly |
Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org).
Target finished the sintering process on Feb 20, 2011.
U(402 foils) mass = 35.689g
U(402 foils) thickness = 16.834 g/cm2
Target is stored in the Hotlab and ready for assembly.
|
|
24
|
Wednesday, July 04, 2012, 11:32 |
Anders Mjos | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | 39069-3 | Spent | target assembled |
John Wong wrote: |
Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org).
Target finished the sintering process on Feb 20, 2011.
U(402 foils) mass = 35.689g
U(402 foils) thickness = 16.834 g/cm2
Target is stored in the Hotlab and ready for assembly.
|
Target assembled with new anode end cap.
See attachment for gap size and DocuShare for further information. |
Attachment 1: UO2#3_Anode_End_Cap.xlsx
|
|
42
|
Friday, June 06, 2014, 14:09 |
John Wong | UCx#9 | LP-SIS | | | 39165-9 | | Ready | UCx#9 - Target description |
Friday, June 06, 2014, 14:08
See attachment for the target description
|
Attachment 1: UCx#9_target_description_1.JPG
|
|
|
38
|
Wednesday, November 27, 2013, 17:56 |
John Wong | UCx#8 | LP-IG-LIS | ITE | TM4 | 39814-IV | | Spent | UCx#8 target description |
Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1
|
Attachment 1: UCx_8_specification.PNG
|
|
|
35
|
Friday, August 30, 2013, 12:08 |
John Wong | UCx#7 | LP-SIS | ITW | TM1 | 38634-7 | 39230-4 | Spent | UCx#7 - target description |
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
|
Attachment 1: UCx#7_specifications.PNG
|
|
|
33
|
Thursday, May 30, 2013, 16:58 |
John Wong | UCx#6 | LP-SIS | | TM1 | 39165-6 | 39230-8 | Spent | UCx#6 - target description |
Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1.
The target is currently undergoing the final conditioning in the Evaporator#1.
Wednesday, June 12, 2013, 17:10
Target is assembled and stored in the Ar glove box.
It's ready to go into the Hotcell.
|
Attachment 1: UCx#6_specifications.PNG
|
|
|
27
|
Wednesday, August 29, 2012, 14:52 |
John Wong | UCx#5 | LP-SIS | ITW | TM4 | 39165-5 | | Failed | UCx#5 target description |
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1.
Wednesday, December 05, 2012, 15:46
This target was broken right before the end of the final run. The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357
Looks like the protective layer (TaC coating) was worn out over the course of the run time.
We need to improve the target coating so this can be prevented in the future.
More info about this later...
|
Attachment 1: UCx#5_specifications.PNG
|
|
|
140
|
Wednesday, May 22, 2024, 22:32 |
Darwin Ortiz Rosales | UCx#45 | LP-SIS | | | 45220-9 | | Ready | UCx#45_Description |
|
Attachment 1: UCx#45_Description.png
|
|
|
138
|
Tuesday, October 24, 2023, 11:30 |
Darwin Ortiz Rosales | UCx#44 | LP-FEBIAD | | | 41790-7 | | Ready | UCx#44_Description |
Three Ta heatshields left installed on container. |
Attachment 1: UCx#44_Description.png
|
|
|
134
|
Wednesday, July 26, 2023, 12:03 |
Darwin Ortiz Rosales | UCx#43 | LP-SIS | | | 45447-11 | | Ready | UCx#43_Description |
|
Attachment 1: UCx#43_Description.png
|
|
|
133
|
Wednesday, July 26, 2023, 09:42 |
Darwin Ortiz Rosales | UCx#42 | LP-SIS | | | 45220-1 | | Ready | UCx#42_Description |
|
Attachment 1: UCx#42_Description.png
|
|
|
124
|
Tuesday, November 15, 2022, 08:41 |
Darwin Ortiz Rosales | UCx#41 | LP-SIS | | | 45220-13 | | Ready | |
|
Attachment 1: UCx#41_Description.png
|
|
|
123
|
Tuesday, October 25, 2022, 13:10 |
Darwin Ortiz Rosales | UCx#40 | LP-SIS | | | 45550-2 | | Ready | UCx#40 Target Description |
Tuesday, October 25, 2022, 13:10
Target in Glovebox |
Attachment 1: UCx#40_Description.png
|
|
|
25
|
Friday, July 20, 2012, 11:39 |
John Wong | UCx#4 | LP-SIS | ITW | TM1 | 38634-9 | 36833-4 | Spent | UCx#4 target description |
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box. It will be transported to the South Hotcell on July 31, 2012.
|
Attachment 1: UCx#4_specfications.PNG
|
|