Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 8  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  20   Monday, February 20, 2012, 16:39 John WongUO2/Nb #1LP-FEBIADITETM438481-9 Spenttarget ready for assembly

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

  24   Wednesday, July 04, 2012, 11:32 Anders MjosUO2/Nb #1LP-FEBIADITETM438481-939069-3Spenttarget assembled

John Wong wrote:

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

Target assembled with new anode end cap.

See attachment for gap size and DocuShare for further information.

Attachment 1: UO2#3_Anode_End_Cap.xlsx
  85   Monday, September 17, 2018, 11:39 John Wongnp-SiC#1LP-SIS  43044-1 Readynano-SiC#1 Target description

Monday, September 17, 2018, 11:32

See attachment for the target description.

Some notes about the target conditioning in Evap#2 (see elog ID#414):

TGHT at 500A, 8.4V, temp at 1600 C (4.2 kW)

TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)

TGHT at 450/7.31V, temp at 1500 C (3.28 kW)


 

Attachment 1: target_description.JPG
target_description.JPG
  52   Wednesday, June 03, 2015, 10:55 Laura LambertZrC#7LP-SISITWTM241177-1 ReadyZrC#7 target description

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

Attachment 1: target_production_elog_ZrC#7.JPG
target_production_elog_ZrC#7.JPG
Attachment 2: ZrC#7_final_density.xlsx
  53   Monday, July 06, 2015, 12:18 John WongZrC#7LP-SISITWTM241177-1 FailedZrC#7 target description

Laura Lambert wrote:

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

 Monday, July 06, 2015, 12:10

This target did not pass the test-stand and will not be used for online (unless if it gets approved).  The target container is deformed.  An increase of voltage was observed during the test; perhaps it's a sign of the container being cracked?!  See Test-stand e-log#450 for more details.  

Another target is already prepared and being tested.  (Target Oven WO# 41177-2). 


 

  54   Tuesday, July 07, 2015, 13:00 John WongZrC#7LP-SISITWTM241177-2 ReadyZrC#7 (backup1) target description

Tuesday, July 07, 2015, 12:36 

Total no. discs = 422

Total packed length = 13.2 cm (measured after the sintering process) 

Note:  The theoretical length (ZrC + graphite foils) is 10.52cm    After the sintering process, the stack of discs expanded in length.  To avoid crushing the materials while inserting the endcaps, the discs are gentally packed to 13.2cm.

(see attachments for more details)


 

Attachment 1: ZrC#7_backup.PNG
ZrC#7_backup.PNG
Attachment 2: ZrC_specification_(backup#1_WO#41177-2).xlsx
  45   Monday, July 28, 2014, 15:57 John WongZrC#6LP-SISITWTM140282-3 SpentZrC target description

 Monday, July 28, 2014, 15:52

See attachment#1 for ZrC target description. 

Target is currently undergoing the sintering process


 

Attachment 1: ZrC#6.JPG
ZrC#6.JPG
  105   Tuesday, March 16, 2021, 17:05 Luca EgoritiITE-TM4-UC#32-P2N-SISHP-SISITETM4--In progressUO2 discs cutting

This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries. A total of 49 annular discs were cut and loaded into the P2N graphite container.

The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.

#discs = 49

Average disc thickness = 0.453mm

Empty cartridge weight = 9.42 g

Full cartridge weight = 39.86 g

UO2+C weight = 30.44 g

The unused material plus the cutting scrap were left in a zip lock bag on a shelf in the right hand side of the fume hood. The center scraps and the loaded target were placed in a plastic tray on the top shelf. The used tools and scales were left on the right of the working area, the napkins on the bottom were put into the garbage bag (inside the fume hood) and replaced, while the only napkin left is the one with the target information (recorded in attached picture).

Attachment 1: UC32-P2N_material_info.jpg
UC32-P2N_material_info.jpg
Attachment 2: Fume_hood.jpg
Fume_hood.jpg
  95   Monday, October 21, 2019, 12:38 Darwin Ortiz RosalesUCx#29LP-SIS  44062-6  ReadyUCx29-target_description
Attachment 1: UCx#29.PNG
UCx#29.PNG
  42   Friday, June 06, 2014, 14:09 John WongUCx#9LP-SIS  39165-9 ReadyUCx#9 - Target description

 Friday, June 06, 2014, 14:08

See attachment for the target description


 

Attachment 1: UCx#9_target_description_1.JPG
UCx#9_target_description_1.JPG
  38   Wednesday, November 27, 2013, 17:56 John WongUCx#8LP-IG-LISITETM439814-IV SpentUCx#8 target description

Wednesday, November 27, 2013, 17:49

UCx#8 target description - see attachment#1


 

Attachment 1: UCx_8_specification.PNG
UCx_8_specification.PNG
  35   Friday, August 30, 2013, 12:08 John WongUCx#7LP-SISITWTM138634-739230-4SpentUCx#7 - target description

Friday, August 30, 2013, 12:06

UCx#7 target specification, see attachment #1.

The target is assembled and going online soon.


Attachment 1: UCx#7_specifications.PNG
UCx#7_specifications.PNG
  33   Thursday, May 30, 2013, 16:58 John WongUCx#6LP-SIS TM139165-639230-8SpentUCx#6 - target description

 Thursday, May 30, 2013, 16:57

UCx#6 target specification, see attachment #1. 

The target is currently undergoing the final conditioning in the Evaporator#1.


 Wednesday, June 12, 2013, 17:10

Target is assembled and stored in the Ar glove box.

It's ready to go into the Hotcell.


 

Attachment 1: UCx#6_specifications.PNG
UCx#6_specifications.PNG
  27   Wednesday, August 29, 2012, 14:52 John WongUCx#5LP-SISITWTM439165-5 FailedUCx#5 target description

Wednesday, August 29, 2012, 14:50

UCx#5 target description, see attachment#1

The target is currently undergoing the final conditioning in the Evaporator #1. 


 Wednesday, December 05, 2012, 15:46

This target was broken right before the end of the final run.  The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357

Looks like the protective layer (TaC coating) was worn out over the course of the run time. 

We need to improve the target coating so this can be prevented in the future.

More info about this later...


 

Attachment 1: UCx#5_specifications.PNG
UCx#5_specifications.PNG
  140   Wednesday, May 22, 2024, 22:32 Darwin Ortiz RosalesUCx#45LP-SIS  45220-9 ReadyUCx#45_Description
Attachment 1: UCx#45_Description.png
UCx#45_Description.png
  138   Tuesday, October 24, 2023, 11:30 Darwin Ortiz RosalesUCx#44LP-FEBIAD  41790-7 ReadyUCx#44_Description

Three Ta heatshields left installed on container.

Attachment 1: UCx#44_Description.png
UCx#44_Description.png
  134   Wednesday, July 26, 2023, 12:03 Darwin Ortiz RosalesUCx#43LP-SIS  45447-11 ReadyUCx#43_Description
Attachment 1: UCx#43_Description.png
UCx#43_Description.png
  133   Wednesday, July 26, 2023, 09:42 Darwin Ortiz RosalesUCx#42LP-SIS  45220-1 ReadyUCx#42_Description
Attachment 1: UCx#42_Description.png
UCx#42_Description.png
  123   Tuesday, October 25, 2022, 13:10 Darwin Ortiz RosalesUCx#40LP-SIS  45550-2 ReadyUCx#40 Target Description

Tuesday, October 25, 2022, 13:10

Target in Glovebox

Attachment 1: UCx#40_Description.png
UCx#40_Description.png
  25   Friday, July 20, 2012, 11:39 John WongUCx#4LP-SISITWTM138634-936833-4SpentUCx#4 target description

Friday, July 20, 2012, 11:35

UCx#4 target description, see attachment#1

The target is assembled and stored in the Ar-glove box.  It will be transported to the South Hotcell on July 31, 2012.


 

Attachment 1: UCx#4_specfications.PNG
UCx#4_specfications.PNG
ELOG V2.9.2-2455