ID Date Author Target/No.# Source Station Moduledown Target Oven W.O# Heat Shield W.O# Status Subject
  3   Tuesday, March 29, 2011, 14:14 John WongTa#35HP-SISITETM438481-338303-4SpentITE-TM4-Ta#35-Hp-SIS

ITE-TM4-Ta#35-Hp-SIS

Thu Apr 7 15:32:32 2011:

Target oven - w.o#38481-3.

Packs of Ta foils were previously prepared by Vicky H.

Marik loaded the target:  400 of 0.025mm foils (25 foils/pk) in 3.5cm length.  (Recommended length 4.0-4.5cm; If too closely packed, wires get squeezed and snapped)

Average mass per discs = 0.105g

Total mass (Ta+wire) = 45.06g

Disc area = 2.12cm2

Ta thickness = 21.25g/cm2

Thu Apr 28 :

Target heat Shield (w.o 38303-4) cleaned

Target is now assembled by John and Rick

Megger Test Performed:

TA-->HS = 540V, OL

TA-->EE = 540V, OL 

HS--> EE = 1049V, OL

Leak Check OK

*SIS restraint used in this target ion source

Mon May 9 10:32:40 2011:  Standard salts added: Li, Na, Rb @ 10uL, K @ 5uL (but added 10uL), Cs @ 15uL.  Target will be going to the test stand.

Fri May 20 16:57:22 2011: 

Target was tested on the Test Stand but problems with the software (see Test stand elog). 

Standard salts added: Li, Na, Rb @ 10uL, K @ 5uL (but added 10uL), Cs @ 15uL, and Be @ 10uL.

Monday, July 18, 2011, 11:15:  Target ended on July 16.  The target was used online for an extra 2 weeks and performed very well. 

 

 

Attachment 1: Ta-HPSIS.jpg
Ta-HPSIS.jpg
  4   Thursday, March 31, 2011, 15:38 John WongSiC#25HP-SISITETM438481-138307-?SpentITE-TM4-SiC#25-Hp-SIS

Thu Mar 31 15:19:51 2011:  SiC#25 was made sometime in December of 2010.  It is now in the target module and ready to be conditioned. 

Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand.  However,  there were enough 40Ca and 39K  for tuning (See attachment#1 for the big mass scan).  Once the P+ is back, the yields will be measured.

Fri Apr 29 15:30:26 2011:  Low 27Al was ionized from the surface for some reason.  However, after the green laser was shone into the extraction tube, more 27Al was produced.  Then, the laser was turned off, the target continued to surface ionizing 27Al.  There could be a blockage from the rhenium (Re) ionizer foil.  Jens L. will investigate this further and do a test with the lasers and the rhenium foil.

 

 


Attachment 1: big_mass_scan.jpg
big_mass_scan.jpg
  12   Wednesday, July 06, 2011, 14:32 John WongTa#36LP-SISITETM438634-238307-10SpentTarget ready, will go online on July 27

Ta-LP-SIS (w.o#38634-2)

Target consists of 400 Ta foils, 4.4 cm in length.  Total mass + Ta wire = 40.87g.

Thursday, July 07, 2011, 15:43:  Begin target assembly. 

Friday, July 08, 2011, 14:24: assembly completed.  Std stds added for test-stand: Li, Na, Rb, K, Cs.

Friday, July 15, 2011, 09:09:  Target currently in test-stand.  Will come out on Monday next week.  Need to add std salts + Be. 

Monday, July 18, 2011, 10:58:  Target removed from test-stand.  Std salts added (Li, Na, Rb, K, Cs) & Be (as requested by Jens).  Maico D.V will do a final inspection on the target before it goes into the hotcell

 

  15   Friday, September 23, 2011, 17:03 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

Friday, September 23, 2011, 16:54:

  • Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
  • The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.

 

  • Target is now in the test stand and pumping down.
  17   Monday, October 17, 2011, 14:45 John WongSiC#26HP-FEBIADITETM438295-938307-8SpentRun finished

Anders Mjos wrote:

Friday, September 23, 2011, 16:54:

  • Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
  • The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.

 

  • Target is now in the test stand and pumping down.

 Monday, October 17, 2011, 14:41

After the test-stand, the extraction electrode showed some electric arcing mark, but no solid deposits were found.  (see attachment#1: EE_after_teststand.jpg)

See attachment for the target specification.  

Attachment 1: EE_after_teststand.jpg
EE_after_teststand.jpg
Attachment 2: SiC#26_specification.png
SiC#26_specification.png
  20   Monday, February 20, 2012, 16:39 John WongUO2/Nb #1LP-FEBIADITETM438481-9 Spenttarget ready for assembly

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

  21   Thursday, May 24, 2012, 11:04 John WongSiC#27HP-SISITETM438817-339069-2SpentHP-SIS SiC27 target description

 Thursday, May 24, 2012, 10:34

SiC#27- HPSIS target description: 

Total SiC foils = 240 discs

Total SiC+ C-grv = 27.79g

Total length = 8.3cm 

Average mass of SiC/disc (without C-grv) = 0.085g 

Average thickness of SiC (without C-grv) = 0.24mm  

No Rh foil added

Salt added = 10uL Li, 10uL Na 

see attachment#1: SiC#27_density measurements

see link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8530


 

Attachment 1: SiC#27_specification.png
SiC#27_specification.png
  24   Wednesday, July 04, 2012, 11:32 Anders MjosUO2/Nb #1LP-FEBIADITETM438481-939069-3Spenttarget assembled

John Wong wrote:

 Monday, February 20, 2012, 16:25

Mass of empty target oven used = 461.55g

Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 

Target finished the sintering process on Feb 20, 2011.  

U(402 foils) mass = 35.689g

U(402 foils) thickness = 16.834 g/cm2

Target is stored in the Hotlab and ready for assembly. 


 

Target assembled with new anode end cap.

See attachment for gap size and DocuShare for further information.

Attachment 1: UO2#3_Anode_End_Cap.xlsx
  26   Wednesday, August 01, 2012, 09:37 Pierre BricaultITE-TM4-UO#3LP-FEBIADITETM4  Problems/SolutionsShort has developed while lowering the cathode heater

 On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed. 

The polarity swap was not possible because the target/tube assembly has also a short to common. 

We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back to the common. 

The anode short disappear during the cathode and target heating. 

  27   Wednesday, August 29, 2012, 14:52 John WongUCx#5LP-SISITWTM439165-5 FailedUCx#5 target description

Wednesday, August 29, 2012, 14:50

UCx#5 target description, see attachment#1

The target is currently undergoing the final conditioning in the Evaporator #1. 


 Wednesday, December 05, 2012, 15:46

This target was broken right before the end of the final run.  The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357

Looks like the protective layer (TaC coating) was worn out over the course of the run time. 

We need to improve the target coating so this can be prevented in the future.

More info about this later...


 

Attachment 1: UCx#5_specifications.PNG
UCx#5_specifications.PNG
  29   Thursday, October 11, 2012, 11:41 John WongNiO#1HP-FEBIADITETM438481-739069-1/10(lid)SpentNiO target description

(Should have posted this before my long vacation... Anyway, it's for documentation)

Thursday, October 11, 2012, 11:38

 

NiO/Ni #1 Average
NiO +  Ni  (g) 0.109
NiO - Ni foil (g) 0.06
NiO + Ni  thickness (mm) 0.116
NiO - Ni Thickness (mm) 0.091
Area (cm2) 2.212
NiO + Ni - organics 8.95% (g) 0.099
NiO - Ni - Organics (g) 0.055
NiO Density (g/cm3) 2.145 (32%)

 

Target contains 500 NiO/Ni discs and is measured at 9.0 in length.

  30   Tuesday, December 11, 2012, 15:44 Anders MjosSiCHP-FEBIADITWTM4nana (old style fittings)ReadyTest target for the Conditioning Station

 The target has been used for operator training previously at the ISAC Test Stand.

  • 9-pin connector was completed and grounded
  • RH gripper arms added to the heat shield

Further documentation on DocuShare

  31   Tuesday, March 19, 2013, 13:32 John WongSiC#28-RFQLP-SIS TM4LP-RFQ (NEW) SpentSiC#28-RFQ target description

 Tuesday, March 19, 2013, 12:28

SiC#28 - RFQ target description: 

Total SiC foils = 325 discs

Total SiC + C-grv foils = 38.48 g 

Total length = 10.9cm 

Average mass of SiC/disc (without graphite foil) = 0.083 g

Average thickness of SiC (without graphite foil) = 0.18 mm 

No Rh foil added

See attachment #1:  SiC#28 RFQ density measurements 

See link for more details:  https://documents.triumf.ca/docushare/dsweb/View/Collection-9771


 

 

Attachment 1: SiC#28_RFQ_density_measurements.xlsx
  34   Wednesday, July 10, 2013, 18:41 John WongSiC#29HP-FEBIAD-CTLITETM438481-639956-4SpentSiC#29 - Target description

Wednesday, July 10, 2013, 18:32 

SiC#29 HP-FEBIAD-CTL target description: 

Total SiC foils = 510 discs 

Total mass SiC + C_grv foils = 62 g (before sintering, expecting ~13% loss of organic mass after burnt off) 

Average mass SiC/disc (without C_grv) = 0.0892 g

Average thickness SiC (without C_grv) = 0.21mm 

No Rh foil and salt added for this run. 

See attachment #1 for the density measurement.  


 Wednesday, July 10, 2013, 18:40

Target is currently in the Test-Stand.  Once it's tested; it is ready to go online.  

Happy Beaming! 


 

Attachment 1: SiC#29_density_measurements_final.xlsx
  37   Friday, October 25, 2013, 17:35 John WongTa#41HP-SISITWTM438817-10 SpentTa#41 target description

Friday, October 25, 2013, 17:35

Ta#41 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69g/cm3

Target length = 4.0cm

Total Mass (400 foils + Ta wire) = 42.19g


 

  38   Wednesday, November 27, 2013, 17:56 John WongUCx#8LP-IG-LISITETM439814-IV SpentUCx#8 target description

Wednesday, November 27, 2013, 17:49

UCx#8 target description - see attachment#1


 

Attachment 1: UCx_8_specification.PNG
UCx_8_specification.PNG
  39   Monday, March 17, 2014, 16:15 John WongTa#42LP-SISITWTM440282-139956-1SpentTa#42 Target description

Monday, March 17, 2014, 16:14

Ta#42 LP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.2cm

Total Mass (400 foils + Ta wire) = 45.899g


 

  44   Tuesday, July 15, 2014, 11:01 Laura LambertUCx # 10LP-SISITETM439165-10 ReadyUCx#10 Target Description

Tuesday, July 15, 2014, 10:58

See attachment for target description 

Attachment 1: UCx_10_target_description.PNG
UCx_10_target_description.PNG
  47   Thursday, September 25, 2014, 16:01 Laura LambertTa#44HP-SISITETM438817-940316-11ReadyTa#44 target description

Thursday, September 25, 2014, 15:59

Ta#44 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.5cm

Total Mass (400 foils + Ta wire) = 47.49g


 

  48   Thursday, November 06, 2014, 13:35 Laura LambertUCx # 11LP-SISITETM440282-5 ReadyUCx#11 Target Description

 Thursday, November 06, 2014, 13:29

See attachment for target description


 

Attachment 1: UCx_11_target_description.PNG
UCx_11_target_description.PNG
ELOG V2.9.2-2455