ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
7
|
Friday, June 03, 2011, 09:16 |
John Wong | Ta#37 | LP-SIS | ITW | TM1 | 38634-5 | 36833-7 | Spent | Target is done | Fri Jun 3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk), 4.0 cm in length. Total mass + Ta wire = 42.32g. The heat shield was assembled and tested, and the standard salts were added. Target was installed in the test stand on Jun 1, 2011.
Fri Jun 17 09:19:46 2011: The following salts have been added: Li, Na, Rb @ 10uL, K @ 5uL, Cs @ 15uL, and Be @ 10uL.
Wednesday, July 06, 2011, 14:08: TM1 is still under repairing. It was tested at the test-stand. Target is on the shelve and ready to be used.
Tuesday, July 26, 2011, 15:58: Salt added before going into the hotcell: Li,Na,Rb,K,Cs. Target is ready to be used for TM1 test.
Wednesday, July 27, 2011, 10:48: It was found that the extraction electrode had some arc marking on it (see attachment: EE). Investigating...
Wednesday, July 27, 2011, 12:51: After further investigation on the extraction electrode, we found some black and blue(or green) deposit on the outside surface and inside of the EE. This deposit is most likely copper oxide, which formed during the HV test. The EE was removed, and wiped clean with methanol. (see attachment: EE_CuO). This target will be used in TM1.
Friday, August 26, 2011, 09:48: As per Friday Aug 26 TIS meeting, bNMR is very satisfied with the beam; the count rate is very stable.
|
13
|
Tuesday, August 09, 2011, 14:31 |
John Wong | UCx#2 | LP-SIS | ITW | TM1 | 38634-8 | 38633-5 | Spent | UCx#2 run is finished. | UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Total UC2/C foils = 245 discs
Total U/cm2 = 15.27g
Standard salts = 10uL Na, 10uL Li
Tuesday, August 09, 2011, 14:27:
Target came out from the glovebox and transported to the cold lab for assembly. During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead).
The target was leak checked and fine.
Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).
Tuesday, October 04, 2011, 10:21
UCx#2 run was finished last week.
Target was moved from ITW to south hot cell, and stored in a bucket under argon feed.
|
18
|
Wednesday, November 16, 2011, 14:08 |
John Wong | UCx#3 | LP-SIS | ITW | TM1 | 38634-10 | 36833-3 | Spent | UCx#3 ready to go online | Wednesday, November 16, 2011, 13:51
UCx#3 descriptions:
Target oven wrapped with 3-Ta heat shields, including the back block (see attachment#1)
Total UCx/C discs = 365
Total disc length = 12.9cm
UC2/C (365 foils) = 44.76 g
UC2/C (365 foils) - organics = 39.24g
U (365 foils) = 34.05g
U (365 foils) thickness = 16.03 g
Salts added: Na, Li, K, Rb, & Ce. |
19
|
Monday, February 13, 2012, 16:00 |
John Wong | Nb#6 | LP-SIS | ITW | TM1 | 38634-4 | 36833-1 | Spent | Nb#5 ready in the Conditioning Station |
Monday, February 13, 2012, 16:00
Nb#5 target description:
Total Nb foils = 400
Total Mass (400 foils + Ta wire) = 24.52g
Total Length = 4.0cm
Target thickness = 11.57 g/cm2
Target Density = 8.57g/cm3
Inserted Rh foil (1cmx1cm)
Added standard salts before test-stand:
15ml Cs
10ml Li, Na, Rb
5ml K
Monday, April 23, 2012, 08:58
Target was tested in the test stand, see https://elog.triumf.ca/TIS/Test-Stand/77 for more details.
No salts were added after the test. The target is now in the conditioning station.
|
22
|
Friday, June 01, 2012, 11:43 |
John Wong | Ta#38 | LP-SIS | ITW | TM1 | 39165-2 | 38633-2 | Spent | Ta#38 target description | Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil thickness = 0.025mm
Target density = 16.69 g/cm3
Target area = 2.12cm2
Target length = 4.3cm
Total Mass (400 foils + Ta wire) = 42.8013g
See the link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8541
Friday, June 01, 2012, 11:36
The target is now in the test-stand, and by next week Tuesday, it should go in the Hotcell.
Monday, June 04, 2012, 16:56
The target was tested in the Test-stand. The EE was inspected and a small amount of deposit was discovered after the test (the same stuff was found on Ta#36), see attachment #1. The samples were collected and will be analyzed through SEM/EDX/XRD.
The EE and the common plate were cleaned with methanol and were assembled back.
The target is ready to go in the Hotcell tomorrow, June 05.
Monday, November 05, 2012, 16:42
The deposits on the EE and CC were analyzed using XRD
On the EE, it was mainly copper hydroxide nitrate, Cu2(OH)3(NO3). (see attachment #2)
On the CE, it was mainly tantalum, Ta. (see attachment #3)
|
23
|
Monday, June 11, 2012, 13:46 |
John Wong | Nb#6 | LP-SIS | ITW | TM1 | 38634-4 | 36833-1 | Spent | Nb#5 run finished |
John Wong wrote: |
Monday, February 13, 2012, 16:00
Nb#5 target description:
Total Nb foils = 400
Total Mass (400 foils + Ta wire) = 24.52g
Total Length = 4.0cm
Target thickness = 11.57 g/cm2
Target Density = 8.57g/cm3
Inserted Rh foil (1cmx1cm)
Added standard salts before test-stand:
15ml Cs
10ml Li, Na, Rb
5ml K
Monday, April 23, 2012, 08:58
Target was tested in the test stand, see https://elog.triumf.ca/TIS/Test-Stand/77 for more details.
No salts were added after the test. The target is now in the conditioning station.
|
Monday, June 11, 2012, 13:42
The Nb#5 run was good. The target is now in the storage.
see https://elog.triumf.ca/TIS/RH-ISAC/124
|
25
|
Friday, July 20, 2012, 11:39 |
John Wong | UCx#4 | LP-SIS | ITW | TM1 | 38634-9 | 36833-4 | Spent | UCx#4 target description | Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box. It will be transported to the South Hotcell on July 31, 2012.
|
27
|
Wednesday, August 29, 2012, 14:52 |
John Wong | UCx#5 | LP-SIS | ITW | TM4 | 39165-5 | | Failed | UCx#5 target description | Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1.
Wednesday, December 05, 2012, 15:46
This target was broken right before the end of the final run. The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357
Looks like the protective layer (TaC coating) was worn out over the course of the run time.
We need to improve the target coating so this can be prevented in the future.
More info about this later...
|
30
|
Tuesday, December 11, 2012, 15:44 |
Anders Mjos | SiC | HP-FEBIAD | ITW | TM4 | na | na (old style fittings) | Ready | Test target for the Conditioning Station | The target has been used for operator training previously at the ISAC Test Stand.
- 9-pin connector was completed and grounded
- RH gripper arms added to the heat shield
Further documentation on DocuShare |
32
|
Thursday, April 11, 2013, 14:30 |
John Wong | Ta#39 | LP-SIS | ITW | TM1 | 39165-7 | | Spent | Ta#39 target description | Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Target density = 16.69 g/cm3
Target length = 4.1cm
Total Mass (400 foils + Ta wire) = 43.15g
Disc area = 2.12 cm2
Ta thickness = 20.354g/cm2
See link for more details:
http://documents.triumf.ca/docushare/dsweb/View/Collection-9934
|
35
|
Friday, August 30, 2013, 12:08 |
John Wong | UCx#7 | LP-SIS | ITW | TM1 | 38634-7 | 39230-4 | Spent | UCx#7 - target description | Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
|
37
|
Friday, October 25, 2013, 17:35 |
John Wong | Ta#41 | HP-SIS | ITW | TM4 | 38817-10 | | Spent | Ta#41 target description | Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Target density = 16.69g/cm3
Target length = 4.0cm
Total Mass (400 foils + Ta wire) = 42.19g
|
39
|
Monday, March 17, 2014, 16:15 |
John Wong | Ta#42 | LP-SIS | ITW | TM4 | 40282-1 | 39956-1 | Spent | Ta#42 Target description | Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Target density = 16.69 g/cm3
Target length = 4.2cm
Total Mass (400 foils + Ta wire) = 45.899g
|
43
|
Tuesday, July 15, 2014, 10:54 |
Laura Lambert | Ta # 43 | LP-SIS | ITW | TM1 | 40282-2 | | Ready | Ta # 43 Target Description | Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Target density = 16.69 g/cm3
Target length = 4.9cm
Total Mass (400 foils + Ta wire) = 45.920g
|
45
|
Monday, July 28, 2014, 15:57 |
John Wong | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | | Spent | ZrC target description | Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description.
Target is currently undergoing the sintering process
|
50
|
Friday, April 17, 2015, 16:00 |
Laura Lambert | UCx # 12 | LP-SIS | ITW | TM1 | 41177-2 | | Ready | UCx#12 Target Description | Thursday, April 16, 2015, 14:07
See attachment for target description |
52
|
Wednesday, June 03, 2015, 10:55 |
Laura Lambert | ZrC#7 | LP-SIS | ITW | TM2 | 41177-1 | | Ready | ZrC#7 target description | Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
|
53
|
Monday, July 06, 2015, 12:18 |
John Wong | ZrC#7 | LP-SIS | ITW | TM2 | 41177-1 | | Failed | ZrC#7 target description |
Laura Lambert wrote: |
Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
|
Monday, July 06, 2015, 12:10
This target did not pass the test-stand and will not be used for online (unless if it gets approved). The target container is deformed. An increase of voltage was observed during the test; perhaps it's a sign of the container being cracked?! See Test-stand e-log#450 for more details.
Another target is already prepared and being tested. (Target Oven WO# 41177-2).
|
54
|
Tuesday, July 07, 2015, 13:00 |
John Wong | ZrC#7 | LP-SIS | ITW | TM2 | 41177-2 | | Ready | ZrC#7 (backup1) target description | Tuesday, July 07, 2015, 12:36
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process)
Note: The theoretical length (ZrC + graphite foils) is 10.52cm After the sintering process, the stack of discs expanded in length. To avoid crushing the materials while inserting the endcaps, the discs are gentally packed to 13.2cm.
(see attachments for more details)
|
60
|
Friday, March 04, 2016, 14:57 |
Laura Lambert | UCx#15 | LP-SIS | ITW | | 41077-1 | | Ready | UCx#15 Target Description | Friday, March 04, 2016, 14:56
Attached please find the UCx#15 target description.
Note: This is the second UCx target using the new LP-SIS small center block design.
|
|