Entry  Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description UCx_23-target_description.JPG

Friday, July 13, 2018, 14:40

Target is ready for installation. 

See attachment for description


 

Entry  Monday, August 27, 2018, 17:11, John Wong, UCx#24, LP-SIS, , , , , Ready, UCx#24 Target Description  Capture.JPG

Monday, August 27, 2018, 17:09

See attachment for UCx#24 target description


 

Entry  Friday, October 12, 2018, 17:14, John Wong, UCx#25, LP-SIS, , , , , In progress, UCx#25 Target Description UCx#25_target_description.JPG

Friday, October 12, 2018, 17:11

See attachment for UCx#25 target description.


 

Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 

 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from the module.

The multipin shoulder bolts were removed and then the multipin was able to be pried off.

However the NHC manipulator were not able to reach the guide pin to remove it, which would be required before the SiC#43 could be installed.

The target module was then moved to the SHC where the guide pin could be removed and the installation of SiC#43 took place, along with the transfer of the parasitic attachment onto the SiC#43.

This problem seems to suggest that the multipin could use some redesign to ensure smoother target exchanges.

Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf

 Tantalum - Standard foils.

MTR PO: TR-2022-03028

Average foil thickness: 0.0013"