Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 8 of 8  Not logged in ELOG logo
Entry  Monday, October 15, 2018, 07:36, Aaron Schmidt, Ta#57, , ITE, TM4, 41177-3, , , Ta#57 Target Description. 

(Laura Lambert: Evap 2 Elog ID: 404) Tuesday, April 17, 2018, 10:20

Target consists of 470 discs.

Total packed length 3.4cm [exactly 7.8cm space on both sides]

Total mass g [Incl foils + Ta wire on 6 packs]

Target consists of 350 single discs and 6x20 packs of Ta discs

Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack

 

Weight not included. Should be identical to Ta#54 (Below)

 


Comparable as the foils are all 0.001" & the quantities are the same. 

(Laura Lambert: Target Production Elog ID: 79)

Ta#54 HP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density = 14.72 g/cm3

Target length = 3.4cm

Total Mass = 50.0372g [Incl foils + Ta wire on 6 packs]

Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 

 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from the module.

The multipin shoulder bolts were removed and then the multipin was able to be pried off.

However the NHC manipulator were not able to reach the guide pin to remove it, which would be required before the SiC#43 could be installed.

The target module was then moved to the SHC where the guide pin could be removed and the installation of SiC#43 took place, along with the transfer of the parasitic attachment onto the SiC#43.

This problem seems to suggest that the multipin could use some redesign to ensure smoother target exchanges.

Entry  Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, C#5, , , , 44691-13, , Ready, Target C#5 Description C#5_Description.png

Graphite target

Entry  Monday, February 06, 2023, 10:02, Darwin Ortiz Rosales, C#6, , , , 45220-6, , Ready, Target C#6 Description C#6_Description.png
 
Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf

 Tantalum - Standard foils.

MTR PO: TR-2022-03028

Average foil thickness: 0.0013"

ELOG V2.9.2-2455