ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  83   Friday, July 13, 2018, 14:41 John WongUCx#23LP-FEBIAD-CTL    ReadyUCx#23 target descriptionFriday, July 13, 2018, 14:40
Target is ready for installation. 
See attachment for description
 UCx_23-target_description.JPG 
  84   Monday, August 27, 2018, 17:11 John WongUCx#24LP-SIS    ReadyUCx#24 Target Description Monday, August 27, 2018, 17:09
See attachment for UCx#24 target
description
 Capture.JPG 
  86   Friday, October 12, 2018, 17:14 John WongUCx#25LP-SIS    In progressUCx#25 Target DescriptionFriday, October 12, 2018, 17:11
See attachment for UCx#25 target
description.
 UCx#25_target_description.JPG 
  118   Tuesday, June 21, 2022, 15:34 Matthew GareauSiC#42, SiC#43  TM2  Problems/SolutionsMultipin guide pin issues While removing the SiC#42 it became
apparent that the multipin guide pin had
become loose again and was not allowing the
  
  128   Friday, March 10, 2023, 07:21 Aaron Schmidt      ReadyTarget Material Batch - Ta Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013"
 Ta_2023_-_01.pdf 