Entry  Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description UCx_23-target_description.JPG
Friday, July 13, 2018, 14:40
Target is ready for installation. 
See attachment for description
Entry  Monday, August 27, 2018, 17:11, John Wong, UCx#24, LP-SIS, , , , , Ready, UCx#24 Target Description  Capture.JPG
Monday, August 27, 2018, 17:09
See attachment for UCx#24 target description

 
Entry  Friday, October 12, 2018, 17:14, John Wong, UCx#25, LP-SIS, , , , , In progress, UCx#25 Target Description UCx#25_target_description.JPG
Friday, October 12, 2018, 17:11
See attachment for UCx#25 target description.

 
Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 
 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from
the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off.
Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf
 Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013"