ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject
  83   Friday, July 13, 2018, 14:41 John WongUCx#23LP-FEBIAD-CTL    ReadyUCx#23 target description

Friday, July 13, 2018, 14:40

Target is ready for installation. 

See attachment for description


 

  84   Monday, August 27, 2018, 17:11 John WongUCx#24LP-SIS    ReadyUCx#24 Target Description

Monday, August 27, 2018, 17:09

See attachment for UCx#24 target description


 

  86   Friday, October 12, 2018, 17:14 John WongUCx#25LP-SIS    In progressUCx#25 Target Description

Friday, October 12, 2018, 17:11

See attachment for UCx#25 target description.


 

  118   Tuesday, June 21, 2022, 15:34 Matthew GareauSiC#42, SiC#43  TM2  Problems/SolutionsMultipin guide pin issues

 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from the module.

The multipin shoulder bolts were removed and then the multipin was able to be pried off.

However the NHC manipulator were not able to reach the guide pin to remove it, which would be required before the SiC#43 could be installed.

The target module was then moved to the SHC where the guide pin could be removed and the installation of SiC#43 took place, along with the transfer of the parasitic attachment onto the SiC#43.

This problem seems to suggest that the multipin could use some redesign to ensure smoother target exchanges.

  128   Friday, March 10, 2023, 07:21 Aaron Schmidt      ReadyTarget Material Batch - Ta

 Tantalum - Standard foils.

MTR PO: TR-2022-03028

Average foil thickness: 0.0013"