ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
65
|
Tuesday, August 02, 2016, 15:28 |
Laura Lambert | UCx#17 | LP-SIS | | | 41790-3 | | Ready | UCx#17 Target Description | Tuesday, August 02, 2016, 15:27
Attached please find the UCx#17 target description.
|
Attachment 1: UCx#17_description.jpg
|
|
63
|
Wednesday, June 08, 2016, 15:55 |
Laura Lambert | UCx#16 | LP-IG-LIS | | | 40860-2 | | Ready | UCx#16 Target Description | Wednesday, June 08, 2016, 15:52
Attached please find the UCx#16 target description.
|
Attachment 1: Target_Description.JPG
|
|
60
|
Friday, March 04, 2016, 14:57 |
Laura Lambert | UCx#15 | LP-SIS | ITW | | 41077-1 | | Ready | UCx#15 Target Description | Friday, March 04, 2016, 14:56
Attached please find the UCx#15 target description.
Note: This is the second UCx target using the new LP-SIS small center block design.
|
Attachment 1: UCx_15_description.jpg
|
|
59
|
Monday, October 26, 2015, 16:33 |
Laura Lambert | UCx#14 | LP-SIS | | | 41077-5 | | Ready | UCx#14 Target Description | Monday, October 26, 2015, 16:23
Attached please find the UCx#14 target description.
Note: This is the first UCx target using the new LP-SIS small center block design.
|
Attachment 1: Capture.JPG
|
|
55
|
Friday, July 10, 2015, 11:23 |
John Wong | UCx#13 | LP-IG-LIS | ITE | TM4 | 40860-1 | | Ready | UCx#13 Target description | Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.
Note: Target container was coated/sintered with TaC twice. Would like to see if this will improve the life-span of the target.
|
Attachment 1: UCx_13_target_description.PNG
|
|
50
|
Friday, April 17, 2015, 16:00 |
Laura Lambert | UCx # 12 | LP-SIS | ITW | TM1 | 41177-2 | | Ready | UCx#12 Target Description | Thursday, April 16, 2015, 14:07
See attachment for target description |
Attachment 1: UCx_12_target_description.PNG
|
|
48
|
Thursday, November 06, 2014, 13:35 |
Laura Lambert | UCx # 11 | LP-SIS | ITE | TM4 | 40282-5 | | Ready | UCx#11 Target Description | Thursday, November 06, 2014, 13:29
See attachment for target description
|
Attachment 1: UCx_11_target_description.PNG
|
|
44
|
Tuesday, July 15, 2014, 11:01 |
Laura Lambert | UCx # 10 | LP-SIS | ITE | TM4 | 39165-10 | | Ready | UCx#10 Target Description | Tuesday, July 15, 2014, 10:58
See attachment for target description |
Attachment 1: UCx_10_target_description.PNG
|
|
93
|
Wednesday, October 02, 2019, 11:18 |
Marla Cervantes | UCx#28 | LP-SIS | | | 44062-4 | | Ready | UCx #28 Target description | Wednesday, October 02, 2019, 11:17
Attached please find the UCx#28 target description. |
Attachment 1: UCx28-target_description.JPG
|
|
145
|
Tuesday, September 10, 2024, 09:53 |
Darwin Ortiz Rosales | TiC#9 | HP-SIS | | | 45447-29 | 45235-19 | Ready | TiC#9_Description | |
Attachment 1: TiC#9.png
|
|
144
|
Tuesday, September 03, 2024, 16:11 |
Darwin Ortiz Rosales | TiC#8 | HP-FEBIAD | | | 45447-2 | | Ready | TiC#8_Description | This was back-up target |
Attachment 1: TiC#8_(2).png
|
|
142
|
Friday, June 14, 2024, 14:16 |
Darwin Ortiz Rosales | TiC#7 | HP-FEBIAD | | | 45447-5 | 45235-15 | Ready | TiC#7_Description | Please note that this target comes in a Graphite cartridge. |
Attachment 1: TiC#7.png
|
|
46
|
Monday, August 18, 2014, 14:39 |
Laura Lambert | ThO2 #1 | LP-SIS | | | | | | ThO2 #1 Target Description | Monday, August 18, 2014, 14:53
See attachment for target description
|
Attachment 1: ThO2#1_target_description.JPG
|
|
30
|
Tuesday, December 11, 2012, 15:44 |
Anders Mjos | SiC | HP-FEBIAD | ITW | TM4 | na | na (old style fittings) | Ready | Test target for the Conditioning Station | The target has been used for operator training previously at the ISAC Test Stand.
- 9-pin connector was completed and grounded
- RH gripper arms added to the heat shield
Further documentation on DocuShare |
12
|
Wednesday, July 06, 2011, 14:32 |
John Wong | Ta#36 | LP-SIS | ITE | TM4 | 38634-2 | 38307-10 | Spent | Target ready, will go online on July 27 | Ta-LP-SIS (w.o#38634-2)
Target consists of 400 Ta foils, 4.4 cm in length. Total mass + Ta wire = 40.87g.
Thursday, July 07, 2011, 15:43: Begin target assembly.
Friday, July 08, 2011, 14:24: assembly completed. Std stds added for test-stand: Li, Na, Rb, K, Cs.
Friday, July 15, 2011, 09:09: Target currently in test-stand. Will come out on Monday next week. Need to add std salts + Be.
Monday, July 18, 2011, 10:58: Target removed from test-stand. Std salts added (Li, Na, Rb, K, Cs) & Be (as requested by Jens). Maico D.V will do a final inspection on the target before it goes into the hotcell
|
11
|
Wednesday, July 06, 2011, 14:29 |
John Wong | Nb/Spare | HP-SIS | | | 38817-2 | | In progress | Target ready for Assembly | Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right = 18.16mm.
Filled with 400 foils Nb (16pk, 5 foils/pk).
Discs spec: 18.65mm/14.65mm, thickness = 0.022mm
Total mass + Ta-wire = 22.66g
total length = 4.5cm
Rn foil inserted for ionization. (0.1mm, 0.004", 1cm x 1cm)
|
8
|
Thursday, June 16, 2011, 17:26 |
John Wong | Nb | HP-SIS | | | 38817-1 | | Spent | Target is ready and stored in cabinet | Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:
-----------------------------------------------------------------------------------
Target oven w.o# 38817-1:
inner diameter: left = 18.27mm, right = 18.25mm.
Filled with 400 foils Nb (16pk, 5 foils/pk).
Discs spec: 18.65mm/14.65mm, thickness = 0.022mm
Total mass + Ta-wire = 22.74g
Total length = 4.5cm
Rn foil inserted for ionization. (0.1mm, 0.004", 1cm x 1cm)
------------------------------------------------------------------------------------
Wednesday, July 06, 2011, 14:35: Salts were added and tested in test-stand last 2 weeks.
|
7
|
Friday, June 03, 2011, 09:16 |
John Wong | Ta#37 | LP-SIS | ITW | TM1 | 38634-5 | 36833-7 | Spent | Target is done | Fri Jun 3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk), 4.0 cm in length. Total mass + Ta wire = 42.32g. The heat shield was assembled and tested, and the standard salts were added. Target was installed in the test stand on Jun 1, 2011.
Fri Jun 17 09:19:46 2011: The following salts have been added: Li, Na, Rb @ 10uL, K @ 5uL, Cs @ 15uL, and Be @ 10uL.
Wednesday, July 06, 2011, 14:08: TM1 is still under repairing. It was tested at the test-stand. Target is on the shelve and ready to be used.
Tuesday, July 26, 2011, 15:58: Salt added before going into the hotcell: Li,Na,Rb,K,Cs. Target is ready to be used for TM1 test.
Wednesday, July 27, 2011, 10:48: It was found that the extraction electrode had some arc marking on it (see attachment: EE). Investigating...
Wednesday, July 27, 2011, 12:51: After further investigation on the extraction electrode, we found some black and blue(or green) deposit on the outside surface and inside of the EE. This deposit is most likely copper oxide, which formed during the HV test. The EE was removed, and wiped clean with methanol. (see attachment: EE_CuO). This target will be used in TM1.
Friday, August 26, 2011, 09:48: As per Friday Aug 26 TIS meeting, bNMR is very satisfied with the beam; the count rate is very stable.
|
Attachment 1: EE.JPG
|
|
Attachment 2: EE-CuO.jpg
|
|
14
|
Tuesday, September 06, 2011, 13:19 |
John Wong | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | | Spent | Target is done | Tuesday, September 06, 2011, 13:14:
Average mass = 0.206g
Average Thickness = 0.0189 cm
Area of D-shaped disc = 2.21 cm2
D-shape discs diameter = 18.5mm (14.5mm cut-out length)
Oven ID, L= 18.22mm, R = 18.20mm
Density = 4.9266 g/cm3
% Yield Density = 47.20%
Attachment#1 - TaC density measurements.
Loaded target with 125 discs --> 9.6g Ta/cm2
Total discs mass = 30.41g
Total length = 4.5 cm
Thursday, September 15, 2011, 10:45
Na & Li were added.
Re foil inserted.
No Ta-heat shields required.
Friday, September 30, 2011, 14:10
After the test-stand, 10uL of Na and Li were added yesterday.
Target is now ready, and will be moved into the hotcell next week.
Wednesday, November 16, 2011, 15:51
After the target was finished and transferred into the hotcell, it was found that the target broke apart from the center block. This might have happened during the end of the target cooldown. See link for more details:
http://documents.triumf.ca/docushare/dsweb/View/Collection-7438
|
Attachment 1: TaC_density_measurements.xls
|
10
|
Wednesday, July 06, 2011, 14:13 |
John Wong | Ta#40 | HP-SIS | | | 38295-4 | | Spent | Target description | Details about Ta Hp surface, w.o#38295-4 (spare):
This target was built as a spare.
Note: Left side target arm replaced, Nov 18, 2010. Weld prep on centre block misaligned. (Marik has more details about this).
Packs of Ta foils were prepared by JW.
Target was filled with 400 of 0.025mm foils (25 foils/pk) in 4.0cm length.
Total Mass of 16 packs of Ta foils + Ta wires = 42.70g.
See attachment#1 for the measurement.
Friday, April 19, 2013, 09:44
Target was tested at the Teststand. Result Good.
Ready for use.
|
|